Loading...
HomeMy WebLinkAbout20210469 Fire Station #3 Council Advisory Opinion (2) C springs.org-www.saratoga 3550 x.2517-587-Tel: 518 Saratoga Springs, New York 12866 474 Broadway -City Hall  OMMISSION C EVIEW R ESIGN D PRINGS S ARATOGA S ITY OF Tamie Ehinger, Chair Chris Bennett Karen Cavotta Leslie DiCarlo Rob DuBoff Ellen Sheehan Tad Roemer Jeffrey Gritsavage, Alternate A DVISORY O PINION In consideration of the Request for a Revised Advisory Opinion by the City Council DRC App #20210469 Fire Station #3 16 Henning Road Saratoga Springs, New York 12866 Background: Pursuant to City Council action on July 6, 2021 requesting a revised advisory opinion from the Design Review Commission based on design changes following a previously issued unfavorable advisory opinion, this Board has heard presentations from the design team on July 7 and September 1, 2021. The DRC has reviewed this project based on the evaluation criteria outlined under Section 7.4 Historic Review of the Zoning Ordinance. As part of the Historic Review Standards, the DRC is tasked with assuring “architectural compatibility such as aesthetic, historical and architectural values, architecture style, design, arrangement, texture, material and color.” Decision: The Design Review Commission appreciates the work and design changes that the project has undergone in order to lead to a durable, prominent building with lasting significance. As a result, the DRC unanimously issues a revised favorable advisory opinion. Considerations:  The Design Review Commission recommends ensuring the use of quality materials and encourages the use of natural products, while discouraging vinyl.  The DRC feels the mass and scale of the structure appears appropriate.  The DRC noted interest in providing additional, substantive comments through subsequent design phases. Following much discussion on this matter, the Design Review Commission issued the following opinion on September 1, 2021: Motion to issue a Favorable Advisory Opinion to the City Council on the proposed project – passed 6-0 (Ehinger, Bennett, Cavotta, DuBoff, Sheehan, Gritsavage) Respectfully submitted, September 13, 2021 Chair, Design Review Commission Received by Accounts cc: Accounts Dept. Applicant/Agent Page 1 of 1