Loading...
HomeMy WebLinkAbout20210588 Top Dog Subdivision NOD rV 0G4 CITY OF SARATOGA SPRINGS c.,k '' MARK TORPEY,Chair PLANNING BOARD SARA BOIVIN,Vice Chair o a ._ . r _ ks 0 TODD FABOZZI ;',-, 'f--:- -_'-,VA17\t` 9 ,_ City Hall -474 Broadway RUTH HORTON ` LEXIE BONITATIBUS �: w '.,:A!'41,1 , Saratoga Springs, New York 12866 __ i KERRY MAYO �, Tel:5I8-587-3550 fax:5I8-580-9480 JASON DOTY RPORAT \ www.saratoga-springs.org SHAWNA JENKS,Alternate NOTICE OF DECISION IN THE MATTER OF THE APPLICATION #20210588 TOP DOG ENTERPRISES SUBDIVISION 46-46A SEWARD ST.AND 61 VAN DORN SARATOGA SPRINGS, NY 12866 Involving the premises with tax parcel #165.34-I-7 and 165.34-1-9, in the City of Saratoga Springs, on an application for final subdivision plat review of a four-lot residential subdivision within the Urban Residential — District with the Planning Board who met on July 15, 2021 and made the following decision(s)with a 5-0 vote (In favor: Torpey, Horton, Doty, Dal Pos,Jenks): In accordance with 6 NYCRR Part 617, the Planning Board classified this request as an Unlisted Action. Ei Issued a Negative SEQRA Declaration on April 30, 2020. Ei Issued preliminary subdivision plat approval of a four-lot residential subdivision as per the requirements set forth in the City of Saratoga Springs Subdivision Regulations with conditions on Feb. 25, 2021. Q Issued final subdivision plat approval of a four-lot residential subdivision as per the requirements set forth in the City of Saratoga Springs Subdivision Regulations with the following conditions on July 15, 2021: • Replace the water and sanitary sewer infrastructure along the southern side of lot 4. • Remove light fixture on the existing utility pole on Seward St. and replace with decorative street light within the tree belt along applicant's frontage on Seward per DPW satisfaction with coordination from National Grid. • No blasting shall occur on the property during site work or for future home construction. • One tree shown on private property to be relocated to ROW on Van Dorn. • Add easement for emergency vehicle turnaround at the end of lot 4 on Van Dorn. Easement language shall be to the satisfaction of the City Attorney. • Final plans shall be to the satisfaction of DPW and the City's Designated Engineer. • Applicant to improve stormwater management by infiltration and/or use of porous pavement. • Use variance for the day care center shall be extinguished with implementation of final subdivision approval. The applicant is required to complete the following as per the City of Saratoga Springs Subdivision Regulations: • Deliver a letter of credit or cash escrow as a performance guarantee to the City for required on-and off-site improvements. • Submit a fee in lieu of recreation of $2,000 for each new residential lot per Appendix A of the Subdivision Regulations. • Submit two (2) mylar and two (2) paper copies of the final approved subdivision plat for signature by the Planning Board Chair. • File the signed final subdivision plat with the Saratoga County Clerk within sixty-two (62) days as provided in Article 3, Section 32 of General City Law. This approval shall expire if not enacted within 180 days as set forth in the City of Saratoga Springs Subdivision Regulations Article II, Section I. D.15. -- 7/Wia,t/K's --1) ---' August 13, 2021 Date filed with the Accounts Dept. Chair cc: Zoning and Building Inspector, DPW, DPS,Accounts Dept.,Applicant, File