C2 Design Group
July 14, 2021
ES #19099
'a0' � 'OQ
Engineered Solutions O O 4 O O
646 Plank Road #104 O 0 O O O
Clifton Park, New York 12065 Q Q Q Q Q
www.engineered-solutions.net O O O Q ,�,
518.280.2410
engineeredsolutions
July 14, 2021
TABLE OF CONTENTS
1 Introduction 2
2 Proposed Systems 2
3 Emissions Calculations & Results 3
4 Conclusions & Recommendations 4
5 Appendix 5
Project #19099 Page 1 of 5
engineeredsolutions
July 14, 2021
Introduction•
In April of 2019, New York City passed an ambitious piece of legislation that is
focused on dramatically decreasing carbon emissions from buildings within the city.
NYC Local Law 97 of 2019 requires large and medium sized buildings to reduce
their emissions by 40% before 2030, and 80% by 2050. Anticipation of this law
expanding to the rest of the state and an eye towards environmental friendliness,
an analysis has been performed on the proposed Saratoga Office Building that will
be located at 269 Broadway, Saratoga Springs NY 12866 to project carbon dioxide
emissions. The results are as follows:
Proposed Systems•
The building, which consists of 106,700 square feet of office and mercantile space,
shall be served by the following building systems:
• LED lighting will be provided throughout the building.
• Building mounted exterior lighting.
• A water source heat pump system to provide heating and cooling to the
building.
• High Efficiency, condensing gas fired hot water heating plant to provide heat
to the system.
• A new Adiabatic Fluid Cooler for building heat rejection.
• (2) energy wheel type heat recovery units with gas fired heating and DX
cooling with hot gas reheat to provide neutral, dehumidified ventilation air to
the building.
• A new direct digital temperature control system.
• A dedicated exhaust/ventilation system will be provided for the parking
garage.
• In floor radiant heat to temper the parking garage.
Project #19099 Page 2 of 5
engineeredsolutions
July 14, 2021
• (2) Centrifugal exhaust Fans for Toilet Room exhaust.
• High Efficiency, Gas fired Condensing Domestic Water Heater system.
Emissions Calculations & Results:
The building was entered into Trane Trace 700 Load Calculation program, including,
but not limited to; location, envelope information, occupant and office equipment
data, scheduling, and proposed equipment efficiencies. As the plans currently only
reflect a building shell with limited detailing of bathrooms, stairwells, and an
elevator, some assumptions were made as follows:
• Excluding the mercantile area, the building will contain typical office occupant
density as calculated per the 2020 New York State Mechanical Code
(NYSMC).
• Excluding the mercantile area, the building will contain only typical office
equipment, i.e. computer workstations, copiers, kitchenette equipment, etc.
• Excluding the mercantile area, the building will operate with typical office
occupant schedules, with the building starting to be occupied around 7:00
am, being fully occupied from 8:00 am until 5:00 pm, and then people
filtering out after 5:00 until the following day.
• There is no potable water consumption beyond the toilet rooms presently
shown in the shell drawings.
From the entered data, Trace 700 calculated an annual energy consumption for the
electrical usage, natural gas for heating, and natural gas for potable water.
Utilizing the greenhouse gas coefficients of energy in paragraph 28-320.3.1, an
anticipated value for carbon dioxide productions in tons of CO2 from the structure
at 269 Broadway, Saratoga Springs NY 12866 was generated. That number was
then compared to the building emissions limits based off square footage and an
occupancy group of B from paragraphs 28-32.3.1, 28-320.3.2, and 28-320.3.4 to
determine compliance.
Project #19099 Page 3 of 5
engineeredsolutions
July 14, 2021
The calculation outputs are as follows:
C�R�C3�1 EMISSI��1S CP�LC�JLATfD�IS
Building Sq.ft. ia6,766(excluding parkinggarage}
Emission Lirnits 2624-2�29 O.Q6846 tC�72efsf paragraph 28-326.3.1,2
Erni�sions lirnits 2�3D-2�3A D.a0453 tC:�72efsf paragraph 28-32�.3.2,2
Ernissions lirnits 2�35-2456 a.6D14 tC42efsf paragraph 28-32a.3.�,2
Eleetrical gas consumption U.4U4288962 tC42efKWh paragraph 23-32a.3.b.1,�
Natural gas consumption 4.4466531P tCt72efkbtu paragraph 28-32a.3.�..b,2
Electrical Usage Gas Usage Allov,rable
Trace 7GG Values Emissions 2624 2Q3t} 2G35
kvPu bCa2e Therrn kbtu tCO2e (tC42e} until until until
2D29 263� 2456
Electrical Usage 1,543,iS9.0 445.9 ' ` ' `
Heating Gas Usage ;: - ;`; . 3,647 364,74U �77.2 9f}2.7 �83.4 2�4.�
31.2
aomestic Gas Usage 2,23Q 222,9�rG
Conclusions & Recommendations:
Based off of the analysis performed, including all available data and assumptions
made, the building is projected to be compliant with NYC Local Law 97 of 2019 until
the year 2034. When we near 2035, it is recommended that another analysis be
performed on the building, as there is likely to have been alterations and changes
to the floorplans, tenants, and equipment, as well as actual utility usage
information available for analysis.
Project #19099 Page 4 of 5
engineeredsolutions
July 14, 2021
Appendix•
• Monthly Energy Consumption
• Equipment Energy Consumption
Project #19099 Page 5 of 5
engineeredsolutions
EQUIPMENT ENERGY CONSUMPTION
By Engineered Solutions
Alternative: 1
------- Monthly Consumption -------
Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Lights
Electric(kWh) 24,245.5 21,922.2 25,669.5 23,233.8 24,957.5 24,657.7 23,533.5 25,669.5 23,233.8 24,957.5 23,945.7 23,533.5 289,559.8
Peak(kV� 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3
Misc. Ld
Electric(kWh) 38,629.7 34,941.9 41,762.0 36,878.4 40,195.9 40,010.7 37,063.5 41,762.0 36,878.4 40,195.9 38,444.5 37,063.5 463,826.2
Peak(kV� 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7
Cooling Coil Condensate
Recoverable Water(1000ga1) 0.0 0.0 0.0 0.2 0.2 2.3 6.4 4.4 0.7 0.2 0.2 0.1 14.5
Peak(1000ga1/Hr) 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1
Bsu 1: Domestic Hot Water Load
Proc. Hot Water(therms) 185.1 167.4 202.7 176.3 193.9 193.9 176.3 202.7 176.3 193.9 185.1 176.3 2,229.6
Peak(therms/Hr) 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1
Bsu 2: Parking lot lights
Electric(kWh) 806.0 728.0 806.0 780.0 806.0 780.0 806.0 806.0 780.0 806.0 780.0 806.0 9,490.0
Peak(kV� 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Bsu 3: Elevator 1
Electric(kWh) 1,338.8 1,211.3 1,466.3 1,275.0 1,402.5 1,402.5 1,275.0 1,466.3 1,275.0 1,402.5 1,338.8 1,275.0 16,128.8
Peak(kV� 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Bsu 4: Elevator 2
Electric(kWh) 1,338.8 1,211.3 1,466.3 1,275.0 1,402.5 1,402.5 1,275.0 1,466.3 1,275.0 1,402.5 1,338.8 1,275.0 16,128.8
Peak(kV� 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Bsu 5: Elevator 3
Electric(kWh) 1,338.8 1,211.3 1,466.3 1,275.0 1,402.5 1,402.5 1,275.0 1,466.3 1,275.0 1,402.5 1,338.8 1,275.0 16,128.8
Peak(kV� 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0
Cpl 1: WSHP System [Sum of dsn coil capacities=207.4 tons]
Water source heat pump- 001 [Clg Nominal Capacity/F.L.Rate=207.4 tons/ 160.6 kWJ (Cooling Equipment- Cooling Mode)
Electric(kWh) 7,476.3 6,694.3 11,469.1 12,783.9 24,625.4 29,400.1 31,473.1 31,041.3 22,459.6 16,760.0 12,138.3 7,137.5 213,458.8
Peak(kVV) 101.0 99.3 107.7 108.6 147.0 154.3 155.3 157.2 150.4 129.5 123.2 99.5 157.2
Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021
Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 1 of 4
EQUIPMENT ENERGY CONSUMPTION
By Engineered Solutions
Alternative: 1
------- Monthly Consumption -------
Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Cpl 1: WSHP System [Sum of dsn coil capacities=207.4 tons]
Water source heat pump- 001 [Htg Nominal Capacity/F.L.Rate=2,256 mbh / 137.7 kWJ (Cooling Equipment- Heating Mode)
Electric(kWh) 5,516.5 4,809.3 2,827.8 514.2 0.0 0.0 0.0 0.0 0.0 402.6 1,673.3 4,532.6 20,276.2
Peak(kV� 90.5 90.5 90.5 56.9 0.0 0.0 0.0 0.0 0.0 23.3 72.4 90.5 90.5
Default Free Cool Fluid Cooler[Design Heat Rejection/F.L.Rate=253.1 tons/43.96 kWJ
Electric(kWh) 1,615.3 1,427.6 2,574.9 2,982.5 5,827.8 7,078.7 8,142.0 7,560.4 5,348.7 3,894.1 2,800.4 1,596.3 50,848.6
Peak(kV� 21.7 21.1 23.5 24.6 30.9 34.4 37.6 35.9 34.2 28.7 26.8 21.6 37.6
Default Free Cool Fluid Cooler
Make Up Water(1000ga1) 0.0 0.0 0.0 0.0 5.0 47.1 62.8 55.5 18.5 0.0 0.0 0.0 188.9
Peak(1000ga1/Hr) 0.0 0.0 0.0 0.0 0.3 0.4 0.4 0.4 0.4 0.3 0.0 0.0 0.4
Varvol chill water pump [F.L.Rate=29.83 kWJ (MiscAccessory Equipment)
Electric(kWh) 745.7 660.3 1,007.2 1,102.6 2,668.8 3,684.6 4,314.4 4,015.6 2,531.4 1,531.1 1,090.5 708.1 24,060.3
Peak(kVV) 10.6 10.2 12.0 12.2 24.1 27.1 27.5 28.3 25.5 18.0 16.1 10.3 28.3
Constant volume pump [F.L.Rate=19.89 kWJ (MiscAccessory Equipment)
Electric(kWh) 8,431.4 7,536.6 6,303.7 6,761.0 7,834.8 7,755.3 8,232.6 7,854.7 7,357.6 7,655.9 5,846.3 7,457.0 89,026.8
Peak(kVV) 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9
Wshpcntl -WS heat pump control [F.L.Rate=0.03 kWJ (MiscAccessory Equipment)
Electric(kWh) 10.6 9.5 7.9 8.5 9.9 9.8 10.4 9.9 9.3 9.6 7.4 9.4 111.9
Peak(kV� 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Cpl 2: ERV Cooling [Sum of dsn coil capacities=58.33 tons]
Air-cooled unitary- 002 [Clg Nominal Capacity/F.L.Rate=58.33 tons/67.95 kWJ (Cooling Equipment)
Electric(kWh) 0.0 0.0 0.0 0.0 641.9 1,354.9 8,487.6 2,398.8 473.9 0.0 0.0 0.0 13,357.1
Peak(kVV) 0.0 0.0 0.0 0.0 9.9 31.6 60.6 39.5 9.3 0.0 0.0 0.0 60.6
Air-cooled cond fans cooling mode [Design Heat Rejection/F.L.Rate=77.65 tons/7.18 kWJ
Electric(kWh) 0.0 0.0 0.0 0.0 78.1 161.8 983.0 287.9 58.2 0.0 0.0 0.0 1,569.0
Peak(kVV) 0.0 0.0 0.0 0.0 1.2 3.7 6.8 4.6 1.1 0.0 0.0 0.0 6.8
Cntl panel & interlocks- 0.1 KW[F.L.Rate=0.10 kWJ (MiscAccessory Equipment)
Electric(kWh) 0.0 0.0 0.0 0.0 8.8 13.2 22.0 16.1 8.0 0.0 0.0 0.0 68.1
Peak(kVV) 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1
Hpl 1: WSHP Heating [Sum of dsn coil capacities=1,481 mbh]
Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021
Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 2 of 4
EQUIPMENT ENERGY CONSUMPTION
By Engineered Solutions
Alternative: 1
------- Monthly Consumption -------
Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Hpl 1: WSHP Heating [Sum of dsn coil capacities=1,481 mbh]
Boiler- 001 [Nominal Capacity/F.L.Rate=1,481 mbh/ 17.43 Therms] (Heating Equipment)
Gas(therms) 768.8 672.3 391.9 43.6 0.0 0.0 0.0 0.0 0.0 25.4 214.9 620.9 2,737.9
Peak(therms/Hr) 13.8 13.8 12.0 6.7 0.0 0.0 0.0 0.0 0.0 1.5 9.2 13.8 13.8
90.1-10 Min Var Vol HW Pump [F.L.Rate=29.83 kWJ (MiscAccessory Equipment)
Electric(kWh) 1,508.1 1,327.4 790.6 67.0 0.0 0.0 0.0 0.0 0.0 53.0 377.6 1,282.9 5,406.5
Peak(kV� 29.7 29.7 29.7 10.6 0.0 0.0 0.0 0.0 0.0 3.1 17.7 29.7 29.7
Boiler forced draft fan [F.L.Rate=1.48 kWJ (MiscAccessory Equipment)
Electric(kWh) 185.2 160.0 68.2 23.7 0.0 0.0 0.0 0.0 0.0 25.2 62.2 166.0 690.5
Peak(kVV) 1.5 1.5 1.5 1.5 0.0 0.0 0.0 0.0 0.0 1.5 1.5 1.5 1.5
Cntl panel & interlocks - 0.5 KW[F.L.Rate=0.50 kWJ (MiscAccessory Equipment)
Electric(kWh) 62.5 54.0 23.0 8.0 0.0 0.0 0.0 0.0 0.0 8.5 21.0 56.0 233.0
Peak(kV� 0.5 0.5 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.5 0.5 0.5 0.5
Hpl 2: ERV Heating [Sum of dsn coil capacities=582.8 mbh]
Gas-fired heat exchanger- 002 [Nominal Capacity/F.L.Rate=582.8 mbh /7.28 Therms] (Heating Equipment)
Gas(therms) 277.4 292.8 102.4 0.0 0.0 0.0 0.0 0.0 0.0 17.6 31.7 187.2 909.3
Peak(therms/Hr) 3.5 3.9 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.0 2.7 3.9
Sys 1: Water Source Heat Pump
Total-energy wheel (OA precondition) [Stage 1 Energy Recovery]
Energy Recovered(therms) 958.7 957.2 892.0 51.6 23.2 69.7 138.0 69.1 8.5 299.5 571.1 849.9 4,888.5
Peak(therms/Hr) 4.6 5.1 4.3 2.3 0.7 1.1 1.6 1.0 0.4 2.9 3.1 4.4 5.1
Total-energy wheel (OA precondition) [Stage 1 Parasitics]
Electric(kWh) 45.9 41.6 50.3 6.4 17.5 25.5 33.8 31.2 15.9 26.3 45.9 43.8 384.0
Peak(kV� 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
Hydronic in heat pump fan [DsnAirflow/F.L.Rate=98,001 cfm/25.81 kWJ (Main Clg Fan)
Electric(kWh) 18,566.3 16,772.4 18,550.1 17,938.2 18,477.8 17,892.5 18,511.8 18,477.9 17,881.7 18,523.8 17,951.7 18,554.4 218,098.6
Peak(kV� 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8
AF Centrifugal const vol [DsnAirflow/F.L.Rate=22,741 cfm/ 11.93 kWJ (System Exhaust Fan)
Electric(kWh) 2,172.5 2,036.4 2,535.3 2,192.5 1,953.3 1,964.4 1,748.0 1,975.0 1,718.3 2,155.1 2,196.5 2,113.1 24,760.4
Peak(kV� 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1
Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021
Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 3 of 4
EQUIPMENT ENERGY CONSUMPTION
By Engineered Solutions
Alternative: 1
------- Monthly Consumption -------
Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Sys 1: Water Source Heat Pump
AF Centrifugal const vol [DsnAirflow/F.L.Rate=17,600 cfm/22.37 kWJ (Opt. Ventilation Fan)
Electric(kWh) 5,816.5 5,260.4 6,238.3 5,560.8 5,981.9 5,968.3 5,605.6 6,191.4 5,519.4 6,027.4 5,771.7 5,605.6 69,547.2
Peak(kV� 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4
Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021
Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 4 of 4
MONTHLY ENERGY CONSUMPTION
By Engineered Solutions
------- Monthly Energy Consumption -------
Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total
Alternative: 1
Electric
On-PkCons. (kWh) 119,850 108,015 125,083 114,666 138,293 144,965 152,792 152,496 128,099 127,239 117,169 114,491 1,543,159
On-Pk Demand (kV� 436 433 445 445 506 526 571 554 518 474 468 434 571
Gas
On-Pk Cons. (therms) 1,046 965 494 44 0 0 0 0 0 43 247 808 3,647
On-Pk Demand (therms/hr) 17 18 14 7 0 0 0 0 0 2 10 17 18
Water
Cons. (1000ga1) 0 0 0 0 5 47 63 56 18 0 0 0 189
Energy Consumption Environmental ImpactAnalysis
BUlldlllg 52,779 Btu/(ft2-year) CO2 1,159,7001bm/year
SOUfCe 151,695 Btu/(ft2-year) 8O2 3,188gm/year
NOX 1,204gm/year
FloorArea 106,700 ft2
Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021
Dataset Name: 19099 SOB.TRC Alternative-1 Monthly Energy Consumption report Page 1 of 1