Loading...
HomeMy WebLinkAbout20200483 269 Broadway Mixed Use Supplemental Information .. .... s ��. ..�. ., .� _�_ ,,,.� �- - -—- -- —- - �� ��.r�.i�■ v v� ■ v����:.a.���s� �.7 ■oti.�.s�s■ � Presented To: C2 Design Group July 14, 2021 ES #19099 'a0' � 'OQ Engineered Solutions O O 4 O O 646 Plank Road #104 O 0 O O O Clifton Park, New York 12065 Q Q Q Q Q www.engineered-solutions.net O O O Q ,�, 518.280.2410 engineeredsolutions July 14, 2021 TABLE OF CONTENTS 1 Introduction 2 2 Proposed Systems 2 3 Emissions Calculations & Results 3 4 Conclusions & Recommendations 4 5 Appendix 5 Project #19099 Page 1 of 5 engineeredsolutions July 14, 2021 Introduction• In April of 2019, New York City passed an ambitious piece of legislation that is focused on dramatically decreasing carbon emissions from buildings within the city. NYC Local Law 97 of 2019 requires large and medium sized buildings to reduce their emissions by 40% before 2030, and 80% by 2050. Anticipation of this law expanding to the rest of the state and an eye towards environmental friendliness, an analysis has been performed on the proposed Saratoga Office Building that will be located at 269 Broadway, Saratoga Springs NY 12866 to project carbon dioxide emissions. The results are as follows: Proposed Systems• The building, which consists of 106,700 square feet of office and mercantile space, shall be served by the following building systems: • LED lighting will be provided throughout the building. • Building mounted exterior lighting. • A water source heat pump system to provide heating and cooling to the building. • High Efficiency, condensing gas fired hot water heating plant to provide heat to the system. • A new Adiabatic Fluid Cooler for building heat rejection. • (2) energy wheel type heat recovery units with gas fired heating and DX cooling with hot gas reheat to provide neutral, dehumidified ventilation air to the building. • A new direct digital temperature control system. • A dedicated exhaust/ventilation system will be provided for the parking garage. • In floor radiant heat to temper the parking garage. Project #19099 Page 2 of 5 engineeredsolutions July 14, 2021 • (2) Centrifugal exhaust Fans for Toilet Room exhaust. • High Efficiency, Gas fired Condensing Domestic Water Heater system. Emissions Calculations & Results: The building was entered into Trane Trace 700 Load Calculation program, including, but not limited to; location, envelope information, occupant and office equipment data, scheduling, and proposed equipment efficiencies. As the plans currently only reflect a building shell with limited detailing of bathrooms, stairwells, and an elevator, some assumptions were made as follows: • Excluding the mercantile area, the building will contain typical office occupant density as calculated per the 2020 New York State Mechanical Code (NYSMC). • Excluding the mercantile area, the building will contain only typical office equipment, i.e. computer workstations, copiers, kitchenette equipment, etc. • Excluding the mercantile area, the building will operate with typical office occupant schedules, with the building starting to be occupied around 7:00 am, being fully occupied from 8:00 am until 5:00 pm, and then people filtering out after 5:00 until the following day. • There is no potable water consumption beyond the toilet rooms presently shown in the shell drawings. From the entered data, Trace 700 calculated an annual energy consumption for the electrical usage, natural gas for heating, and natural gas for potable water. Utilizing the greenhouse gas coefficients of energy in paragraph 28-320.3.1, an anticipated value for carbon dioxide productions in tons of CO2 from the structure at 269 Broadway, Saratoga Springs NY 12866 was generated. That number was then compared to the building emissions limits based off square footage and an occupancy group of B from paragraphs 28-32.3.1, 28-320.3.2, and 28-320.3.4 to determine compliance. Project #19099 Page 3 of 5 engineeredsolutions July 14, 2021 The calculation outputs are as follows: C�R�C3�1 EMISSI��1S CP�LC�JLATfD�IS Building Sq.ft. ia6,766(excluding parkinggarage} Emission Lirnits 2624-2�29 O.Q6846 tC�72efsf paragraph 28-326.3.1,2 Erni�sions lirnits 2�3D-2�3A D.a0453 tC:�72efsf paragraph 28-32�.3.2,2 Ernissions lirnits 2�35-2456 a.6D14 tC42efsf paragraph 28-32a.3.�,2 Eleetrical gas consumption U.4U4288962 tC42efKWh paragraph 23-32a.3.b.1,� Natural gas consumption 4.4466531P tCt72efkbtu paragraph 28-32a.3.�..b,2 Electrical Usage Gas Usage Allov,rable Trace 7GG Values Emissions 2624 2Q3t} 2G35 kvPu bCa2e Therrn kbtu tCO2e (tC42e} until until until 2D29 263� 2456 Electrical Usage 1,543,iS9.0 445.9 ' ` ' ` Heating Gas Usage ;: - ;`; . 3,647 364,74U �77.2 9f}2.7 �83.4 2�4.� 31.2 aomestic Gas Usage 2,23Q 222,9�rG Conclusions & Recommendations: Based off of the analysis performed, including all available data and assumptions made, the building is projected to be compliant with NYC Local Law 97 of 2019 until the year 2034. When we near 2035, it is recommended that another analysis be performed on the building, as there is likely to have been alterations and changes to the floorplans, tenants, and equipment, as well as actual utility usage information available for analysis. Project #19099 Page 4 of 5 engineeredsolutions July 14, 2021 Appendix• • Monthly Energy Consumption • Equipment Energy Consumption Project #19099 Page 5 of 5 engineeredsolutions EQUIPMENT ENERGY CONSUMPTION By Engineered Solutions Alternative: 1 ------- Monthly Consumption ------- Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total Lights Electric(kWh) 24,245.5 21,922.2 25,669.5 23,233.8 24,957.5 24,657.7 23,533.5 25,669.5 23,233.8 24,957.5 23,945.7 23,533.5 289,559.8 Peak(kV� 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 83.3 Misc. Ld Electric(kWh) 38,629.7 34,941.9 41,762.0 36,878.4 40,195.9 40,010.7 37,063.5 41,762.0 36,878.4 40,195.9 38,444.5 37,063.5 463,826.2 Peak(kV� 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 134.7 Cooling Coil Condensate Recoverable Water(1000ga1) 0.0 0.0 0.0 0.2 0.2 2.3 6.4 4.4 0.7 0.2 0.2 0.1 14.5 Peak(1000ga1/Hr) 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.1 Bsu 1: Domestic Hot Water Load Proc. Hot Water(therms) 185.1 167.4 202.7 176.3 193.9 193.9 176.3 202.7 176.3 193.9 185.1 176.3 2,229.6 Peak(therms/Hr) 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 1.1 Bsu 2: Parking lot lights Electric(kWh) 806.0 728.0 806.0 780.0 806.0 780.0 806.0 806.0 780.0 806.0 780.0 806.0 9,490.0 Peak(kV� 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Bsu 3: Elevator 1 Electric(kWh) 1,338.8 1,211.3 1,466.3 1,275.0 1,402.5 1,402.5 1,275.0 1,466.3 1,275.0 1,402.5 1,338.8 1,275.0 16,128.8 Peak(kV� 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 Bsu 4: Elevator 2 Electric(kWh) 1,338.8 1,211.3 1,466.3 1,275.0 1,402.5 1,402.5 1,275.0 1,466.3 1,275.0 1,402.5 1,338.8 1,275.0 16,128.8 Peak(kV� 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 Bsu 5: Elevator 3 Electric(kWh) 1,338.8 1,211.3 1,466.3 1,275.0 1,402.5 1,402.5 1,275.0 1,466.3 1,275.0 1,402.5 1,338.8 1,275.0 16,128.8 Peak(kV� 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 9.0 Cpl 1: WSHP System [Sum of dsn coil capacities=207.4 tons] Water source heat pump- 001 [Clg Nominal Capacity/F.L.Rate=207.4 tons/ 160.6 kWJ (Cooling Equipment- Cooling Mode) Electric(kWh) 7,476.3 6,694.3 11,469.1 12,783.9 24,625.4 29,400.1 31,473.1 31,041.3 22,459.6 16,760.0 12,138.3 7,137.5 213,458.8 Peak(kVV) 101.0 99.3 107.7 108.6 147.0 154.3 155.3 157.2 150.4 129.5 123.2 99.5 157.2 Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021 Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 1 of 4 EQUIPMENT ENERGY CONSUMPTION By Engineered Solutions Alternative: 1 ------- Monthly Consumption ------- Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total Cpl 1: WSHP System [Sum of dsn coil capacities=207.4 tons] Water source heat pump- 001 [Htg Nominal Capacity/F.L.Rate=2,256 mbh / 137.7 kWJ (Cooling Equipment- Heating Mode) Electric(kWh) 5,516.5 4,809.3 2,827.8 514.2 0.0 0.0 0.0 0.0 0.0 402.6 1,673.3 4,532.6 20,276.2 Peak(kV� 90.5 90.5 90.5 56.9 0.0 0.0 0.0 0.0 0.0 23.3 72.4 90.5 90.5 Default Free Cool Fluid Cooler[Design Heat Rejection/F.L.Rate=253.1 tons/43.96 kWJ Electric(kWh) 1,615.3 1,427.6 2,574.9 2,982.5 5,827.8 7,078.7 8,142.0 7,560.4 5,348.7 3,894.1 2,800.4 1,596.3 50,848.6 Peak(kV� 21.7 21.1 23.5 24.6 30.9 34.4 37.6 35.9 34.2 28.7 26.8 21.6 37.6 Default Free Cool Fluid Cooler Make Up Water(1000ga1) 0.0 0.0 0.0 0.0 5.0 47.1 62.8 55.5 18.5 0.0 0.0 0.0 188.9 Peak(1000ga1/Hr) 0.0 0.0 0.0 0.0 0.3 0.4 0.4 0.4 0.4 0.3 0.0 0.0 0.4 Varvol chill water pump [F.L.Rate=29.83 kWJ (MiscAccessory Equipment) Electric(kWh) 745.7 660.3 1,007.2 1,102.6 2,668.8 3,684.6 4,314.4 4,015.6 2,531.4 1,531.1 1,090.5 708.1 24,060.3 Peak(kVV) 10.6 10.2 12.0 12.2 24.1 27.1 27.5 28.3 25.5 18.0 16.1 10.3 28.3 Constant volume pump [F.L.Rate=19.89 kWJ (MiscAccessory Equipment) Electric(kWh) 8,431.4 7,536.6 6,303.7 6,761.0 7,834.8 7,755.3 8,232.6 7,854.7 7,357.6 7,655.9 5,846.3 7,457.0 89,026.8 Peak(kVV) 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 19.9 Wshpcntl -WS heat pump control [F.L.Rate=0.03 kWJ (MiscAccessory Equipment) Electric(kWh) 10.6 9.5 7.9 8.5 9.9 9.8 10.4 9.9 9.3 9.6 7.4 9.4 111.9 Peak(kV� 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Cpl 2: ERV Cooling [Sum of dsn coil capacities=58.33 tons] Air-cooled unitary- 002 [Clg Nominal Capacity/F.L.Rate=58.33 tons/67.95 kWJ (Cooling Equipment) Electric(kWh) 0.0 0.0 0.0 0.0 641.9 1,354.9 8,487.6 2,398.8 473.9 0.0 0.0 0.0 13,357.1 Peak(kVV) 0.0 0.0 0.0 0.0 9.9 31.6 60.6 39.5 9.3 0.0 0.0 0.0 60.6 Air-cooled cond fans cooling mode [Design Heat Rejection/F.L.Rate=77.65 tons/7.18 kWJ Electric(kWh) 0.0 0.0 0.0 0.0 78.1 161.8 983.0 287.9 58.2 0.0 0.0 0.0 1,569.0 Peak(kVV) 0.0 0.0 0.0 0.0 1.2 3.7 6.8 4.6 1.1 0.0 0.0 0.0 6.8 Cntl panel & interlocks- 0.1 KW[F.L.Rate=0.10 kWJ (MiscAccessory Equipment) Electric(kWh) 0.0 0.0 0.0 0.0 8.8 13.2 22.0 16.1 8.0 0.0 0.0 0.0 68.1 Peak(kVV) 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.1 Hpl 1: WSHP Heating [Sum of dsn coil capacities=1,481 mbh] Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021 Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 2 of 4 EQUIPMENT ENERGY CONSUMPTION By Engineered Solutions Alternative: 1 ------- Monthly Consumption ------- Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total Hpl 1: WSHP Heating [Sum of dsn coil capacities=1,481 mbh] Boiler- 001 [Nominal Capacity/F.L.Rate=1,481 mbh/ 17.43 Therms] (Heating Equipment) Gas(therms) 768.8 672.3 391.9 43.6 0.0 0.0 0.0 0.0 0.0 25.4 214.9 620.9 2,737.9 Peak(therms/Hr) 13.8 13.8 12.0 6.7 0.0 0.0 0.0 0.0 0.0 1.5 9.2 13.8 13.8 90.1-10 Min Var Vol HW Pump [F.L.Rate=29.83 kWJ (MiscAccessory Equipment) Electric(kWh) 1,508.1 1,327.4 790.6 67.0 0.0 0.0 0.0 0.0 0.0 53.0 377.6 1,282.9 5,406.5 Peak(kV� 29.7 29.7 29.7 10.6 0.0 0.0 0.0 0.0 0.0 3.1 17.7 29.7 29.7 Boiler forced draft fan [F.L.Rate=1.48 kWJ (MiscAccessory Equipment) Electric(kWh) 185.2 160.0 68.2 23.7 0.0 0.0 0.0 0.0 0.0 25.2 62.2 166.0 690.5 Peak(kVV) 1.5 1.5 1.5 1.5 0.0 0.0 0.0 0.0 0.0 1.5 1.5 1.5 1.5 Cntl panel & interlocks - 0.5 KW[F.L.Rate=0.50 kWJ (MiscAccessory Equipment) Electric(kWh) 62.5 54.0 23.0 8.0 0.0 0.0 0.0 0.0 0.0 8.5 21.0 56.0 233.0 Peak(kV� 0.5 0.5 0.5 0.5 0.0 0.0 0.0 0.0 0.0 0.5 0.5 0.5 0.5 Hpl 2: ERV Heating [Sum of dsn coil capacities=582.8 mbh] Gas-fired heat exchanger- 002 [Nominal Capacity/F.L.Rate=582.8 mbh /7.28 Therms] (Heating Equipment) Gas(therms) 277.4 292.8 102.4 0.0 0.0 0.0 0.0 0.0 0.0 17.6 31.7 187.2 909.3 Peak(therms/Hr) 3.5 3.9 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 1.0 2.7 3.9 Sys 1: Water Source Heat Pump Total-energy wheel (OA precondition) [Stage 1 Energy Recovery] Energy Recovered(therms) 958.7 957.2 892.0 51.6 23.2 69.7 138.0 69.1 8.5 299.5 571.1 849.9 4,888.5 Peak(therms/Hr) 4.6 5.1 4.3 2.3 0.7 1.1 1.6 1.0 0.4 2.9 3.1 4.4 5.1 Total-energy wheel (OA precondition) [Stage 1 Parasitics] Electric(kWh) 45.9 41.6 50.3 6.4 17.5 25.5 33.8 31.2 15.9 26.3 45.9 43.8 384.0 Peak(kV� 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 Hydronic in heat pump fan [DsnAirflow/F.L.Rate=98,001 cfm/25.81 kWJ (Main Clg Fan) Electric(kWh) 18,566.3 16,772.4 18,550.1 17,938.2 18,477.8 17,892.5 18,511.8 18,477.9 17,881.7 18,523.8 17,951.7 18,554.4 218,098.6 Peak(kV� 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 25.8 AF Centrifugal const vol [DsnAirflow/F.L.Rate=22,741 cfm/ 11.93 kWJ (System Exhaust Fan) Electric(kWh) 2,172.5 2,036.4 2,535.3 2,192.5 1,953.3 1,964.4 1,748.0 1,975.0 1,718.3 2,155.1 2,196.5 2,113.1 24,760.4 Peak(kV� 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 10.1 Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021 Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 3 of 4 EQUIPMENT ENERGY CONSUMPTION By Engineered Solutions Alternative: 1 ------- Monthly Consumption ------- Equipment- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total Sys 1: Water Source Heat Pump AF Centrifugal const vol [DsnAirflow/F.L.Rate=17,600 cfm/22.37 kWJ (Opt. Ventilation Fan) Electric(kWh) 5,816.5 5,260.4 6,238.3 5,560.8 5,981.9 5,968.3 5,605.6 6,191.4 5,519.4 6,027.4 5,771.7 5,605.6 69,547.2 Peak(kV� 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 22.4 Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021 Dataset Name: 19099 SOB.TRC Alternative-1 Equipment Energy Consumption report page 4 of 4 MONTHLY ENERGY CONSUMPTION By Engineered Solutions ------- Monthly Energy Consumption ------- Utility Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total Alternative: 1 Electric On-PkCons. (kWh) 119,850 108,015 125,083 114,666 138,293 144,965 152,792 152,496 128,099 127,239 117,169 114,491 1,543,159 On-Pk Demand (kV� 436 433 445 445 506 526 571 554 518 474 468 434 571 Gas On-Pk Cons. (therms) 1,046 965 494 44 0 0 0 0 0 43 247 808 3,647 On-Pk Demand (therms/hr) 17 18 14 7 0 0 0 0 0 2 10 17 18 Water Cons. (1000ga1) 0 0 0 0 5 47 63 56 18 0 0 0 189 Energy Consumption Environmental ImpactAnalysis BUlldlllg 52,779 Btu/(ft2-year) CO2 1,159,7001bm/year SOUfCe 151,695 Btu/(ft2-year) 8O2 3,188gm/year NOX 1,204gm/year FloorArea 106,700 ft2 Project Name: TRACE�700 v6.3.5 calculated at 11:47 PM on 07/13/2021 Dataset Name: 19099 SOB.TRC Alternative-1 Monthly Energy Consumption report Page 1 of 1