Loading...
HomeMy WebLinkAbout20180830 318 West Ave Dev Correspondance The LA GROUP Landscape Architecture di.Engineering P.C. People.Purpose.Place. 40 Long Alley Saratoga Springs NY 12866 p:518-587-8100 518-587-0180 www.thelagroup.com February 11, 2019 Mr. Tim Wales, PE City Engineer City of Saratoga Springs 474 Broadway Saratoga Springs, New York 12866 RE: City Designated Consulting Services Engineering Review of Site Plan application—2st Submittal 318 West Avenue Mixed Use Building, Saratoga Springs,Saratoga County, NY City Project No. PB#18.055 Dear Mr.Wales: The LA Group is in receipt of comments from Chazen Companies, dated February 2nd, 2019. The following are responses to the comments. Water Sewer Engineering Report Comment 1: The report should include a discussion addressing existing wastewater flow rates and whether rates are anticipated to increase as a result of the proposed project. Please revise the report to discuss this and provide a letter from Saratoga County indicating that they can accommodate the additional flows from the proposed development. The LA Group indicated that a Request for Review Form was submitted to the SCSD and that additional flow rates were approved. Please submit to the City documentation from SCSD indicating such, for the record. Response 1: The SCSD contact the LA Group regarding this request and a verbal agreement to the permit was received. The SCSD did not provide documentation indicating that. Survey Comment 3: Please provide a signed and sealed copy of the boundary, topographic and utility survey, prepared by Thompson Fleming Land Surveyors, P.C. The LA Group indicated that a signed and sealed survey will be submitted with the final plans. Response 3: A signed sealed copy of the survey will be provided with the final plan set. Comment 4: Existing water, sewer, electric and gas(if any)services are not shown. Please indicate. The LA Group indicated that the location of existing underground utilities are not known. It's recommended that the approximate/assumed locations be indicated and a note calling for the removal/abandonment, etc., be added to the plans along with appropriate termination requirements. Response 4: A note has been added to the survey and is present on the Site Prep and Demo plan. Comment 5: The survey identifies an existing 15'wide sewer easement to the Northern neighbor-is there a sewer main located within this easement? The LA Group indicated there is a force main connecting to the existing sanitary main. It appears as if the approximate location of the force main is shown, but it is not labelled as such. Please confirm and label accordingly. We are concerned with potential impacts to this force main. Response 5: The force main location is shown on the survey. Comment 8: Please indicate that date that the field was performed and whether the underground utilities shown (particularly those without surface features)were located or are based on record data. The LA Group indicated that the final survey will be updated to include how the utilities were located. Response 8: The surveyor will include how the utilities were located on the final survey. Site Plans Comment 24: Please indicate the location of the proposed transformer, route of electric services and the meters along with any landscape/screening proposed. The LA Group indicated that the electric and gas meter locations will be shown on the final building plans, however, the location of the proposed transformer and route of electric services was not addressed. The location of the proposed transformer and routes of electric services should be indicated on the Final Site Grading, Drainage, and Utilities Plan, sheet L-3.0, and screened appropriately from neighboring properties. Response 24: The electrical service will be served from a pole mounted transformer off the pole which exists in the ROW. The location of the electrical lines serving the building will be documented on the as-built drawing. SWPPP Comment 27: According to the NYS Stormwater Management Design Manual (SWMDM), Porous Asphalt Pavement shall have a 4"-8"thick choker course of No. 57 stone and an 8"-12"thick filter layer consisting of No. 2 stone. The Porous Asphalt detail provided on sheet L-6.0 only provides 1"for the choker course,which is not consistent with the SWMDM. Please update the detail accordingly. The LA Group indicated that they have had success with the section depicted on their plans on other projects and that other states indicate the choker layer is optional, or only a depth of 1" is required ... and that the proposed design is similar to the Minnesota and FHWA design guidelines. Since this is a deviation from NYS SWMDM requirements, it is recommended that the LA Group submit documentation from NYSDEC indicating this is an acceptable alternate. Otherwise, we cannot recommend approving the design at this time. Response 27: Correspondence regarding this issue was exchanged with Tim Wales and the design has been approved as shown. Comment 29: Please revise the subcatchment symbols on the watershed maps to match the symbols used in the HydroCAD model and label the infiltration trenches, and porous pavement nodes accordingly on the plans. The LA Group indicated that the watershed maps have been revised accordingly, however, a revised SWPPP with the updated maps were not submitted. We recommend that the final SWPPP be submitted to the City for the record. Response 29: The watersheds map will be included in the final SWPPP. Sincerely, �.Y Douglas B. Heller, PE,ASCE Associate Principal/Civil Engineer dheller@thelagroup.com G:AProj-2017\2017114_Smith_Property_Consulting_West_Ave\2017114Admin\OlCorrespondence\2.7Review_Comments\2019 01-17 Wales Comment Response Ltr..docx