HomeMy WebLinkAbout20180786 Macica Subdivision Checklist [FOR OFFICE USE1
CITY OF SARATOGA SPRINGS
6
1)4. (Application#)
PLANNING BOARD
" (Date received)
City Hall-474 Broadway
'.,
Saratoga Springs, New York 12866-2296
Tel:518-587-3550 fax:518-580-9480
htt www.sarato a-s rin s.or
p// g p g g
Rev.03/2018
PRELIMINARY/ FINAL SUBDIVISION APPROVAL
REQUIRED SUBMITTAL CHECKLIST
. Project Name: Proposed Subdivision, Old Schuylerville Road
2. Checklist Prepared By: Ingalls&Associates,LLP Date: 02-06-2019
Listed below are the minimum submittal requirements as set forth in The City of Saratoga Springs' Subdivision
Regulations. The Planning Board reserves the right to request additional information, as necessary, to support
an application. The Board also reserves the right to reject the application if these minimum requirements are
not met. Please complete the checklist below and provide with your submission.
REQUIRED ITEMS: *2 hard copies and 1 digital copy of ALL materials are required.
CHECK EACH ITEM **HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
I. Completed Subdivision Application (2 hard copies -*I w/original signature-and I digital) and Fee
2. SEQR Environmental Assessment Form-short or long form as required by action.
3. Set of plans including: (2) large scale plans (sheets must be 24" x 36", drawn to a scale of not more
than 1"=50 feet). One digital version of all submittal items (pdf) shall be provided.
4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242.
5. Copy of signed DPW water connection agreement for all projects involving new water connections
to the City system
6. Engineering Report for Water and Sanitary
7. Complete Streets Checklist
8. Project Cost Estimate-Quantities of work items and estimate of costs
REQUIRED ITEMS ON SUBDIVISION PLAT,AS APPLICABLE:
I. Name of Subdivision
3. Property line survey prepared by a licensed land surveyor. Subdivision plat must reference such survey
with all corners set and marked on plan. Reference NGVD 1929 datum. A copy of the original
property survey must also be included.
4. North arrow and map scale
City of Saratoga Springs Subdivision Checklist 1
5. Parcel tax map number
6. Site location map
7. Site vicinity map (all features within 300 feet of property)
8. Identification of current zoning with corresponding area requirements
9. Building setback lines, either listed or shown on plans
10. Title block with subdivision name; name and address of applicant; and name and address of property
owner(if different)
I I. Name, address and phone number of subdivision surveyor and/or engineer
12. Names of all adjacent property owners within 300 feet (include both sides of street)
❑ 13. Identification of size, elevations, material, and slopes of all existing and proposed utilities within 400 ft
of site.
14. Parcel street address (existing and any proposed postal addresses)
Yes No N/A 15. Identification of existing or proposed easements, covenants or legal rights-of-way on this property
nn 16. References to all prior variances or special use permits
n17. Existing and proposed contours and spot grades (at 2 foot intervals)
Z n 18. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains,
rock outcroppings, etc.
n n n 19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition
of existing sidewalks)
n n pi 20. Location, design specifications and construction material for all proposed site improvements (drains,
culverts, retaining walls, berms, fences, etc.)
D El 21. Location and distance to fire hydrant
n22. Erosion and sediment control plan—including designated concrete truck washout area
nn 23. Approximate location, dimensions and areas for proposed lots and proposed public recreational land
n 1 24. Proposal for utility systems and lateral connections
n25. Location and width of proposed streets
City of Saratoga Springs Subdivision Checklist 2