Loading...
HomeMy WebLinkAbout20180974 15.040.2 EP Phase 2_Site Plan Amendment ApplicationCITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 1 2866-2296 TEL: 5 18-587-3550 FAX: 518-580-9480 HTTP ://WWW. SARATOGA-SPRINGS . ORG IFOR OFFICE USE] (Application #) (Date received) APPLICATION FOR: SITE PLAN REVIEW APPROVAL (INCLUDING PUD) 1. Project Name: Excelsior Park, Phase 2A 2. Project Data Location: Excelsior Avenue (Rev: I /04/ I I ) Current Zoning: T-5, Neighborhood Center Proposed Use: Residential Townhouse Date zoning variance granted (if any): None Tax Parcel Number: 166.-1-5.12, 166.-1-5.13 3. Professional Representing Applicant: Doug Heller, PE Name: Address: The LA Group, P.C. 40 Long Alley, Saratoga Springs, NY 12866 Phone: (518) 587-8100 Fax: (518) 587-0180 4. Application Fee: Total $ 500 A check for the total amount below payable to: "Commissioner of Finance" MUST accompany this application. n Sketch Plan — $250 n Final Site Plan Approval Residential - $250 plus $150/unit Non -Residential - $500 plus $100/1,000 SQ. FT $ n Extension Residential - $250 Non -Residential - $500 n Modification Residential - $250 Non -Residential - $500 p. 1 of 6 5. Environmental Assessment Form - All applications must include a completed SEQR Short Form. 6. Cost estimates for Letter of Credit - All applications must include cost estimates. 7. Application Check List - All applications must include application check list. 8. Estimate of increase in water consumption: N/A gallons/day. 9. For all projects including new water connections to the City system, a copy of a signed water service connection fee agreement with the City Department of Public Works is required and MUST be submitted with this application. 10. Does any City officer, employee or family member thereof have a financial interest (as defined by General Municipal Law Section 809) in this application? YES NO X . If yes, a statement disclosing the name, residence, nature and extent of this interest must be filed with this application. 11. Submit 12 copies of complete application including checklist, SEQR form, and all plans (must be 24" x 36"). 12. Submission Deadline - All completed applications are due 4 weeks before the Planning Board meeting date. 1, the undersigned owner, leasee or purchaser under contract for the property, hereby request Site Plan approval by the Planning Board the-dentified property above. I agree to meet all requirements under Section 240-5.4 of the ning Code -Of the of Saratoga Springs. Applicant Signature: Name: Excelsior Park, LLC, John Address: Witt Construction, Inc. 563 North Broadway, Saratoga Springs, NY 12866 If applicant is leasee, owner st Iiso sign. Owner Signature: Date: t o (21-1 l 18 Phone: (518) 587-4113 Fax: Date: p. 2 of 6 CITY OF SARATOGA SPRINGS PLANNING BOARD CITY HALL - 474 BROADWAY SARATOGA SPRINGS, NEW YORK 1 2866-2296 TEL: 518-587-3550 FAX: 518-580-9480 HTTP ://WWW. SARATOGA-SPRINGS. ORG SITE PLAN REVIEW REQUIRED SITE PLAN SUBMITTAL CHECK LIST I . Project Name: Excelsior Park, Phase 2A 2. Checklist Prepared By: Excelsior Avenue Date: 10/23/18 Listed below are the minimum submittal requirements as set forth in Chapter 240-5.4 for any site plan application before the Saratoga Springs Planning Board. The Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimal requirements are not met. (for reviewers use) YES NO N/A YOUR SITE PLAN SUBMITTAL SHOULD INCLUDE THE FOLLOWING ITEMS, AS APPLICABLE: 1. Correct plan size and scale. Sheets must be 24" x 36", drawn to a scale of not more than I "=50 feet x 2. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with all corners set and marked on plan. A copy of the original property survey must also be included. x 3. Building setback lines, either listed or shown on plans x �■ 4. Identification of all existing or proposed easements 5. Identification of existing zoning x ❑ 6. References to all prior variances or special use permits x 7. Topography data tied to NGVD 1929 datum x ❑ 8. Parcel tax map number x 9. Name of all adjacent property owners x 10. Parcel street address (postal address) x I I . North arrow and map scale x 12. Title block with project name; name and address of applicant; and name and address of property owner (if different) x ❑ ❑ 13. Site location map x I4. Site vicinity map (all features within 300 feet of property) x p.3of6 p.4of6 ❑ ❑ 15. Existing and proposed contours and spot grades (at 2 foot intervals) x ❑ ❑ ❑■ 16. Identification of all spoil or borrow areas x I ❑ x 17. Identification of all watercourses, designated State wetlands, Federal wetlands, rock outcroppings, etc. ■ 18. Location of proposed storage, if any 19. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition of existing sidewalks) ❑ ❑ 20. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) x ❑ ❑ 21. Location and distance to fire hydrant x ❑ 22. Location, size, and material of all existing and proposed utility services x ❑ ❑ 23. Parking lot layout plan and identification of all loading areas (number all spaces) x ❑ ❑ 24. Parking demand calculations x ❑ ❑ 25. Identification of parking spaces and access points for physically impaired persons x ❑ ❑ ❑■ 26. Location and screening plan for dumpster or recycling bins 27. Location, design, type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site x ❑ ❑■ 28. Identification of storage of any potentially hazardous materials n 29. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. x 30. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures x 31. Drainage plan and stormwater management report x ❑ 0 32. Soil erosion protection measures ❑ ❑ 33. Identification of all federal, state, county, and local permits needed x ❑ ❑ ❑■ 34. Quantities of work items and estimates of costs ❑ ❑ 35. Estimate of increase in water consumption ❑ x 36. Copy of signed water connection agreement with DPW for all projects involving new water connections to the City system 37. OTHER: p.4of6