HomeMy WebLinkAbout20200175 Boger Slate Roof Replacement Supplemental Information (2) PARTIAL LIST OF DRC APPROVALS OF SLATE ROOF REPLACEMENT WITH ASPHALT
-with deciding factors as stated in DRC meeting minutes
1) 54 Ash St. 11/18/20 slate replacement APPROVED by DRC
-COST is determining factor
-repair would be "mammoth job"
2) 209 Nelson Ave 9/20/17 slate replacement APPROVED by DRC
-COST is determining factor
-identical shingles to 41 George St
3) 26 Madison 5/20/2009 slate replacement APPROVED by DRC
-no professional documentation required to show end of roof*
4)173 Caroline St. 5/3/2007 slate replacement APPROVED by DRC
-WEIGHT of slate issue
5)193 Caroline 10/6/05 slate replacement APPROVED by DRC
-COST is determining factor
-color not within DRC jurisdictional stated by DRC
6) 563 N. Broadway 9/8/2005 slate replacement APPROVED by DRC
-DRC discouraged applicant from using Slate
7)43 5t" 11/30/2005 slate replacement APPROVED by DRC
-COST is determining factor
-color not within DRC jurisdictional stated by DRC
8) 191 Caroline 12/9/2004 slate replacement APPROVED by DRC
-AFTER STOP WORK ORDER
-"Unique diamond pattern"of old slate
-approved retroactively
9) 112 Union Avenue 1/8/2004 slate replacement APPROVED by DRC
- no professional documentation required to show end of roof
10)150 Phila St. 4/3/2003 slate replacement APPROVED by DRC
- no professional documentation required to show end of roof
-WEIGHT is issue
-applicant did not want to have to add additional support for roofing materials
11) 120 Grand Ave. 6/20/2002 slate replacement APPROVED by DRC
-no professional documentation required to show end of roof
-if applicant"think it can be repaired, otherwise use asphalt"
12) 125 Regent St. 7/12/01 slate replacement APPROVED by DRC
-COST is determining factor
13) 186 Circular St. 12/6/2000 slate replacement APPROVED by DRC
- no professional documentation required to show end of roof
PARTIAL LIST OF DRC APPROVALS OF SLATE ROOF REPLACEMENT WITH ASPHALT
-with deciding factors as stated in DRC meeting minutes
14) 84 Union Ave 9/21/2000 slate replacement APPROVED by DRC
- no professional documentation required to show end of roof
-in fact applicant failed to appear and DRC approved anyway