HomeMy WebLinkAbout20210243 19 Washington St. Development Site Plan Traffic Study (2) � �Cr�ic�h�can
� .���:����;������
May 17, 2021 �`�_''
Mr. Michael Ingersoll
The LA Group
40 Long Alley
Saratoga Springs, New York 12866
RE: Traffic Assessment, 19 Washington Street Re-Development, Washington Street, City of Saratoga
Springs,Saratoga County, New York; CM Project 121-147
Dear Mr. Ingersoll:
An updated Traffic Assessment has been completed for the proposed 19 Washington Street Re-Development
project located in the northwest quadrant of the Broadway/Washington Street intersection in the City of
Saratoga Springs.The current proposal consists of the construction of 90 new residential apartment units and
31 new hotel rooms. It is noted that the City of Saratoga Springs reviewed and approved a separate proposal
on this site called the Rip Van Dam Hotel Redevelopment Project(RVD Project).This previous proposal included
the construction of a 176-room hotel with a 200-seat banquet hall.The original approval for the RVD Project
was based on the Traffic ImpactStudy prepared by CHA last revised October 2013(included under Attachment
A). This updated evaluation is based on information provided in the "Layout & Materials Plan," prepared by
The LA Group dated March 18, 2021 included under Attachment B. This letter provides a trip generation
estimate and comparison to the previously approved RVD Project and includes an assessment of the proposed
site driveways on Washington Street.
1.0 Project Description and Existing Conditions
r� - �
The project seeks to connect multiple buildings along ` �,�.' �r ;"`�'�+'�'._h'"�. ,� � �
the Broadway frontage and develop or redevelop the .�, �i�:- � = � ;F. _.�� � � �
land behind the main buildings. The Rip Van Dam and �,: .. i � ,_���
Starbucks occupied buildings will be restored to �y 4.1 `"~ _ ' ��
redevelop 15,273 square-feet (SF) into commercial, , ;�1 - _ � - - � �
T�J� . ��',1s "� � `�' __
hotel rooms, and apartments on the first floor and ., - ��_ _ �.:,.� �_� -.__ .�
basement. The new building being constructed with ■ ��' ��' � ' � ��� ��'�� ' �
f'f �•� � � r-�� �- �� ��. . d �
the primary frontage on Washington Street will include � A L�.. ' �� -� �,: �� � �,
residential apartment units and hotel rooms. The new �- ��� � i � �� _ + - ,� Q
building will include garage parking for approximately � _- .__ - � � , : -
101 vehicles within lower level and first floor level � -
_ �' _ ��
decks which will have separate driveways on ----�,. � - i � �� �� -- ,
- . :r _- �__ ��� ,� —�_
Washington Street. It is noted that these two new �� - ° ; -
�� - _ � -- - y �, �- ,
driveways will replace three existing driveways �, �= _ _;_,. �-- i �� :� �� 4 '
currently located on Washington Street which is � — � � ; -
� -
consistent with access management principles. The � � �, - u'-�j �
project location is shown on Figure 1. Figure 1-Project Location � �' k�� � ��;
Washington Street is a two-lane city street classified as an urban minor collector that is approximately 40-feet
wide.On-street parking is provided on the south side of the street(2-hour,9:00 a.m.to 6:00 p.m.). In addition,
on-street parking is provided on the north side of the street on weekends. There is a signed loading zone
located on the north side of the street adjacent to the Starbucks. Washington Street travels in an east-west
direction within the City of Saratoga Springs from Rowland Street to Broadway.The posted city speed limit is
30-mph. Land uses along the roadway generally consist of commercial and residential uses. Universal
Cr�i�htr�n Ma���r�in� E�-�c�ir7eertn�, LLF � 2 Winn�rs C:irc{e� A{b�ny, NY 122U5 J 5]�i.446.t]:�y6 � www.cr�-��kl�.c�r�r�
Mr.Michael ingersoll
Ma y 17,2021
Page 2 of 6
Preservation Hall is located next to the proposed development to the west while the Bethesda Episcopal Church
is located on the opposite side of the street.
2.0 Traffic Assessment
Trip generation determines the quantity of traffic expected to travel to/from a given site. The Institute of
Transportation Engineers(ITE) Trip Generation is the industry standard used for estimating trip generation for
proposed land uses based on data collected at similar uses.As stated above, a trip generation comparison has
been conducted for the proposed mixed-use development. It is noted that the trip generation summary
provided by CHA for the RVD Project used Trip Generation, 9`h edition which was the most current version of
the resource at the time of the submission.The RVD Project trip generation was estimated using land use code
(LUC) 310 for a Hotel and assumed 72% occupancy, a 10% credit for self-parking/transit use, and increased
traffic associated with the valet operations. It is noted that the RVD Project development plan evaluated the
weekday PM peak hour and the midday Saturday peak hour.The AM peak hour trip generation for the previous
site has been developed based on the original methodology for comparison purposes since the new
development plan will typically generate more traffic during the AM and PM peak hours of commuter traffic
due to the amount of residential units to be constructed.
The trip generation estimate for the 19 Washington Street Re-Development Project is based on Trip Generation,
10`h edition and was estimated using LUC 221 for Mid-Rise Multi-Family Housing and LUC 310 for a Hotel. It is
noted that the proposed project is located within the City of Saratoga Springs which would be considered a
"dense multi-use urban" setting; however,due to limited data points provided by ITE associated with this type
of setting for these land use codes, the trip generation estimate is based on a "general urban/suburban"
setting.This indicates that the trip generation estimate is likely conservative since developments located within
more urban settings generate less traffic when compared to typical suburban sites. Table 1 summarizes the
trip generation estimate of the previously approved RVD Project development plan and the current project
proposal for the weekday AM and PM peak hours which coincide with peak conditions of the adjacent street
network.
Table 1—Trip Generation Summary
Land Use Size LUC AM Peak Hour PM Peak Hour
Enter Exit Total Enter Exit Total
RVD Project Hotel(127 Occupied Rooms) 176 units 310 77 77 154 80 80 160
19 Washington St. Apartments 90 Units 221 8 23 31 24 16 40
Re-Development Hotel 31 Rooms 310 6 4 10 9 10 19
Project Total Updated Proposal 14 27 41 33 26 59
Difference in New Trips �� -63 -50 -113 -47 -54 -101
The proposed project is expected to generate 41 new vehicle trips during the AM peak hour and 59 new vehicle
trips during the PM peak hour.This indicates that the revised site will generate approximately 113 fewer trips
during the AM peak hour and 101 fewer trips during the PM peak hour when compared to the RVD Project
development plan.
The magnitude of the new vehicle trips generated by the site is less than the New York State Department of
Transportation (NYSDOT) and ITE threshold of 100 site generated vehicles on any one intersection approach
for needing off-site intersection analysis.This guidance was developed as a tool to identify locations where the
magnitude of traffic generated has the potential to impact operations at off site intersections and screen out
locations from requiring detailed analysis that do not reach the 100-vehicle threshold and are unlikely to
require mitigation. The anticipated traffic volumes for the 19 Washington Street Re-Development Project will
� �Cn�r�ighton
� lY4°:all�I:��iI�Y�I
Mr.Michael ingersoll
May 17,2021
Page 3 of 6
be below the 100-vehicle threshold indicating that detailed intersection analysis is not needed and that the
site generated traffic will be accommodated by the existing roadway network.
A review of intersection operations and vehicle queuing provided in the Traffic ImpactStudy conducted for the
RVD Project indicates that site specific improvements were not necessary for that approved project. This
suggests that off-site intersection improvements would not be required for the updated project plan since it
will generate significantly fewer peak hour trips.
3.0 Site Access Assessment
Access to the at-grade parking lot (with 51 parking spaces) will be provided via one driveway (East Parking Lot
Driveway) located on Washington Street approximately 190-feet west of the stop-bar associated with the
signalized Broadway intersection. Residents and patrons will be able turn left and right into the parking lot;
however, left-turn movements exiting the lot will be restricted as shown on Figure 2. A similar driveway (West
Parking Lot Driveway)to the underground parking lot (with 50 parking spaces)will be provided immediately west
of the at-grade parking lot driveway.The site plan shows an approximate 55-foot long loading zone in front of the
proposed building located just east of the parking lot driveways. It is noted that vehicles and delivery trucks within
the loading zone may temporarily limit sight lines looking left for motorists trying to turn right from either of the
parking lot driveways; however, this condition is similar to other driveways located in urban settings. It is noted
that this condition is similar to an existing driveway associated with this parcel and the adjacent loading zone
located in front of Starbucks.
Figure 2—Parleing Lot i ' ?
lo �, o�o z4 0 26 0��zs o
Drivevuay Layout o � I
�
&I O 8 GVESTpiOPUFF �II �- -
� � I'
O q I 'I � � ¢
�
41 O St O�OI O O �B 99 4� 41 92 43 � E%ISTING
� I BIIIL�ING -
I . O - � (RIPVPN�MAI —. �
� I __........ ...
❑ �� B iVP. I Q
q p
I �
I 1� l� �a.i a�iKHcia� I ' ' o
._�
� EYISTING -- I � �
1I BVIL�ING - �
I `�OfFICE6�lON "�.•_� +� 1�1 9i � Ifi- 9] �Jb�:Q 50 51 RooM --���
I �� TRASH6 �__
�REG CLING �
!
� �I
� BIIIL�ING ".���
� „
� - ' �� �STtR6ViIf5� ��
I�` .�� �� . . n /� il L�.. i� - -i L7��}� C
I �—� _1 r% Q �"l If �—�r — `� LI�LLCJ_' m '�RdPE E__—. � � �fiF/�
r -� _ —
�. ��- ---+- -=—+ ' �- -�= - - �-
, - . , �,/
� —
� _ � ...= � �1 _ � _ _ � � �. � i � ��il�
�; � -_ � - -
Proposed Loading Zone " Existing Loading Zone
WA5HINGTON STREET .
Sight Line and Loading Zone Review
It is noted that sight lines for motorist entering and exiting the parking lot driveways should be maintained to the
extent possible. A review of the Manual on Uniform Traffic Control Devices—2009(MUTCD) indicates that there
should be a minimum 20-foot"No Parking Zone" provided between an intersection and on-street parking in order
to provide adequate sight lines which is based on the Uniform Vehicle Code (UVC). A review of the site driveway
indicates that there is an approximate 13-foot "No Parking Zone" from the end of the East Parking Lot Driveway.
It is recommended that this be increased to 20-feet as per the MUTCD.
Figure 3 shows the unobstructed sight line from the East Parking Lot Driveway if the"No Parking Zone"is extended.
It is noted that sight lines that pass through the adjacent loading zone could be temporarily impacted by a vehicle
� �Cn�r�ighton
� lY4°:all�I:��iI�Y�I
Mr.Michael ingersoll
May 17,2021
Page 4 of 6
or delivery truck if it was stopped in that area. It is noted that these conditions are consistent with other urban
areas and it is anticipated that motorist will edge forward to see around any sight line obstructions.
� i ___
Fogure 3—Lo�ding Zone g,.� i ¢
Modific�tiorus 4 _ �
�$.� r.ccessie� '�--�-� ¢
� PPAKING I �
� � m
—�_}I l+ 1�y 4-0 O AB- 47 4E �:: d9 50 59 TMSH 8 $�I' ��_��
II t�]�Ir____
I �1 � �ROOMUNG � �I
- I �� EXISnNG
C� �i 1 � 4 . � ��,_ -.�� � � , � 0 _ EST����� I�,-- ,�
� 1 n �'�,_�
!� _ � - ����_��
--
� � , � , I� � � r � �_ �--
,
- u - - -- -� - -;-
w ��--+ � �
� � � — -�
�_1_ �; �, , , � I �, � �
' - --._ � � ���_.,���_�`
— ---- -- —- -- ,
-- _ � '�-- .
Resident Hotel Patron Expanded Commercial
Si�ht Li�e
waSHiN�TOrv SrREET Loading Zone Loading Zone
A review of the sight plan indicates that the main entrance to the 19 Washington Street Re-Development Project
is located in front of the proposed loading zone; however, a secondary access into the new building is proposed
further to the east.This secondary access is designated as a service area access for loading and trash removal. It
is recommended that a smaller loading area for apartment residents and hotel patrons be provided immediately
adjacent to the main building entrance and be limited to 15-minute parking similar to what is provided in front of
The Saratoga Hilton. A larger commercial loading area should begin east of the passenger car loading area that
would extend into the existing loading zone currently provided in front of Starbucks. This new expanded
commercial loading area could be used by delivery vehicles and garbage trucks associated with the proposed re-
development project and Starbucks. It is noted that this commercial loading zone will have adequate access to the
secondary service access and would not block sight lines associated with the parking lot driveways for an extended
period of time since it is located further to the east.
Parking Lot Drivewav Recommendations
The proposed parking lot driveways are side-by-side which is h �� y � � � �
necessary to provide separate access to both parking lots. It is �i �r, � ; �,-`�`'�'::
noted that vehicle paths exiting the parking lots will not overlap '„, � "� �
since left-turns are restricted. It is also noted that vehicles will �� ' '�' `�
have limited sight distance to pedestrians as they approach the �""�"� �� -�
sidewalk when exiting the parking lots due to the structure of the
buildings;however,this condition is similar to the existing parking
garage access provided at 70 Railroad Avenue as shown on
Picture 1. It is recommended that the following conditions be .-�'`�
implemented in order to minimize driver and pedestrian conflicts
at the parking lot driveway intersections on Washington Street: P��ture 1—�o Ra�iroadaver,Ue Park��,�a��e55
• Provide ground mounted "Stop" signs (MUTCD Sign R1-1)on the southbound approaches of both parking
lot driveways.
, _ _ __
• Install "No Left-Turn"signs in conjunction with both "Stop" signs(MUTCD Sign R3-2).
• Install a ground mounted"No-Left-Turn"sign(MUTCD Sign R3-2)on the opposite side � �
of Washington Street to reinforce this turn restriction. �
• Ensure that the parking ramp to sidewalk transition does not exceed six percent. �' R,, ' �3�
� �Cn�r�ighton
� lY4°:all�I:��iI�Y�I
Mr.Michael ingersoll
May 17,2021
Page 5 of 6
• Provide "In-Street Pedestrian Crossing "signs (MUTCD R1-6) to alert motorists as they enter and srnre '
exit the parking lots of possible pedestrian conflicts similar to those provided at the Woodland �Aw
Avenue Parking Garage (See Picture 2)
• Provide curb ramps from the sidewalks prior to the driveways so that pedestrians are aware that ,o
they are crossing a driveway. A sidewalk treatment should be extended across the driveways to at
provide a visual cue to drivers as they exit the parking lots.A similar treatment is provided at the ��
Price Chopper parking garage on Railroad Avenue(See Picture 3). eRos w'A�K,
-- , J _ -_ ,----
,�_._.
, __ �.,�
� ��ic�r � - `I
�'
- k-a
+ , 1 � � �'� �
.��} - — �� 1Sy �
� � � �
• a�
c. i:� 1 i
_ L c'�� f.� S H ��
Picture 2—Pedestrian Sign at Woodlawn Avenue Parking Gara�e Picture 3—Price Chopper Parkin�Garage P�d�strian Tr�atment
4.0 Conclusions
The project seeks to connect multiple buildings along the Broadway frontage and develop or redevelop the
land behind the main buildings.The new building being constructed with the primary frontage on Washington
Street will include 90 new residential apartment units and 31 new hotel rooms. The new building will include
garage parking for approximately 101 vehicles within lower level and first floor level decks which will have
separate driveways on Washington Street. It is noted that these two new driveways will replace three existing
driveways currently located on Washington Street which is consistent with access management principles.The
following is noted regarding the proposed project:
• The proposed development is expected to generate a total of 41 new vehicle trips during the AM peak
hour and 59 new vehicle trips during the PM peak hour. This indicates that the site will generate
approximately 113 fewer trips during the AM peak hour and 101 fewer trips during the PM peak hour when
compared to the RVD Project development plan. This magnitude of traffic does not warrant detailed
evaluation of off-site intersections based on NYSDOT and ITE guidelines and the site will be adequately
served by the existing roadway network.
• A review of intersection operations and vehicle queuing conducted for the RVD Project indicates that site
specific improvements were not necessary for that approved project. This suggests that off-site
intersection improvements would not be required for the updated project plan since it will generate
significantly fewer peak hour trips.
• Loading Zone Recommendations:
o It is recommended that the hatched area that restricts parking adjacent to the East Parking Lot
Driveway be increased to 20-feet as per the MUTCD to maintain clear lines of sight looking left.
o A smaller loading area for apartment residents and hotel patrons should be provided immediately
adjacent to the main building entrance and be limited to 15-minute parking.
o A larger commercial loading area should begin east of the passenger car loading area that would
extend into the existing loading zone currently provided in front of Starbucks. This new expanded
commercial loading area could be used by delivery vehicles and garbage trucks associated with
the proposed re-development project and Starbucks.
• Parking Lot Driveway Recommendations:
o Provide ground mounted"Stop"signs on the southbound approaches of both parking lot driveway
o Install "No Left-Turn" signs in conjunction with both "Stop" signs.
o Install a ground mounted "No-Left-Turn" sign on the opposite side of Washington Street.
� �Cn�r�ighton
� lY4°:all�I:��iI�Y�I
Mr.Michael ingersoll
May 17,2021
Page 6 of 6
o Ensure that the parking ramp to sidewalk transition does not exceed six percent.
o Provide "In-Street Pedestrian Crossing" signs (MUTCD R1-6) to alert motorists as they enter and
exit the parking lots of possible pedestrian conflicts.
o Provide curb ramps from the sidewalks prior to the driveways so that pedestrians are aware that
they are crossing a driveway. A sidewalk treatment should be extended across the driveways to
provide a visual cue to drivers as they exit the parking lots.
Please feel free to call our office if you have any questions or comments regarding the above evaluation.
Respectfully submitted,
Creighton Manning Engineering,LLP
�``�=``�� l/��=..
f
Mark Nadolny
Assoeiate �
Attachments
N:\Projects\2021\121-147 LA Group-19 Washington St Saratoga\Working\Traffic\Reports\121147_Traffic Assessment_20210517.docx
� �Cn�r�ighton
� lY4°:all�I:��iI�Y�I
Attachment A
RVD Project Traffic Impact Study
19 Washington Street Re-Development
City of Saratoga Springs, New York
Rip Van Dam Hotel
Redevelopment Proj ect
Saratoga Springs, NY
TRAFFIC IMPACT STUDY
July 2013
Revised October 2013
Prepared for:
Presidian Saratoga Hospitality Group, LLC
353 Broadway
Saratoga Springs, NY 12866
Prepared by:
3 Winners Circle
Albany, NY 12205
CHA File: 25173
TABLE OF CONTENTS
I. INTRODUCTION...........................................................................................................................1
II. EXISTING CONDITIONS................................................................................................................1
A. STREET NETWORK ................................................................................................................1
B. TRANSITAND PEDESTRIAN FACILITIES...................................................................................1
C. TRAFFIC VOLUMES................................................................................................................2
D. VEHICLE QUEUES..................................................................................................................3
E. PARKING...............................................................................................................................3
1. On-Street Parking...........................................................................................................3
2. Off-Street Parking...........................................................................................................3
III. NO-BUILD TRAFFIC VOLUMES .....................................................................................................4
IV. PROPOSED CONDITIONS .............................................................................................................5
A. PARKING...............................................................................................................................5
1. Hotel & Events ...............................................................................................................5
2. Employees......................................................................................................................6
B. TRIP GENERATION ................................................................................................................7
1. Hotel..............................................................................................................................7
2. Banquet Facility..............................................................................................................8
C. VALETOPERATIONS..............................................................................................................9
D. SITE TRIP DISTRIBUTION .......................................................................................................9
E. FUTURE BUILD VOLUMES....................................................................................................11
F. TRUCK ACCOMODATIONS...................................................................................................11
G. EMPLOYEES........................................................................................................................12
H. PEDESTRIAN ACCOMMODATIONS.......................................................................................13
V. CAPACITY ANALYSIS..................................................................................................................14
A. VEHICLE QUEUES................................................................................................................15
VI. CONCLUSION.............................................................................................................................17
LIST OF APPENDICES
Appendix A: Figures
Appendix B: Site Layout Plan
Appendix C: Traffic Counts
Appendix D: Level of Service Criteria
Appendix E: Capacity Analysis Worksheets
Appendix F: Supporting Documentation
C, �/T Rip Van Dam Redevelopment Project—Traffic Impact Study Page i
LIST OF TABLES
1 Peak Hour Queue Observations .....................................................................................................3
2 Average Parking Demand Estimates...............................................................................................6
3 Peak Hour Trip Generation.............................................................................................................8
4 Hotel Staffing Schedule................................................................................................................ 13
5 LOS Summary: Weekday PM Peak Hour ...................................................................................... 15
6 LOS Summary: Saturday Midday Peak Hour ................................................................................. 15
7 Queue Length Summary—Weekday PM Peak Hour......................................................................16
LIST OF EXHIBITS
1 2013 Existing Traffic Volumes.........................................................................................................2
2 2015 No-Build Traffic Volumes.......................................................................................................4
3 Hotel Guest Trips.........................................................................................................................10
4 ValetTrips....................................................................................................................................10
5 2015 Build Traffic Volumes...........................................................................................................11
C, �/T Rip Van Dam Redevelopment Project—Traffic Impact Study Page ii
I. INTRODUCTION
The proposed renovation and expansion at the Rip Van Dam Hotel will provide 176 new guest rooms
along with a banquet facility that will accommodate up to 200 guests. The existing Maestro's restaurant
will continue to operate at its current capacity. The hotel will operate a valet service from a porte
cochere (structure over the driveway to shelter the loading/unloading of vehicles)on Washington Street
where guests will drop off and unload their vehicles.
The purpose of this study is to evaluate the traffic operations and vehicles queues at the project site,
delivery truck access, parking demand and valet operations. This study is a revision to the original that
was submitted in July 2013. This revision addresses comments from the City and Creighton Manning
Engineering(CME),the consultant reviewing the traffic study for the City.
II. EXISTING CONDITIONS
A. STREET NETWORK
The site is located at 353 Broadway in Saratoga Springs, NY. Access to the site will be provided via a
one-way horseshoe driveway on Washington Street. There is also a service driveway on Washington
Street to al low for deliveries.
Washington Street is approximately 40 feet wide,with on-street parking (two-hour, 9am to 6pm) on the
south side of the street and weekend parking on the north side of the street, a signed loading zone on
the north side of the street adjacent to Starbucks and one 12 foot travel lane in each direction.
Washington Street intersects Broadway at a signal controlled T-intersection. The same signal controller
also controls the intersection with Broadway&Spring Street. Pedestrian "walk" indications operate
concurrently with adjacent moving vehicular traffic. The Washington Street approach to the signal has a
no turn on red restriction.
West of the site, Washington Street intersects Federal Street and Railroad Place at an offset signalized
intersection. The signal operates with split phases for the Federal and Railroad approaches and
pedestrian "walk" indications operate concurrently with adjacent moving vehicular traffic when
activated.
�. TRANSI'T AND PEDESTRIAN FACILITIES
CDTA bus service is available in the City via the Route 50 trunk route and two neighborhood routes. In
the vicinity of the project, there are bus stops along Broadway and along Church Street. The nearest
stops to the site are on Broadway adjacent to Congress Park.
There are pedestrian facilities all through the Downtown area, making it very pedestrian friendly. There
are sidewalks on both sides of the streets and crosswalks and pedestrian signals at every signalized
intersection. From the Broadway&Congress Park bus stop, sidewalks along Broadway and signalized
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 1
crosswalks at the intersection of Broadway&Washington Street provide pedestrian access between the
bus stop and the Rip Van Dam.
C. 1'RAFFIC VOLUMES
Traffic counts were conducted at the intersection of Broadway & Washington Street to identify the
volumes and turning movement patterns for the following periods:
• Weekday PM (4 pm to 6 pm)
• Saturday Midday(11 am to 1 pm)
This data was collected on Thursday June 20, 2013 and Saturday June 22, 2013, with the data recorded
in 15-minute increments to identify the volume and vehicle classification of each movement. This traffic
count data is included in Appendix C. The peak hours were identified from the data collected as 4:30 to
5:30 pm on the weekday and 12:00 to 1:00 pm on Saturday.
To address comments received from CME, the intersection of Washington Street & Federal
Street/Railroad Place was also counted during a Weekday PM peak hour to include an evaluation in the
study. This count was conducted on Wednesday September 25, 2013 from 4:15 pm to 5:45 pm. Like the
intersection of Broadway & Washington Street, the Weekday PM peak hour was identified as 4:30 to
5:30 pm.
The 2013 Existing Traffic Volumes for the studied peak hours at the studied intersections are shown on
Exhibit 1. Note that only Weekday PM peak hour traffic volumes are presented for Washington Street &
Federal Street/Railroad Place.
a,
u
�o
ti
4
b �
0 0 �
�
�
.� ti n
� ,�-i nNi � n �
I
35
130
26 � 5
152 �" 165(132) -
19 105(77) _
_ r �
w Washington Street
N O �A
y r.i m ti .�
ti
� �
�
�
�
y LEGEND � ry O
� XXX(XXX)=PM (SAT) � '-�^ �
Exhibit 1: 2013 Existing Traffic Volumes
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 2
D. VEHICLE QUEUES
During the peak hour traffic counts, queue observations were also conducted for the eastbound
approach of Washington Street at Broadway. The observations noted the number of vehicles in the
queue at the start of green for the approach and also at the end of yellow. The raw queue observation
data is provided in Appendix C.
Since Washington Street is designated as no turn on red at the signal,these observations capture the
maximum queue on the approach and also the remaining queue when the signal phase is terminated.
Table 1 notes the average and maximum queues observed.
Table 1: Peak Hour Queue Observations
Weekday PM Saturday Midday
Start of End of Start of End of
Green Yellow Green Yellow
Ave rage 5 1 4 1
Maximum 12 9 10 7
Queue provided in numberof vehicles.
The back of the average queues end in the vicinity of the existing easternmost driveway to the Rip Van
Dam parking lot. Most often,the entire queue did clear during the signal phase. The end-of-yellow
queue typically was a result of additional vehicles arriving during the yellow time. Occurrences that
caused an impediment of vehicles progressing through the signal during the green indication were
drivers yielding to pedestrians in the crosswalk and an occasional parking maneuver. The maximum
end-of-yellow queue of seven vehicles during the Saturday midday period occurred due to a driver
yielding to pedestrians crossing against the "hand" signal (i.e.they were crossing Washington).
E. P.�TtI{ING
1. On-Street Parking
In the vicinity of the site, there is existing on-street parking (two-hour, 9am to 6pm)on the south side of
Washington Street and weekend parking on the north side of the street. There is a signed loading zone
on the north side of Washington Street adjacent to Starbucks. Parking maneuvers sometime impede
traffic approaching the signal at Broadway and unloading trucks at Starbucks encroach into the
westbound travel lane (see Section IV.F. for additional discussion on truck accommodations).
2. C�ff-Street P�t�kin�
The development of the hotel will occur on the existing 44-space parking. The main use for this lot was
to provide parking for the tenants and guests of tenants in the Rip Van Dam office building. The primary
use of this existing lot is by tenants of 351-353 Broadway, which will cease to exist at this location as
those tenants' leases expire and the businesses move to other buildings in the city. Maestro's
management currently utilizes four parking spaces in this lot.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 3
Some patrons of Maestro's do use the lot during evening hours but, for the most part, the patrons of
this restaurant walk there after parking on-street or in public lots/garages as do the patrons of other
restaurants and retail stores.
III. NO-BUILD TRAFFIC VOLUMES
The anticipated year of completion of the Rip Van Dam Hotel redevelopment is 2015. In order to assess
the project's traffic impacts, the traffic volumes at the study intersection were adjusted to represent
traffic conditions in this design year without the project(No-Build Condition).
Historic traffic volumes on Washington Street (NY 29) and Broadway (US 9) were reviewed to determine
growth trends during the past 10 years. Traffic volumes on Broadway in the vicinity of Washington
Street have decreased by 2-4% per year and Washington Street has increased by 1.5% per year. A
conservative 1.0% per year background growth rate was applied to both intersections to establish the
background 2015 No-Build Traffic Volumes. In addition to the background growth rate, as requested by
the City and CME, trip generation for relevant to other approved projects in the vicinity of the Rip Van
Dam were also distributed to the study area intersections. Trips related to the Congress Plaza
redevelopment (145 room hotel on Congress Street) and the Bow Tie Cinema on Railroad Place (35,650
SF cinema and 30,400 SF office) were also added to the background traffic volumes to establish the 2015
No-Build volumes. They are shown on Exhibit 2 for the Weekday PM and Saturday midday peak hours.
m
�
ar
�
a
b N
� N �
0 �
L 7 rl 7.15 � �'�1 �
d� ,� r� � r� d�
I '
3�
,,, r,� 133
31 - � 5
165 — 158(135) -•
19 107(79}
�_ .
Washington 5treet
� N N l.'� . I , 1
� N � �"� �1
ti
�
14 � � �
d LEGEND � � B
� x?C?((?(}CX]=PM (SATJ � � �
Exhibit 2: 2015 No-Build Traffic Volumes
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 4
IV. PROPOSED CONDITIONS
A. PARKING
l. Hotel�Events
On-site parking was not considered for the redevelopment; height restrictions in the City and soil
conditions would make building parking levels above or below ground unfeasible. Parking supply for the
hotel (no self-parking, valet only)will be provided in a proposed parking garage on Hamilton Street,to
be constructed on the site of an existing parking lot(currently 72 spaces). The garage will house 274
parking spaces. The existing lot on Hamilton Street is used by Palio Communications, who utilizes
approximately 25 spaces on average, and a maximum of 40 spaces. They will be provided 40 spaces in
the new parking structure during their business hours (Monday through Friday, 9am to 5pm). Those 40
spaces can be utilized by the hotel in the evening and on weekends. The parking utilization observations
and documentation from Palio Communications is provided in Appendix F.
The average parking supply necessary to support the hotel and banquet facility was estimated based on
occupancy rates and valet usage estimated based on STR reports for similar types of hotels and those in
Saratoga Springs. STR reports are an industry reporting standard for hotel performance data. It is
estimated that the average hotel occupancy rate will be 57% in year one, 65% in year two and normalize
at 72% in year three. The STR report is included in Appendix F.
For"non-resident" banquet events (i.e. primarily not hotel guests),the owners' experience is that one
valet ticket is generated for every 2.3 banquet attendees. Only 20%of events are anticipated to be non-
resident based (15-20 times per year), so events are not a component of the parking demand 95%of the
year.
The average parking demand estimates also considered public parking and transit use. It can be
assumed that a small proportion of hotel guests will not use the valet service and will park their vehicles
themselves in public parking, and some may arrive via taxi or public transportation. A 10% reduction in
parking demand was applied to account for these situations,which are typical in urban settings. It is
likely that a higher proportion of banquet guests will not use the valet service because they live locally
or are staying at another hotel. They would also be willing to walk longer distances to/from parking
since they would not be traveling with luggage like the hotel guests. The use of the valet service will
also be driven by cost since it will be provided for a fee, and it is anticipated that a higher proportion of
banquet guests will seek free public parking before utilizing the valet. For all of these reasons, a 25%
discount was applied to the average parking demand for banquet guests. Average parking demand
estimates are presented in Table 2.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 5
Table 2: Average Parking Demand Estimates
Evening Evening
Daytime (no event) (with event)
Total Supply 274 274 274
Hotel Guests(176 rooms * 0.72 avg occ. * 0.90 -114 -114 -114
valet use)
Non-resident event((200 max/2.3 passengers n/a n/a -65
per vehicle) * 0.75 valet use)
Palio Communications -25 n/a n/a
Parking supply surplus +135 +160 +95
Since it is not anticipated that the banquet facility will host daytime business conferences,the parking
demand for events was not combined with the daytime demand. But if the parking demand for an
evening event did overlap with the average daytime uses,there would still be a surplus of 70 spaces.
As shown,the average parking demand conditions leave reserve parking supply available for other uses
and/or for times when the hotel is experiencing a higher occupancy rate and/or when the public
parking and transit use is less than estimated. So even during the summer months when the hotel may
be at full capacity(176 rooms), there is still sufficient parking supply to support the hotel and a
maximum capacity event(176+ (200/2.3) = 263). To the same extent that some of Maestro's customers
currently use the existing lot in the evening hours,they may also utilize the garage valet service when
garage supply is available.
On Sundays when local churches on Washington Street have services, it is not a peak arrival time for the
hotel and banquet facility. There is not anticipated to be additional demand on public parking on
Sundays to compete with church activities since hotel guests are accommodated in the garage.
However,the hotel will work the City to sign the on-street parking on the north side of Washington
Street as Church Parking Only,to deter hotel guests from parking there.
2. Emplayees
As mentioned previously,the existing 44-space parking lot behind the Rip Van Dam will be removed as
part of the site demolition. The primary use of this existing lot is by tenants of 351-353 Broadway, which
will cease to exist at this location as those tenants' leases expire and the businesses move to other
buildings in the city. Maestro's restaurant will continue to operate in its existing capacity;therefore
their patron and employee parking demand will not change. Currently, many of their employees walk or
utilize transit. Those that drive personal vehicles park on-street or in public lots/garages. Restaurant
management currently utilizes four spaces in the existing lot behind the Rip Van Dam that will be
eliminated as part of the project.
There will be no designated employee parking for the hotel; employees will utilize public parking,walk
or use transit. When there is excess parking supply available in the garage,which is expected to be most
of the time, restaurant management will likely utilize four spaces in the Hamilton Street garage. Other
employees of the hotel may also have the opportunity to self-park utilizing the excess supply in the
garage.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 6
It is anticipated that many of the hotel employees will walk, carpool or use transit. In fact, hotel
employees are more likely to take transit or carpool than employees of most other land uses.1 The peak
hotel staff shift is during the daytime with approximately 30 employees(a staffing schedule is provided
in Section IV.G). It is noted that the peak staff levels of the hotel and Maestro's do not occur at the
same time, so they will not be competing with each other for public parking supply.
It is anticipated that employees utilizing public parking could use the new garage on Woodlawn Avenue,
the upper parking deck on Phila Street between Broadway and Putnam Street, the Putnam Street lot, or
Woodlawn Avenue garage north of Church Street. The utilization of these parking areas was observed
on a weekday afternoon to identify the availability of parking. The new garage on Woodlawn had
approximately 80 spaces unoccupied and the Woodlawn garage north of Church Street had
approximately 25 spaces unoccupied. The Phila and Putnam parking areas were mostly utilized
(approximately five unoccupied spaces). Since the new public parking demand related to hotel
employees is anticipated to be less than 30 spaces,there is evidence that there is available parking
supply Downtown to support the employee demand.
With the excess supply in the proposed parking garage and the availability of public parking,the offset
of the parking loss at the existing lot behind the Rip Van Dam and the additional employee parking
needs can be accommodated.
B. TRIP GENERATI�D�I
1. Hotel
An estimation of trip generation for the proposed hotel was conducted using the data published in Trip
Generation, 9r"Edition by the Institute of Transportation Engineers (ITE). The Hotel land use code in the
manual includes facilities that also have supporting accommodations such as restaurants, lounges,
meeting/banquet/convention facilities and/or other retail. The trip generation estimate was made for
the Weekday PM peak hour of adjacent street traffic and the Saturday peak hour of the generator based
on the average number of occupied rooms (127 rooms based on an average 72%occupancy).
Information from the project owner indicates that the typical peak of arriving guests is 1 to 2 pm and the
peak of departing guests is 10 to 11 am, as these are related to the periods of guest check-in and check-
out. Table 3 summarizes the estimated trip generation for the Weekday PM and Saturday peak hours.
No trip generation credit was taken for the existing building uses that are eliminated as part of the
renovations.
It can be assumed that a portion of guests will not use the valet service and will park their vehicles
themselves in public parking, and some may arrive via taxi or public transportation. Like the parking
demand estimates, a 10% reduction in site trips was applied to account for these situations. The trip
patterns in Trip Generation are based on on-site parking situations, so the entering and exiting trips for
this site have been combined to reflect the trips related to valet operations (i.e. a guest entering trip
also results in a valet exiting trip to park the vehicle). It is anticipated that valet staff will walk between
the garage and hotel, so there are no additional vehicular trips anticipated related to transporting valet
staff back and forth.
1 Smith, Mary S.Shared Parking, 2nd Edition.(Washington, D.C.: ULI-the Urban Land Institute and the International
Council of Shopping Centers, 2005)
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 7
Table 3: Peak Hour Trip Generation
Weekday PM Saturday
Total Entering Exiting Total Entering Exiting
Hotel (Land Use Code 310) gg 44 45 110 62 48
127 occupied rooms
-10%for self-parking/transit use 9 5 4 11 6 5
80 39 41 99 56 43
Total entering and exiting 160 80 80 198 99 99
due to valet operations
It is worth noting that the studies that the Trip Generation estimates are based on Hotel land uses that
are outside of central business districts in suburban areas where most, if not all, trips are made by
vehicle. The exiting trips during the peak hour are likely related to hotel guests leaving for dinner or
other events. This trip pattern will be different at the Rip Van Dam, as hotel guests will likely walk to
restaurants and establishments within the downtown area. This would therefore also result in a lower
exiting trip rate than shown and this estimate is likely to be conservative.
2. �anquet Facility
The proposed banquet facilities will host events for up to 200 people(160 max for sit-down event, 200
max for stand-up event). It is anticipated that 80 percent of the annual banquet events will serve
"residential" purposes(i.e. attendees are primarily hotel guests)and 20 percent will be "non-
residential," such as weddings, fundraisers and other local events. So for most banquets and
conferences, the facility will not generate additional traffic beyond that of the hotel.
For"non-resident" banquet events, the peak periods for arriving and departing guests are likely to occur
at different time periods than the hotel check-in/check-out peak and would not be compounded with
those trips. It is also likely that a higher proportion of banquet guests will not use the valet service
because they live locally or are staying at another hotel. Since the banquet facility will not have
separate "blackout" rooms for presentations and meetings, it is not expected that it will host daytime
business conferences.
The ITE Trip Generation data for the Hotel land use includes sample studies of hotels that contain
restaurants and banquet/conference facilities, implying that the peak hour trip generation estimates
made for the hotel may include restaurant and banquet activities as well. However, if an estimate of
trip generation for a maximum capacity banquet were to be made, it would be similar to the parking
demand estimate for a "non-resident" event presented in IV.A. For a 200-person event, 65 valet
parking spaces were estimated. If as a worst-case condition, they all arrived within one hour, it would
result in 65 entering guest trips and 65 exiting valet trips.
Since "non-resident" events only account for 20% of anticipated banquet activity and the peak periods
are not likely to coincide with the hotel peaks,the future build volumes and analyses are based on the
average hotel occupancy trip generation.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 8
C. VALET OPERATION�
All guests that wish to park their vehicle through the valet service at the Rip Van Dam Hotel will pull into
the horseshoe driveway off of Washington Street into the porte corche. While valet operations increase
the trips in and out of the site driveway(as described in Trip Generation),the parking operation is much
more efficient. Drivers that would normally be circulating through city streets searching for parking are
now directed to one location and their vehicle is efficiently parked by valet staff.
The site plan provides enough storage for approximately eight vehicles to park in the driveway to
load/unload while still leaving the circulatory lane open. If needed,vehicles could be stored between
the parking lanes in the circulatory lane, which would allow standing room for another three vehicles.
With this storage capacity and the additional 50 feet of the entering driveway length between the porte
cochere and Washington Street, there should be ample on-site storage so that vehicles do not spill out
onto Washington Street.
The on-site storage capacity will also dictate the valet turnover rate that is to be achieved. Based on the
trip generation of the hotel and the vehicle storage capacity, enough valet staff will be provided to
turnover vehicles in 4%z to 6 %z minutes,where turnover equates to unloading and parking for an arriving
guest or retrieving a vehicle and loading for a departing guest. Valet staff will walk as a means to get
back and forth between the garage and the hotel (approx. 1400 feet). There are pedestrian facilities to
support this walking route on Washington Street to Broadway to Congress Street to Hamilton Street,
utilizing sidewalks and crosswalks at signalized intersections. This walking trip may be impacted slightly
during inclement weather. But the valet operations will also use the most efficient means possible to
reduce the number of walking trips necessary, having some staff at each the hotel and the parking
garage.
D. SITE TRIP DIS°TRIBUTION
The estimated site generated trips related to arriving/departing guests were distributed based on traffic
patterns at the intersection of Broadway&Washington Street and likely regional routes for hotel guests.
It is assumed that 50% will come from/to Broadway to the south, 30% from/to Broadway to the north
and 20% from/to Washington to the west. The egress driveway from the porte cochere will be
restricted to right-turns out only, so the exiting site generated trips were distributed to the west on
Washington Street. Additionally, to account for hotel guest trips related to self-parking, the trips related
to 10% credit taken were distributed to the study area intersections in the likely patterns to the public
parking supplies. The distributed hotel guest site trips are shown on Exhibit 3.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 9
a
�
�
Q
b
pm n
� L �" � i ~ ....
'ti � Uj � W �-�a rv
I �.
ia{ia) i(�) I 3z(�.$)
S(a) 1(1)
(1� — 21(22j
7(11) 7(11)
8(1�) 1(1) 1{1)—
Ii � ;
Washington Streef
� I �
v� 3
'; b
� LEGEND � N o
� xXX�XXX)_�nn(SAT� � °p
�
Exhibit 3: Hotel Guest Trips
Valet related trips were distributed based on the assumed route to the Hamilton Street parking garage
using Federal Street and Congress Street,which is shown on Figure 1 in Appendix A. The valet trips were
distributed to the site driveways and are shown on Exhibit 4.
�
u
m
4
a
o '�
� � �
� '� i"' w
i
. �i �
� 3��s�)
� 41{43)
41(43) �
�II
3 Washington Street I
a�
� � ro
y � b
a LEGEND �
� Xf(X(XXX)=PM(SAT} °�
�
Exhibit 4: Valet Trips
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 10
E. FUTURE BUILD VQLUME�
The site generated traffic (guest and valet trips) was combined with the 2015 No-Build volumes to
represent the estimated future volume conditions for the site. The future 2015 Build volumes are
shown on Exhibit 5.
�
u
rs
4
� �
o a' � a
� �- •'.'.
r�5 +. � o
d '~-I N � w � w 0�0 d
� I
48 — 180(210) 32(45)
�138 180(210)
31 - - 65
i�3 � ° as(54` 268(135}--
19 3�4(269� -- �76(215� —� 108(80}� -
� � �
Washingfon Street
a � n
a r� o� �n .�
w �
� � o b
bLEGEND � o 0
� XXX(XkX�=PM(SA7) r" �- �
Exhibit 5: 2015 Build Traffic Volumes
F. TFtUCi�ACCOMODATIONS
The original proposal to modify the corner curb in the northwest quadrant of the intersection of
Broadway&Washington Street (Starbucks corner)to better accommodate heavy vehicles is no longer
applicable;the curb line and ramps will be replaced as they exist. Based on meetings and discussion
with the Public Works Commissioner, it is proposed to move the Washington Street stopbar back
approximately 30 feet to accommodate trucks turning right onto Washington Street from Broadway. It
is noted that the moving of the stopbar is to accommodate an existing condition and that is not
worsened by this project. Moving the stopbar may require additional red clearance time at the traffic
signal to allow vehicles to get through safely. But that slight change is not anticipated to impact traffic
operations.
The existing loading zone on the north side of Washington Street will also be moved to the south side of
the street. This provides sufficient storage for a WB-67 in the loading zone and eliminates the possibility
of the vehicle's service ramp impeding on the crosswalk,which was a concern with the loading zone on
the north side. Four on-street parking spaces are lost with this change. A letter dated September 26,
2013 addressed to Kate Maynard, included in Appendix F, presents this revision and the delivery
schedules.
For delivery vehicles servicing the hotel,they will use the service driveway to the west of the horseshoe
driveway,which accesses the loading dock and trash compactor enclosure. Maestro's restaurant
receives two to three daily deliveries in single-unit box trucks in the early morning, outside of peak
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 11
traffic periods. Since Maestro's kitchen will also be handling the catering of the banquet events, it is not
expected that the number of deliveries will increase;they will just receive larger shipments from the
same vendors. The Adelphi Hotel will also be accepting their deliveries from this service driveway, but
the management of both hotels will be working together to coordinate and consolidate the deliveries.
All laundry will be done in house at the hotel, so the only additional expected delivery truck would be to
accept soap and dry goods once per week. All delivery vehicles using the service driveway will be able to
pull in and turn around in the loading dock area (i.e. no vehicles will be backing in).
The delivery route of these vehicles is unknown as it depends on their other deliveries downtown. A
turning template for a 30-foot delivery vehicle pulling into the service entrance is attached in Appendix
B.
The only deliveries that will use the Washington Street loading zone are two per week for Starbucks
(existing)and three vendors for Maestro's that deliver twice per week.
Garbage pickup will be done on-street, as the collection trucks cannot maneuver into and out of the
service driveway. Hotel staff will wheel the trash compactor bins to the curb when the garbage removal
truck arrives. Two other residential buildings Downtown use a similar roll-off compactor system. The
pickups will be scheduled with Waste Management as needed and will occur late morning/midday,
outside of peak traffic periods.
�. EMPLOYEES
The hotel management provided employment estimates for hotel operations. It is expected that some
of the staff levels will increase for the first three years as the average occupancy of the hotel grows
(housekeeping,valet and kitchen). The shifts and number of staff are provided in Table 4.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 12
Table 4: Hotel Staffing Schedule
Staff Position Shift Year 1 Year 2 Year 3
General Manager 6:00 AM—6:00 PM 1
Front Office Manager 6:00 AM—6:00 PM 1
Director of Sales 8:00 AM—6:00 PM 1
Director of Engineering 7:00 AM—4:30 PM 1
Executive Housekeeper 7:00 AM—4:30 PM 1
Sales Manager 8:00 AM—6:00 PM 1
Front Desk 7:00 AM—3:00 PM 2
3:OOPM -11:OOPM 2
11:00PM-7:00AM 1
Housekeepers 7:00 AM—3:30 PM 11 13 15
Valet 7:00 AM—3:00 PM 3 4 5
3:OOPM -11:OOPM 2 3 4
11:00PM-7:00AM 1
Maintenance 7:00 AM—3:00 PM 1
3:OOPM -11:OOPM 1
Accounting 8:00 AM—5:00 PM 1
Human Resources 8:00 AM—5:00 PM 1
Maestro's 6:00 AM—9:00 AM 8 9 10
11:OOAM-2:OOPM 12 14 15
5:00 PM —11:00 PM 20 22 23
The shifts outlined show that very few shift changes occur during the peak hour of adjacent street
traffic. By year three, at most 27 employees will be arriving or departing during the PM peak hour.
For scheduled banquet events, it is anticipated that one server would be provided per 20 attendees and
one bartender per 30 attendees. The existing kitchen staff will also require supplemental personnel,
depending upon the menu. Generally, one additional person is required on the kitchen staff per 30
attendees. One valet is needed per 20 attendees,for 30 minutes before and after the start of the event
and for the end of the event. So for the maximum 200 person event, approximately 33 additional staff is
required. As noted previously, a sufficient number of valet staff will be provided to meet the hotel's
needs;valet staff projections provided here are an estimate.
As described in the Parking section,there will be no designated employee parking for the facility. Like
most other businesses Downtown, employees will utilize public parking,walk or use transit.
H. PEDESTRII�N ACCC�MMODATIONS
The entrance to the hotel on Washington Street provides pedestrian access with heated sidewalks along
both sides of the horseshoe driveway and a stamped concrete entrance from a landscaped area
between the driveways.
The site plan includes one additional curb cut compared to the existing condition for the service
driveway, but the activity will be low and most deliveries will occur early morning.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 13
Sight lines were reviewed from the exiting horseshoe driveway and the service driveway to determine if
drivers and pedestrians can see each other at these curb cuts; a figure is provided in Appendix A. The
sight lines are shown from a driver's vantage point 14.5 feet behind the sidewalk exiting the horseshoe
driveway. Sight lines for the exiting horseshoe driveway and the service driveway are also shown from 8
feet behind the sidewalk, as most drivers will pull up to the sidewalk to check for pedestrians. Drivers
are expectant of pedestrians in the Downtown setting.
As shown, drivers exiting the horseshoe driveway have sufficient sight lines to pedestrians on both
sidewalk ramps. It is noted that the landscaping plan does call for a tree planting on the east side of the
driveway, but the tree type has a branch canopy higher than six feet and will not impede sight lines.
Drivers exiting the service driveway will have a more limited view down the sidewalk due to the building
face, but will have a sight line to pedestrians at the ramps when they stop at the sidewalk. It is
recommended that signing be provided along the service driveway to warn drivers to watch for
pedestrians. Additionally, hotel staff will be assisting all service drivers at this entrance since it is gated,
so that staff person can also assist the driver and pedestrians.
V. CAPACITY ANALYSIS
Traffic operations at the studied intersections were analyzed for the 2013 Existing, 2015 No-Build and
2015 Build conditions. The intersection of Broadway & Washington Street was analyzed for the
Weekday PM and Saturday peak hours; the intersection of Washington Street & Federal Street/Railroad
Place was just analyzed for the Weekday PM peak hour. The site driveways were also evaluated for the
2015 Build condition for both peak hours. The analyses were completed using Synchro 7 software and
the methodologies of the 2000 Highway Capacity Manual. The procedures describe operating
conditions in terms of Level of Service (LOS). In general, "A" represents the best operating condition and
"F" represents the worst. Descriptions of LOS and the associated performance measures set forth in the
HCM 2000 are provided in Appendix D. The capacity analysis worksheets are provided in Appendix E.
Summaries of the analyses are shown in Tables 5 and 6 for the Weekday PM and Saturday Midday Peak
Hours, respectively. These analyses show that the traffic generated by the development will have an
insignificant impact on traffic operations at the studied intersections. The traffic signal timings were
optimized for the No-Build and Build conditions, which assigned one additional second to the
Washington Street approach at Broadway.
During the Weekday PM peak hour, the westbound approach at the intersection of Washington Street &
Federal Street/Railroad Place and the overall LOS changed from a LOS B to C under the Build condition.
However, the overall delay only increases by 3.3 seconds. During the Saturday peak hour, the
northbound approach at the intersection of Broadway &Washington Street and the overall LOS changed
from a LOS B to C under the Build condition. However, the overall delay only increases by 1.6 seconds.
These changes have insignificant effects on the traffic operations, are still within acceptable ranges and
show that the project does not have an impact on the surrounding roadway network.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 14
Table 5: LOS Summary-Weekday PM Peak Hour
EXISTING No-Build Build
Intersection Approach (2013) (2015) (2015)
LOS Delay LOS Delay LOS Delay
EB C 33.7 C 32.5 C 34.3
NB B 16.1 B 18.4 B 19.2
Broadway&Washington Street
SB B 11.5 B 12.4 B 12.0
OVERALL B 17.9 B 18.9 B 19.4
EB B 12.6 B 15.9 B 18.0
WB B 12.2 B 15.2 C 22.1
Washington Street& Federal Street/ NB C 22.9 C 23.1 C 22.3
Railroad Place
SB C 30.8 C 20.2 C 24.5
OVERALL B 19.5 B 18.3 C 21.6
Washington Street& Exit Driveway SB - - - - A 9.9
Washington Street& Enter Driveway EB - - - - A 1.5
LOS:Level of Service
Delay:average delay per vehicle(seconds)
Table 6: LOS Summary-Saturday Midday Peak Hour
EXISTING No-Build Build
Intersection Approach (2013) (2015) (2015)
LOS Delay LOS Delay LOS Delay
EB C 30.6 C 29.6 C 34.1
N B B 16.7 B 19.8 C 20.9
Broadway&Washington Street
SB B 12.3 B 13.3 B 13.3
OVERALL B 17.1 B 18.6 C 20.2
Washington Street& Exit Driveway SB - - - - B 10.5
Washington Street& Enter Driveway EB - - - - A 2.0
LOS:Level of Service
Delay:average delay per vehicle(seconds)
A. VEHICLE QUEUES
As described previously,the existing average queue on Washington Street is four to five vehicles during
the peak hours. Based on the site plan, there is approximately 40 feet between the stopbar and the
entry driveway to the hotel,which is enough storage space for approximately two vehicles. So if the
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 15
average maximum queue at the signal is greater than the vehicle storage available,vehicles entering the
site from the west will have to wait in queue for the green signal phase for the queue to clear to enter
the driveway.
The exit driveway is going to be limited to right-turns out only through the use of signing on the
driveway. This will eliminate the impact that the queue on Washington Street has on blocking the
driveway and vehicles exiting the site will not compound the eastbound queue. Patrons that are
destined for Broadway can easily get there via Congress Street or Division Street.
The northbound queue on Broadway at the Washington Street signal was also evaluated at the request
of CME. The storage on this segment between Washington Street and Spring Street is only
approximately 90 feet. The intersections of Washington Street and Spring Street operate from the same
traffic signal controller, with both streets getting the green indication at the same time. The g5tn
percentile queue length during the Weekday PM peak hour conditions is summarized below in Table 7.
Table 7: Queue Length Summary—Weekday PM Peak Hour
Intersection Approach EXISTING No-Build Build
(2013) (2015) (2015)
Broadway&Washington Street NB 195 226 242
Queue provided is 95`"percentile queue in feet.
As shown,the northbound queue length extends beyond the available storage in the Existing and No-
Build conditions. The queue increases by less than one vehicle length as a result of the project (16 ft)
and does not indicate a project impact. Since both intersections operate from the same controller,the
arrival patterns of northbound vehicles is actually different than shown and much of that queue is likely
to be waiting south of Spring Street and not in this short segment. It is noted that there is currently a
project being undertaken by the City to study the Broadway corridor, including the traffic signals. Any
concerns about the existing vehicle queuing and operations may be evaluated during that study.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 16
VI. CONCLUSION
The proposed renovation and expansion at the Rip Van Dam Hotel will provide 176 new guest rooms
and a banquet facility that will accommodate up to 200 guests. The hotel will operate a valet service
from a porte cochere (structure over the driveway to shelter the loading/unloading of vehicles) on
Washington Street where guests will drop off and unload their vehicles. Storage to park vehicles from
the valet service will be provided in a proposed parking garage on Hamilton Street,which will house 274
spaces.
Parking demand estimates were made based on average hotel occupancy, non-resident banquet event
estimates and assumptions on public parking and transit use. It is estimated that the proposed garage
on Hamilton Street will have a surplus of parking supply to support the hotel and banquet parking
demand as well as to provide daytime parking for Palio Communications. All parking demand scenarios
presented show a surplus of parking supply in the proposed garage and parking utilization observations
conducted identified availability of public parking for hotel employees. However, since there is a surplus
estimated in the proposed Hamilton Street garage,there may be opportunities for some employees and
Maestro's customers to utilize the excess parking supply.
Trip generation estimates for the hotel were made for the Weekday PM and Saturday peak hours,
utilizing data published in Trip Generation, 9`"Edition (ITE). Since a valet service is being utilized, each
entering guest trip estimated also creates one exiting valet trip to park the vehicle. Likewise, each
exiting guest trip results in an entering valet trip to retrieve the vehicle. As a result, it is estimated that
the site will generate 160 trips (80 in, 80 out) during the Weekday PM peak hour and 198 trips (99 in, 99
out) during the Saturday peak hour.
It is noted that the Trip Generation data is based on Hotel land uses that are outside the central business
district,where most, if not all,trips are made by vehicle. The trip pattern will be different at the Rip Van
Dam, as guests will likely walk to restaurants and other establishments Downtown. Therefore, the trip
generation estimate is believed to be conservative and the exiting trip rate during the peak hours is
likely to be lower. The study also did not take credit for the existing building uses that are eliminated as
part of the renovations.
The proposed banquet facilities will host events for up to 200 people(160 max for sit-down event, 200
max for stand-up event). It is anticipated that 80 percent of the annual banquet events will serve
"residential" purposes(i.e. attendees are primarily hotel guests)and 20 percent will be "non-
residential," such as weddings,fundraisers and other local events. So for most banquets, the facility will
not generate additional traffic beyond that of the hotel. Additionally,the ITE Trip Generation data for
the Hotel land use includes sample studies of hotels that contain restaurants and banquet/conference
facilities, implying that the peak hour trip generation estimates made for the hotel may include
restaurant and banquet activities as well.
Based on the trip generation of the hotel and the vehicle storage capacity within the site horseshoe
driveway, enough valet staff will be provided to turnover vehicles in 4%z to 6%z minutes, where turnover
equates to unloading and parking for an arriving guest or retrieving a vehicle and loading for a departing
guest. Valet staff will walk as a means to get back and forth between the garage and the hotel (approx.
1400 feet).
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 17
The estimated guest and resulting valet trips into and out of the site were distributed to the roadway
network to analyze the Build condition operations of the site driveway intersections and the
intersections of Broadway & Washington Street and Washington Street & Federal Street/Railroad Place.
Evaluations show that the site driveways are estimated to operate at LOS B or better. During the
Weekday PM peak hour, the westbound approach at the intersection of Washington Street & Federal
Street/Railroad Place and the overall LOS changed from a LOS B to C under the Build condition.
However, the overall delay only increases by 3.3 seconds. During the Saturday peak hour, the
northbound approach at the intersection of Broadway&Washington Street and the overall LOS changed
from a LOS B to C under the Build condition. However, the overall delay only increases by 1.6 seconds.
These changes have insignificant effects on the traffic operations, are still within acceptable ranges and
show that the project does not have an impact on the surrounding roadway network.
Existing queue observations were conducted on Washington Street during the same peak hours
evaluated for the capacity analysis exercise. The average eastbound queue on Washington Street at the
Broadway signal is four to five vehicles during the peak hours. This queue length is longer than the
storage capacity between the signal and the entering driveway, so vehicles entering the site from the
west will have to wait for the queue to clear during the green signal phase.
C, �/T Rip Van Dam Redevelopment Project-Traffic Impact Study Page 18
Attachment B
Site Plan
19 Washington Street Re-Development
City of Saratoga Springs, New York
�
,-- _� _.i
The LA GROUP
�� ��� � ��'�- ,_-� � LentlscapeArchi[e<ture@EngineeringP.C.
�,, . ��� �__1 0
�� ___' ..�, .x,--_�_ � P p6.PniPoso.P6u.
'f y SEE ENLARGEMENT 2 ON SHEET L-2.2 � � 1 -., r 40 Long Alley p 518 587 8100
� ��� � �� � Saratoga Springs F 518 587-0180
��- � / � \ � NY 12866 ww thelag�avP rom
r
r' —
CONCRETERETAINING � �� � - L-- I unautFo alt t add�tontotYis
` -• __
WALL BY 4RCHITECT �_ � � '� rruMr -- L .
�` �Y
MAINTENANCEAND _ . - �O" _�I � d�cu��e 'I�' r5ecio��z09orine
TM��NE�_. _ _ � _ _ . i � _ Newvor�.s reeouo�on�a,�.
STaFFACCESS pROPt— �. �� I
„—-_ _., _ ._ __ ______ _ _ _ _ ______i I � s;me�.�,a�o�pzoi�
i J
c
�I Iti
�� . . . ., � v��x��tor
_ _ - ' exisrwcsui�oiNc '1 353 Broadway
� � - i (noE�PHiHorE�� .
� — — �E I' � �� Acquisitions, LLC
— - . ~ �I,i SEE ENLARGEMENT 1 ON SHEET L-22 _ 353 BfoadWay
� - CONCRETE PAVEMENT ��� , I i SaYatoga Spring5,NY 12866
� i i i �
, .. . � io' �� O � ��� . - ?� _ ,���...- - . .. .. _ - - --I-- - - - - - --=i ill
8 9 �a
1� 12 13 14
— I
_ _ __ il
PROPOSEASCMENT� � - i � CONSERVATORV I � i
�r, I I �5 .� (AOELPHIHOTEL) i i
I �. '. � � O7 16 ', I. ,I I ',',.i I
� SEE SHEET L-2.1 FOR', °
BASEIdENT LEVEL PARKING�. O �� � �IyI - -- - '
LAYOl1T � .��/j� � I' ,
LdYLL�'2 i
- - - -- �II - - - - - - i
I .I � �S �e � - - �� i i-.�
w� O 19 20 .21 22 23 24 25 26 27 `LB 29 30 �III,
��,.I � 3 � � I ..III I ': �
UNNERSAL PRESERVATION HALL '� "' 18'TYP. '
' I o I I,__ __ _
. �I O �TYP ', GUESTDROP-OFF II II
I I
I O �
� II
31 32 33� 34 35 36 37 38 39 40 41 42 43 EXISTING �I �
I � MAINTENANCEANDSTAFFI � BUILDING ��I - -
I � ACCESS.. � �i IRIP VAN DAM)
� � � �
9 NP. � �
� ❑ I�� �
I I ��I I I � 4 ACCESSIBLE ---- --
- EXISTING --- - �� �6'1 PARKING �
�l � BUILDING
� I (ADMINISTRATION ' I � O O�O O O O O � m
II I I 44 45 46- 47 48 49 50 5�
OFFICES) TRASH& _ _ _ __ _
�� i i i -i RECVCLING
I � ROOW
EXISTING
. .-_� � I BUILDING
I I , (STARBUCKS)
� ���, � fi� d 4 � 4 � �I �—�-�� ���� �� - -- -- - o,e�Y r�,e
— — — — — — — — � �,—�� � � � � _ ��—�#; —�- �- �� �r �r '��R�e�rv+ — o '�� ��+�� �� i o - ` � 19 WaShingtOfl
� �� - �
— — _ �' �
, � }�
� ,, � � �
� ' -_ � ' �1�`� i i
— ----_ ._,
--- - -
"'"""�-" `�`� 19 Washington
Saratoga Springs,NY 12866
WASHWGTON STREET ��
SEE ENLARGEMENT 1 ON SHEET L-2.1
Vr jcR No: 20�0049
Oesiyn: CMI
LAYOUT NOTES LEGEND 2° ,° ° 5 '° 'S 2° �`�w� �s^^ `�`°' �sM
w�e: s/ia/�on s«i�: i°=�o�
�. ALL LWE AND GRADE WFORMATION SHi1LL BE LAI�OUT BY A NEW YORK STATE 8. CONTRACTOR SHALL COORDINATE LOCATION OF ALL UTILITIES(LWES.�UCTS,CON�UITS, ---- PROPERTY LINE J TRAFFIC SIGN� SCale'1"=20' Rev: Descriptien: oatz:
REGISTERED SURVEYOR ENGAGED BYTHE CONTRACTOR. SLEEVES,FOOTINGS,ETC.)WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS � �-�.� -
(WALLS,FENCE FOOTINGS,TREE ROOTBALLS,PROPOSED LIGHTING FOOTINGS,ETC.). � 12
2. ALL NE4V�NORK SHALL BE STAKED OUT PRIOR TO CONSTRUCTION.THE OWNER'S CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO OWNER'S REPRESENTATNE PRIOR ASPHALT PAVEMENT L-G.0
REPRESENTATNE SHALL 8E NOTIFIED OF ANY DISCREPANCIES.FIELD 4DJUSTMENTS TO CONTINUING WORK.
IdUST BE APPROVED BYTHE ONMER'S REPRESENTATNE PRIORTO CONSTRUCTION. � CONCRETE PA�/E�AENT Lfi.i ��I'� PAVERS Z
9. ALL EXISTING UTILITIES ARE SH04VN IN THEIR RELATIVE POSITION.CONTRACTOR IS ���4
3. ALLLINESANDDIMENSIONSAREP4RALLELORPERPEN�ICULARTOTHELINESFROM RESPONSIBLEFORVERIFYINGTHEVERTICAL&HORIZONTALPOSITIONOFEXISTING ��I HEATEDCONCRETEPAVEMENT L�6.0
4VHICH THEV ARE MEASURED UNLESS OTHER'�NISE NOTED. UTILITIES PRIOR TO CONSTRUCTION.
4. DIMENSIONS TO CURBS ARE FROM FACE OR BOTTOM OF CURB TO FACE OR BOTTOM OF 10. ALL PROPOSED OR RELOCATED SIGNS WITHIN THE CITV RIGHT OF WAV SHALL HAVE FlNAL -------- EXPANSION JOINT �6 z SEAT VVALL ���
CURB. LOC4TION APPROVED BY THE DEPARTMENT OF PUBLIC SAFETY BEFORE INSTALLATION. o.a��vi�,g rr/e
6"CURB �
5. FlELD ADJUSTMENTS MUST BE APPROVED BYTHE OWNER'S REPRESENTATIVE AND IF L-6.�
NECESSARYAPPROPRIATEMUNICIPALOFFICIALS. ;��(� 7 �y
�� 8"GRANITECURB e ': �+ TREEGRATE L62 Pl`d.Tllllllg BO`c�Sd tY XX.XXX I a �ut O,
6. ALL LAYOUTS FOR PIALKS AND PATHS SHALL BE ADEQUATELY STAKED BY THE ��� � L-6A i<.� AppYOVaI L y "�
CONTRACTOR4NDAPPROVEDBYTHEO\NNER'SREPRESENTATNEPRIORTO Materials Plan
CONSTRUCTION. = TRANSITION CURB e approved under authority of a resolution adopted
L-6.0 by the Planning 8oard of Ihe Ciry of Saratoga Springs.
7. ALL PROPOSED WALKS,PAVEMENTS,LIGHTS AND SITE IM1IPRONEMENTS SHALL BE STAKED 7
IN THE FIEL�FOR APPROVAL BY THE OLVNER'S REPRESENTATNE PRIOR TO --------------- FWSH CURB Lf.O
oraw�ng No.
CONSTRUCTION. HISTORICSTREETLIGHT fi � Chairperson
"�' L-6.1 L-6.1
� ACCESSIBLEPARKINGSPACE L-6.1 �ateSlgned�. L-�.O