Loading...
HomeMy WebLinkAbout20181052 2018.107 Regatta View Phase 3_Jones Corr_5-14-18JONES STEVES ATTORNEYS AT LAW IG off 1-ITIEFEIHOEM MA( 1 4 2013 k Li4 By May 14, 2018 Mark Torpey, Chairman Saratoga Springs Planning Board Saratoga Springs City Hall 474 Broadway Saratoga Springs, New York 12866 Re: Regatta View Area B Phase III Dear Chairman Torpey: We are pleased to submit the following materials to the Planning Board in furtherance of the above entitled application: 1. Concept Plan last revised May 9, 2018; 2. Regatta View Development Parameters; and 3. Conceptual images of units to be constructed. Our application was most recently before the Planning Board on January 18, 2018. During our presentation, we received valuable input from the Board on a variety of issues raised by Planning Board Members, the staff, and the Applicant. Over the past several months, we have studied those issues and formulated proposed solutions that are included in this package. We would ask that the matter be scheduled at the next convenient date on the Planning Board's calendar in order that the Board consider these responses. As you will recall from our presentation, the most interesting challenge for the Board and the Applicant was to design a site plan without the benefit of an Area and Bulk Schedule governing this part of the Interlaken PUD. While Judge Crowell found our application to be "zoning compliant" there are virtually no area/bulk restrictions applicable to this 6.79 -acre parcel. Inasmuch as General City Law Section 20 and our own municipal laws confer the power to enact such requirements solely on the City Council, we are relegated to other legal tools to achieve the mutual interests of the Applicant and the Planning Board over the regulation of the units to be constructed. The solution we propose was outlined in broad terms during the January 18 meeting. It involved the following elements: 68 West Avenue, P.O. Box 4400, Saratoga Springs, New York 12866 Phone (518) 587-0080 • Fax (518) 580-0857 info@saratogalaw.com • www.saratogalaw.com V:IMAIN FILES`Belmonte - Interlaken PUD 1Correspondence1Torpey. Mark lir 05.09.18.docx Mark Torpey, Chairman Page 2 of 8 May 14, 2018 1. The creation of zones (referred to herein as "Areas") within which the maximum of 12 duplexes (24 units) can be constructed in the configuration generally depicted on the attached drawing. The Areas would include a "Primary Building Area" within which various unit types (depicted on the drawings) can be constructed. The configuration would be determined solely by the Applicant. 2. To the rear of the Primary Building Area there will be a second Area that will allow specified accessory structures. This "Accessory Use Area" will permit such items as a deck, patio, screened -in porch, and other structures identified in the "Regatta View Development Parameters" under the heading of "Unit Amenities." 3. The third Area ("No Construction Area") is located to the rear of the Accessory Use Area and it will prohibit construction of any above -ground structure. Enforcement of the restrictions will be achieved by means of a threefold approach. First, the Declaration of Covenants and Restrictions to be filed by the to -be -formed HOA will limit construction as defined above. Second, the HOA will execute an easement to the City of Saratoga Springs so as to grant the City an enforceable property right allowing it to independently enforce the restrictive covenants. Third, the restrictions would be be set forth, in detail, on the approved site plan so as to authorize the City's Code Enforcement Officer to seek redress under the City Code. The mechanisms set forth above are designed to give both the HOA and the City enforceable legal rights within the condominium project. This will give both the City and the individual condominium owners (through the HOA) the legal tools needed to ensure compliance with the proposed restrictions. We have also attached our most recent iteration of the Regatta View Development Parameters. The Applicant will urge that these Parameters become part of the approved plans and, like the Concept Plan, incorporated into the Declaration of Covenants and Restrictions. The Parameters provide some basic provisions for the development of the project while giving the Applicant the needed flexibility to respond to the demands of the market place. It would be our intention to review this revised Concept Plan as well as the Development Parameters with the Board to ensure alignment on the procedure for enforcement of the needed restrictions that will serve as a substitute for the Area and Bulk Schedule. We seek to work with the Board to refine any responses to the agenda notes reviewed by the Board on January 18, 2018. The following sets forth the relevant text of Ms. Maynard's original agenda notes, followed by Applicant's response in bold. V:IMAIN FILESIBelmonte - Interlaken PUD'.Correspondence,Torpey, Mark Itr 05.09.18.docx Mark Torpey, Chairman Page 3 of 8 May 14, 2018 Issues to Consider: 1. Lack of area requirements present in the PUD, need to establish within any site plan approval. Application is for 24 (12 duplex) units in PUD without any underlying area requirements. With no initial concrete zoning requirements all requirements need to be created within any approval for initial construction and future reference. Recommend this be treated to a conservation subdivision application. Applicant Response: As noted above, the proposed site plan includes a series of Development Parameters intended to establish requirements for development of the proposed project. These Parameters, coupled with the limitations within the Primary Building Area, Accessory Use Area, and No Construction Area provide the needed development scope. Enforceability of the Parameters is provided in the three -prong approach described above. 2. Traffic and Access Concern for cut through traffic (cutting intersection from Dyer Switch/9P)? Applicant Response: Cut through traffic will not be a concern; a cut through the proposed project would involve a significantly more circuitous route with three turning movements. 3. Street width of 28' meets local road standard for alternate parking. Signage needs to be provided on plans in accordance with DPS requirements. What is proposed street name? Applicant Response: The required signage has been illustrated on the revised plan set. The proposed street name is Dartmouth Way. 4. Shared driveways have created 19 driveway points, reduced from 24. Private street proposed? Applicant Response: The proposed street will be privately owned and maintained. 5. Driveway and footprints of homes across from proposed access on Regatta View as well V:IMAIN FILESIBelmonte - Interlaken PUD Correspondence \Torpey, Mark ltr 05.09_ I fl.docx Mark Torpey, Chairman Page 4 of 8 May 14, 2018 as Dyer Switch need to be provided to understand if headlights / access management issues present. Applicant Response: Images of the proposed access points on Regatta View Drive and Dyer Switch Road are provided below. As shown, the proposed access point on Dyer Switch is located opposite an open field with no obvious impact to adjoining properties. The proposed access point on Regatta View Drive is located opposite a single family residential home. The location of this access point was positioned to maximize the distance from the existing boulevard entrance and minimize clearing of existing vegetation. Various mitigation measures, including the potential use of screening vegetation, have been reviewed with the adjoining homeowner at 6 Regatta View Drive and are currently under consideration. Proposed northerly exit to Dyer Switch Road V;IMAIN FILES1Belmonte - Interlaken PUDVCorrespondence.Torpey, Mark Itr 05.09.18.docx Mark Torpey, Chairman Page 5 of 8 May 14, 2018 Proposed southerly exit to Regatta View Drive 6. Pedestrian and bicyclist — Sidewalk connection should be provided on Regatta View Drive frontage out to 9P proposed sidewalk. Applicant Response: An existing sidewalk exists on the east side of Regatta View Drive; the proposed internal sidewalk of the project will connect to the existing Regatta View Drive sidewalk providing adequate pedestrian access. In addition, there currently exists substantial landscaping on the west side of Regatta View Drive that may be disturbed with the extension of a redundant sidewalk on the west side of Regatta View Drive. 7. 9P 8' wide multi -use path- complete streets plan doesn't call directly for sidewalk connection in this portion, called for signed, shared route for both bike and pedestrians. BUT seen as potentially good connection between neighborhoods both sides of 9P, as well as to reach Longfellows / Animal Hospital for example. Ability to site within existing cleared area within DOT ROW, not cut additional trees and site on private property? Applicant Response: Locating the proposed pathway on DOT lands creates V:1MAJN FILES Ilelmonte - Interlaken PUDCorrespandencelTorpey, Mark kr 05.09.18.docx Mark Torpey, Chairman Page 6 of 8 May 14, 2018 ownership concerns and potential design complications related to maintaining drainage. The previously proposed path location extended immediately east of the existing property line with no opportunity to move the trail west to avoid clearing without locating the pathway on DOT lands. Additionally, due to the existing right of way configuration and location of the existing entry sign and landscaping at Regatta View Drive the previously proposed path location would negatively impact the existing signage and / or result in additional vegetation removal in this location. Given the negative impact of the proposed pathway related to existing vegetation and landscape features and the lack of a planned sidewalk connection in this area the proposed pathway has been removed from the site plan. The project includes a proposed sidewalk along the internal street and a sidewalk along the south side of Dyer Switch Road from the proposed project entry to Route 9P. This network of internal and external sidewalks will provide ample opportunities for pedestrian access between neighborhoods, to Longfellows and the Animal Hospital without the need for an additional pathway along the western boundary of the property. Departmental Comments: 8. The Narrative should clearly state what the required fire flow is for these duplex units. Please provide the results of the hydrant flow tests. Applicant Response: The fire flow requirements have been included in the Water Service Narrative. Based on our initial review of the project with you we do not anticipate an issue related to pressure or flow for the project. The project will include connections to existing water mains on Regatta View Drive and Dyer Switch Road. Fire flow testing will be coordinated with the City Engineer's Office. The following represent comments and questions from Members and staff at the January 18, 2018 Planning Board meeting. SEQRA status: Applicant Response: The SEQRA Negative Declaration of June 2, 1982 and the Planning Board minutes of June 2, 1982 (page 3 thereof) reflect the SEQRA analysis and determination for the Interlaken PUD. Copies of same have been provided to the Planning Board's counsel and are on file with the Planning staff. V:\MAIN FILESIBelmonte - Interlaken PUD1CorrespondencelTorpey, Mark ltr 05.09.18.docx Mark Torpey, Chairman Page 7 of 8 May 14, 2018 This 24 -unit single family residential project falls well below the overall scope of the 500 housing units for the entire PUD. The number of units currently constructed within the PUD is considerably less than the 500 units studied. Consistency with Comprehensive Plan: Applicant Response: The project is consistent with the 2015 Comprehensive Plan. Responsibility for maintenance/plowing of road and sidewalk: Applicant Response: The HOA will be responsible for both. Dog Park: Applicant Response: The dog park has been removed. Footprints of proposed structures: Applicant Response: Configurations of the units are depicted on the attached Concept Plan. Retention of mature trees and vegetation: Applicant Response: The No Construction Area will prohibit the removal of mature, healthy trees and it will provide for the vegetative buffer. A split rail fence with appropriate signage will designate the area to ensure the mature trees remain undisturbed during and following construction. We look forward to the opportunity to discuss the foregoing with the Planning Board. It would be the Applicant's intention to receive further input from Members at its next meeting, then proceed to the preparation of fully engineered drawings for further review by the Planning Board. V:IMAIN FILES\Belmonte - Interlaken PUD`,Correspondence`Torpey, Mark Itr 05.09.18,docx Mark Torpey, Chairman Page 8 of 8 May 14, 2018 Thank you for your time and attention in this matter. MJJ cc: Peter Belmonte Lindsey Belmonte Travis Mitchell, P.E. V:\MAIN FILES Belmonte - Interlaken PUD\CorrespondencelTorpey, Mark kr 05.09.18.docx