Loading...
HomeMy WebLinkAbout2021083 Saratoga Hospital Mogan Street Campus Sketch Plan Review Saratoga Hospital Morgan Street Sketch Plan Review Issues and Responses April 14, 2021 Kevin Ronayne Vice President, Operations & Facilities The Saratoga Hospital 211 Church Street Saratoga Springs, New York 12866 Matthew J. Jones, Esq. C. Michael Ingersoll Jones Steves, LLP The LA Group Landscape 68 West Avenue Architecture & Engineering P.C. P.O. Box 4400 40 Long Alley Saratoga Springs, Saratoga Springs, New York 12866 New York 12866 Table of Contents Introduction 1 L Background 1 II. Development Process 2 a. Use of PUD amendment to achieve a better plan 2 b. Will the Hospital seek a variance to regain building height 3 c. Use of UDO or existing ordinance 3 III. Long Term Planning 3 a. Evaluation of census data 3 b. Development history 4 IV. Impacts 4 a. Parking 4 b. Increase density at site by constructing parking structures,possibly underground 5 c. Lighting 5 d. Blasting 5 e. Traffic (2015 study) 6 f. Traffic (2021 study) 6 g. Shuttle service for doctors 6 h. Need for eight stormwater basins 7 V. Site Amenities 7 a. Community farm 7 b. Water features 7 VI. Wildlife on Site 7 VII. Site Plan 8 a. Alternate configurations 8 b. Markey Estate 9 c. Collection of water on site for possible use by the Saratoga Golf and Polo Club 9 d. Need for connection to Park Place 9 VIII. Neighborhood Outreach 9 a. Communications with neighbors commencing July 2, 2015 9 IX. A Little History 10 a. Previous Planning Board review 10 Exhibit A 11 Exhibit B 13 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Table of Contents v2.docx Introduction: Following up on our February 25, 2021 presentation to the Planning Board, our development team has prepared the within "Issues and Responses" designed to more fully answer some of the inquiries raised by Planning Board members. To this end, we have grouped the issues and answers into the nine areas set forth below with an eye toward providing responses to the individual issues within each category. If we have done this correctly, the time spent before the Planning Board on April 22, 2021 can be focused on the changes to the LA Group's plans which accompany this submission, rather than the technical issues which will be advanced during a forthcoming site plan application. L Background: This second sketch plan review is the continuation of the Hospital's efforts to build medical office facilities on the three parcels it owns along (i)Myrtle Street(the "Markey Estate") and (ii)Morgan Street(the two vacant parcels acquired from D.A. Collins in 2019 consisting of the "large Collins parcel" — 14.12 acres and the "small Collins parcel" —2.0 acres)(see attached Exhibit A depicting the three parcels in yellow). That process began in August 2015 when the Hospital filed a PDD amendment petition with the City Council. The amendment petition arose out of the City Council's adoption of amendments to the City's Comprehensive Plan by resolution on June 16, 2015. Among the changes to the Comprehensive Plan was the re-designation of the land use map for this area to "Institutional." This change allowed the Hospital to seek an amendment to its PUD incorporating the three parcels into its PUD and providing for, among other things, a 75,000 square foot medical office building. In August 2015, the City Council determined the Hospital's PUD Amendment petition to have merit for review and referred it to the City Planning Board for an advisory opinion. The Council also deferred SEQRA lead agency to the Planning Board. The Planning Board heard a presentation from the Hospital on the objectives of the PDD amendment. It also received public comment from (i) Jack Despart of Morgan Street, (ii) Joann Novella of Seward Street, (iii)Marcie Taylor of 49 Doten Avenue, and (iv) Dean Higgins, individually and as president of Birch Run HOA II, Board of Directors. The Planning Board heard a second presentation from representatives of the Hospital on October 14, 2015. Included in the Hospital's presentation was a slideshow from Mark Nadolny of Creighton Manning Engineering. Mr. Nadolny's presentation discussed the impact of the proposed 75,000 square foot medical office building on neighborhood traffic. The presentation included a series of recommendations for mitigation which are discussed later in this submission. During public comment period, Mr. Higgins was the only individual offering comment. 1 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx Following the presentation, the Planning Board (i)unanimously adopted a SEQRA negative declaration and (ii) unanimously adopted a resolution stating as follows: positive advisory opinion for the addition of two parcels to the Saratoga Hospital PUD +/- 8.45 acres for the construction of a 75,000 square foot medical office building with a height of 52 feet with appropriate parking as presented on October 14, 2015. This proposal is consistent with the Comprehensive Plan and not contrary to the general purposes and intent of the Saratoga Springs Zoning Ordinance. The PUD amendment petition did not receive a vote from the City Council following (i)the filing of a protest petition triggering a supermajority vote and(ii)the recusal of two members of the City Council. The combination of those two actions deprived the City Council of the necessary four members to adopt the PUD amendment petition. The Saratoga Springs City Council did adopt a series of map amendments on December 23, 2019 which, among other things, re-designated the "Markey Estate" parcel and the large Collins parcel to OMBD-2. The remaining small Collins parcel was not part of the Council's action and it remains UR-1. After a year of intermittent study by the Hospital, whose resources have been taxed heavily beginning in March 2020 and continuing through this date, the development team was able to assemble some new drawings depicting the full build out of the entire 19 acres comprising the three parcels owned by the Hospital. Those plans were reviewed by the Planning Board during sketch plan review on February 25, 2021. II. Development Process a. Use of PUD amendment to achieve a better plan: A question arose as to whether the broad range of development tools available under a PUD Amendment might enhance the development plans for the three parcels by, among other things, increasing the density of construction on the parcels as well as increasing the building height to the level shown on the 2015 plan. Response: By the time the Hospital's 2015 amendment application was effectively defeated in early 2016, the City had embarked on the development of a Unified Development Ordinance. This new UDO was envisioned, among other things, to bring the City's Zoning Ordinance into compliance with the 2015 Comprehensive Plan amendments. The Hospital decided to await City action on the UDO with the expectation that the amendments to the City Zoning Map would reflect the adopted Comprehensive Plan land use map by amending the zoning designations from UR-1 to OMBD-2. Indeed, the City took this very action on December 23, 2019 in a resolution that included 18 parcels, including the Markey Estate and the large Collins parcel. 2 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx Inasmuch as the City Council took the proactive approach to rezoning these two parcels in a manner sufficient to accommodate the objectives sought by the Hospital there was no need (or desire)to pursue a further legislative act by the City Council that would be required for a PDD amendment. Moreover, although the Morgan Street lands are the last, significant vacant parcels in close proximity to the Hospital, the long-term planning needs of the Hospital can be accommodated with the medical office space shown on the submitted sketch plan. Succinctly put, the Hospital's internal studies suggest that the Morgan Street lands with the current zoning are adequate to meet the needs of the Hospital and the patients it serves for the foreseeable future. b. Will the Hospital seek a variance to regain building height: As reflected on the sketch plan presented to the Planning Board of February 25, 2021, the 75,000 square foot MOB will be several feet shorter than the 2015 version in order to achieve compliance with the 40 foot building height requirement of the Zoning Ordinance. To achieve compliance, the ground floor of the building will be lowered as reflected on the February 25, 2021 drawings. The result is that the building will sit lower into the ground. Correspondingly, the building height will be reduced to 40 feet under the height rules established by the Zoning Ordinance. c. Use of UDO or existing Ordinance: The timing of the adoption of the Unified Development Ordinance remains uncertain. Best estimates seem to point to a vote by the City Council in the latter part of the third quarter. The Hospital intends to submit a fully engineered, zoning compliant site plan well before then. As such, the rules of the current Ordinance will govern the site plan application. This is true even if the final vote on the site plan application were to occur after the UDO was adopted since the Hospital will have filed a"complete application" in advance of the adoption (and effective date) of the UDO. III. Long Term Planning a. Evaluation of census data: To assess its long-term physical plant needs, the Hospital closely follows census data within the Hospital's primary service area. Within the overall census data, the Hospital is particularly interested in the rate of growth for the age 65 and older population since it is this group that requires the highest level of medical services. Based upon our studies, we are confident that the 75,000 square foot medical office building, together with the additional 30,000 square feet from Phases II and III,will adequately address our current and future needs taking into account the projected growth. As with all census projections, there are certain assumptions associated with the demographics. Nevertheless,we believe we have the most conservative plan to meet the needs of those current and future patients from our primary service area. 3 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx b. Development history: As reflected in the slides from our February 25, 2021 presentation to the Planning Board, the Hospital has expanded significantly over the last 75 years. The expansion has occurred on our main campus at 211 Church Street along with major facilities in nearby towns (most notably Wilton and Malta) and into adjoining counties. The Hospital has been able to achieve this against the trend of mergers and consolidations in the healthcare field. In response to our growth it has been necessary for the Hospital to lease more than 45,000 square feet from private building owners in close proximity to the Hospital, including space on Church Street, Care Lane, and West Avenue. The leases are particularly expensive for the Hospital because in virtually all cases, we are required to incur the fit-up costs under DOH standards, then pay market rate lease prices. These leases will expire at varying times over the next 6 years allowing us to move medical practices to the new MOB. The savings to the Hospital will be substantial and it will allow the Hospital to use those resources to more directly serve the patients in our charge. IV. Impacts a. Parking: The City's Zoning Ordinance requires one space for each 200 feet of floor area(ZC 6.2.6 "Medical Offices/Clinics"). In practice, experience tells us that the demand for parking varies among medical practices, but on average experience tells us that the 1:200 ratio is a proven planning tool. The Zoning Code makes provision for"experience driven" of parking demands. Section 6.2.2(B) grants unto the Planning Board authority to waive the minimum number of required parking spaces in any Commercial ("OMBD-2")...district, provided (i)the applicant can demonstrate that sufficient parking accommodations can be provided and(ii)the applicant can demonstrate that the waiver will not result in any adverse impacts on the subject site or within the district. The flexibility provided under the Zoning Code may well allow the Hospital to seek regulation of its parking during the initial fit-up of the MOB. The Hospital contemplates initial fit-up is likely to be in the range of 30,000-50,000 square feet. The Hospital would sub-phase the building in a way that would allow it to occupy this level of square footage, leaving the remaining square footage to be fit up at a later time. Correspondingly, the Hospital would work with the Planning Board making use of the above cited provisions to build the parking necessary to accommodate the practices that have relocated to the new MOB. This would allow us the flexibility to build parking as the demand requires rather than construct all of the parking depicted on Phase I when a portion of that parking will not be needed until a later date. 4 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx b. Increase density at site by constructing parking structures,possibly underground: This inquiry posits the initial question of whether the Hospital would have a desire to increase density at the site, at all. We certainly recognize that the 19 acres that comprise the three sites are the last readily available (and sizeable) sites within close proximity to the Hospital. Nevertheless,the Hospital does not desire to make efforts to fully maximize the development potential of the three lots. Indeed, the plan we have developed presents, in our view, a modest development that respects the adjoining apartments, townhouses, and single- family homes across Morgan Street. As is discussed below, we also have much familiarity with the rock formations in this area(see "Blasting" section (d)below). Above-ground parking structures are expensive and underground structures would be prohibitively expensive. On balance, we think the MOB along with the possible expansion of three additional 10,000 square foot buildings in the future strikes the right balance for the site. c. Lighting: Lighting would be designed to minimize the total number of the lights and reduce the height to the light fixtures. As of this writing, we contemplate lights with a mounting height of 20' utilizing LED lighting in the fixtures and taking advantage of their ability to reduce lighting levels as the evening progresses. The lighting relay panels now used for lighting designs allow the flexibility to minimize light intensity through the evening hours. Our objective for this lighting design is to reduce lighting levels to full moon intensity from a set hour(perhaps 7 p.m.)until dawn. The lights proposed would not emit light in an upward direction into the night sky. All the lighting diodes would be housed inside the fixture head allowing the light only to shine down in a cone shape pattern. d. Blasting: Blasting during site preparation is a fairly common occurrence in our City particularly, but not exclusively, in the northwest areas of our community. Blasting for site preparation has occurred in the downtown area, in areas along North Broadway, as well as in close proximity to the Morgan Street parcels the Hospital proposes to develop. Here are some examples of projects where blasting for site preparation occurred: i. Park Place Apartments —immediately adjacent to Birch Run and the lands the Hospital proposes to develop in this project. ii. The City Center iii. Forno iv. The Pfiel Building v. Congress Park Center vi. Multiple buildings at Skidmore College vii. 254 Church Street 5 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx viii. Saratoga Hospital parcel known as "the Hill" located on the west side of Myrtle Street and adjacent to the Markey Estate. This area is home to (i) pulmonary and OB/GYN practices, (ii)the Rubin Dialysis Center, (iii)the Hospital's administrative building, and (iv)the helipad Residents of Birch Run and Morgan Street have the benefit of understanding the impacts of blasting during site preparation since blasting was used during the construction of the Park Place Apartments, adjacent to Birch Run and down the street from the single-family homes on Morgan Street. The City of Saratoga Springs has adopted strict protocols for blasting. Those protocols are included in the"Application for Blasting Permit" available on the City's website, a copy of which is attached hereto as Exhibit B. e. Traffic (2015 Study): During its SEQRA review of the PUD amendment on October 14, 2015, the Planning Board reviewed a traffic study from Creighton Manning prepare and submitted on behalf of the Hospital. That study focused its analysis of four intersections for which traffic counts were undertaken by CME. The analysis was summarized by CME Traffic Engineer Mark Nadolny. CME recommended the following mitigation measures— summarized below—that became part of the record upon which the Planning Board issued its negative SEQRA declaration: i. Church and Seward intersection—no mitigation recommended ii. Seward and Morgan intersection—no mitigation recommended iii. Morgan and Myrtle intersection—recommend all way stop iv. Church and Myrtle intersection—alter traffic signal green-time to increase by 5 seconds on the southbound approach from Myrtle Street and to reduce by 5 seconds the east-west approaches on Church Street. v. Sidewalks connections to be installed on Morgan and Myrtle Street. f. Traffic (2021 Study): The Hospital has engaged CME for an updated traffic study. As of this writing,the study has not yet been completed. The updated study will accompany our full site plan application to be filed in the near future. g. Shuttle service for doctors: Shuttle service to/from the MOB to the Hospital will certainly be considered as the date approaches for occupancy of the new building. As of this writing, the demand for such a service is not clear, although experience may provide us with peak demand hours which may correspond with weather conditions or time of year. With the installation of sidewalks fully extending along Myrtle Street to the site, we can envision many days when staff would enjoy the short walk to/from the Hospital. We can also envision times of the year when a shuttle would be a welcomed amenity for staff. 6 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx h. Need for eight stormwater basins: The Planning Board and its staff are familiar with City and State (DEC) requirements for the attenuation and treatment of proposed stormwater. Additional soil testing to determine suitability for infiltration and porous pavement, along with proposed site disturbance and grading will be necessary to determine the chosen practices along with sizing and locations. This work would take place as fully engineered site plan drawings are prepared. At sketch plan, the size and location of the proposed facilities represents our best estimate of a stormwater system that would be compliant with current regulations. V. Site Amenities a. Community garden: The Hospital is enthusiastic about incorporating a community garden into Phase I of the site plan. In the first sketch plan we located the community garden toward the easterly side of the property in proximity to a group of townhouses of Birch Run residents. At the request of residents, we have now shown the community garden in an area around the Markey Estate. The Hospital has not settled on the location, but we are interested in the views of the Planning Board. At present, we contemplate a relationship with an outside provider akin to the model at Pitney Meadow Farms. It is very early in the process, but we note The LA Group was the landscape architectural firm that designed the Pitney Meadow Farms on West Avenue and we trust that existing relationship together with the experience gained in the development of Pitney Meadow Farms may work to the benefit of all parties. b. Water features: A question arose as to whether our site plan could accommodate water features (ponds for example) on the site. Amenities of this nature would undoubtedly add to the visual appeal of the project. The development team is studying the addition of water features that may include fountains in one or more locations on the site. The team will be providing further information on this during formal site plan review. VI. Wildlife on Site a. One of the advantages of being able to acquire 16 additional undeveloped acres in close proximity to the Hospital is the presence of wildlife at the site. Our Phase I development—the MOB —closest to Morgan Street will certainly impact wildlife in the southeasterly portion of the site. For the foreseeable future, we expect much of the wildlife in the areas nearest the Saratoga Golf and Polo Club and along the northerly boundary line with Birch Run to continue—to a degree—in much the same fashion as is currently the case. The presence of wildlife on our 7 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx site would be a somewhat unique benefit for a newly constructed medical office building. We feel fortunate in this regard. VII. Site Plan a. Alternate configurations: Since the Hospital began working on designs for the site in July 2015,we recognized an important limitation on the location of the MOB. Specifically, the MOB needed to be sited within 250 yards of the physical plant of the Hospital. The 250-yard rule arises out of the complicated Medicare reimbursement rates that distinguish hospitals from other medical providers. Succinctly put,Medicare has long recognized the unique role hospitals play in their communities. Hospitals are required to accept and treat all those who seek treatment regardless of their ability to pay. Oftentimes, the emergency room serves as primary care for many in the community who have nowhere else to turn. There is a different rate of reimbursement for medical providers who are part of a hospital system vs. those who operate as independent providers. Currently, the 11 off-site medical offices with Hospital based practices benefit from the higher Medicare reimbursement rates due to "grandfathering" clauses. The Hospital would lose the benefit of those grandfathering clauses (and the improved Medicare reimbursement rates) for any practice that moved to a new location, unless that new location is within 250 yards of the Hospital's main building. Put another way,the Hospital desires to move its off-site practices to a new MOB within 250 yards of the main hospital both for the savings to be achieved in the elimination of office leases, and also to retain the enhanced Medicare reimbursement rates. Even relocating those practices to new suites within their existing buildings would cause a loss of the grandfathered rate structure. This 250-yard Medicare rule significantly limits the placement of the medical office building on the site. Specifically, the building must be located in close proximity to Morgan Street to be within the 250-yard limitation. Even if the Hospital desired to do so, it could not site the MOB to the interior of the property without forfeiting substantial sums in Medicare reimbursement. The Medicare reimbursement issue aside, our team would be very hesitant to relocate the building away from Morgan Street. For a considerable number of years, city policy has urged planners to locate buildings with a physical presence at or near the street, even in circumstances where the primary entrance to the building is from the rear adjacent to a parking lot. Examples of such buildings include 254 Church Street and One West Medical. 8 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx For the reasons set forth above, our development team has consistently maintained its desire to relocate hospital medical practices to a new MOB which fronts on Morgan Street and is located within 250 yards of the Hospital's main building. b. Markey Estate: The Hospital has a strong desire to maintain the Markey Estate. We think it can be adaptively reused as offices for the Saratoga Hospital Foundation, a contemplated family practice residency program, and/or as conference space when otherwise needed by the Hospital. Apart from the significant benefits from this adaptive reuse (freeing up needed office space in the main hospital building for other higher priority uses)the Hospital recognizes the significant gift component of the conveyance of the building from the DiCresce family in 2014. From a pure policy standpoint our view is that if we can put the gifted asset to an important use, we wish to honor the donor by doing so. For these reasons we remain committed to keeping the Markey Estate as part of the Hospital campus. c. Collection of water on site for possible use by the Saratoga Golf and Polo Club: We recently explored with the leadership at SGPC a plan to collect water on our site to be used for purposes at SGPC. The response from SGPC was succinct, i.e. they are not interested in any transfer of water from our site to theirs. This is consistent with the position taken by SGPC when we made a similar inquiry in 2015. d. Need for connection to Park Place: Our sketch plan shows a connection to Park Place Apartments. Connections among adjoining projects have long been favored by the Planning Board which has sought, where feasible, connections between adjoining parcels. That said, we recognize that Park Place is a private apartment community and we would, of course, need to communicate with the property owners on the desire for a connector. Among other things, connectors can serve the function of emergency access (both ways) or provide limited (one way) access. Further study and communications with Park Place is needed in advance of site plan review. VIII. Neighborhood Outreach a. Communications with neighbors commencing July 2,2015: Among the reasons the Hospital has been able to be responsive to site plan issues (particularly from Birch Run residents) is the extensive communication that has existed between the Hospital, the two Birch Run HOAs, and individual Birch Run homeowners in close proximity to the site. Initial outreach to Birch Run residents occurred on July 2, 2015 in an email exchange with HOA II President Dean 9 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx Higgins scheduling a meeting among members of his Board and the Hospital development team to discuss our project and its impact on HOA II. Email exchanges between Mr. Jones and Mr. Higgins continued through the summer of 2015 and through Mr. Higgins appearances before the Planning Board on September 24, 2015 and October 14, 2015. On August 28, 2015 Mr. Jones, Mr. Ingersoll, and Hospital Vice President Kevin Ronayne met with the Board of Directors of HOA I and HOA II. The following week(September 3, 2015)Mayor Yepsen hosted a meeting in the City Council chambers of Hospital representatives and interested neighbors to review the Hospital proposal. An extensive Q&A period followed during which we received input from neighbors and answered questions about the proposal. Dialog between the parties continued in September with the receipt by the Hospital of written comments (9/15/15) from the Birch Run HOA. By the time the Planning Board issued its negative SEQRA declaration and positive advisory opinion on October 14, 2015, the Hospital was keenly aware of the concerns being raised by representatives of Birch Run and individuals in the surrounding neighborhoods. Meetings with representatives of Birch Run HOA I, HOA II and individual Birch Run homeowners have continued since our presentation to the the Planning Board on February 25, 2021. Those discussions have resulted in a revised sketch plan. We fully expect to continue dialog with Birch Run and other neighbors throughout the site plan review process, although we believe we have a full understanding of the desires of those offering input, even if we can't accommodate all of their requests. IX. A Little History a. Previous Planning Board review: As we pointed out during out sketch plan presentation of February 25, 2021, Chairman Torpey is familiar with the various objections by neighbors dating to the Planning Board presentations of September 24, 2015 and October 14, 2015. In addition to Chairman Torpey, three other members (Members Horton, Fabozzi, and Boivin, the latter being the author of that portion of the advisory opinion dealing with the Hospital parcels) heard complaints and objections from neighbors during the Planning Board's advisory opinion review culminating in the June 24, 2019 resolution of the Planning Board adopting its advisory opinion to the City Council. 10 V:\MAIN FILES\Saratoga Care\2021 Morgan Street Site Plan\Sketch Plan Review\Saratoga Hospital—Morgan Street Sketch Plan Application Issues and Responses v2.docx Exhibit A ___ 't' '2,4.4..t 7" :44^'•'-'•i:' - litiff ' r. '.. -,1: - JP ., if • _ . t. Saratoga v , , iii. f -3; " , • 44,„ .„. .4tg_ ,r Saratoga 11"1"1".."Nr-l.wi,o' „v .'- 11".11111br: / 7-- . ite .,,,,,,,,, dr -. . --; I -- 4.).......-4-',.:t a r,:7,1Z; ,.„-i.. Hospital 4" .1 _ k. .. i _ .1 Main Campus --f, 12 Exhibit B City of Saratoga Springs ;•y BUILDING DEPARTMENT • CITY HALL-474 BROADWAY-SARATOGA SPRINGS, NY 12866 PHONE 518-587-3550 EXT. 2511 kathleen.farone@saratoga-springs.org APPLICATION FOR BLASTING PERMIT APPLICATION MUST BE FILLED OUT COMPLETELY. Signatures of property owner, applicant (if different than owner)and contractor are required. Check payable to: Commissioner of Finance. FEE: RESIDENTIAL: $220.00 COMMERCIAL: $400.00 Location Information JOB SITE ADDRESS TAX MAP ID# ZONING DISTRICT REASON FOR BLASTING CONSTRUCTION TYPE USE OF BUILDING(S) FIRST FLOOR OCCUPANCY No. OF STORIES ARCHITECTURAL REVIEW DISTRICT YES NO D.R.C. DECISION DATE HISTORIC REVIEW DISTRICT YES NO (PLEASE ATTACH COPY OF DECISION) IS JOB SITE IN A FLOOD PLAIN? YES NO H.O.A.APPROVAL DATE(IF ANY) (PLEASE ATTACH COPY OF APPROVAL) IS PLANNING BOARD APPROVAL REQUIRED? YES NO P.B. DECISION DATE (PLEASE ATTACH COPY OF APPROVAL) PROPERTY OWNER INFORMATION CID# OWNER'S NAME PHONE ADDRESS EMAIL OWNER'S SIGNATURE DATE APPLICANT INFORMATION (IF APPLICABLE) APPLICANT PHONE ADDRESS EMAIL APPLICANT'S SIGNATURE DATE CONTRACTOR INFORMATION CID# COMPANY NAME PHONE ADDRESS EMAIL CONTRACTOR'S SIGNATURE DATE FOR STAFF USE ONLY: FILE# DATE/TIME APPLIED RECEIVED BY APPLICATION# PERMIT# DATE ISSUED PAID$ INSURANCE 14 Your application for a blasting permit must contain the following attachments including this original and four (4) copies: (Attached?) YES NO Evidence your firm is duly licensed pursuant to Section 458 of the Labor Law in the State of New York and the United States Bureau of Alcohol, Tobacco and Firearms. YES NO Precise location of the intended detonation of explosives, as well as the size charges intended to be detonated and the proposed schedule for detonation of explosives. YES NO Naming the City as an Additional Insured on Commercial General Liability including completed products and operations and personal injury liability insurance in the amount of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars Aggregate ($2,000,000) AND Excess Liability Insurance in the amount of Four Million Dollars ($4,000,000) per occurrence aggregate. All applicants must provide proof of NYS Statutory Workers Compensation, Employers Liability and Disability Insurance. YES NO Written evidence that the person intending to detonate has obtained permission to do so from all utilities within the blasting area including gas, electric, communications, cable and water and sewer. YES NO Description of all structures, including residential dwellings, located within 250 feet of the blast site and a list of the names and the addresses of the owner or owners of any parcel of property immediately adjoining or abutting the parcel of property from which the blasting is to take place, as shown on the most recent tax rolls of the City of Saratoga Springs. HOLD HARMLESS: The Individual filing this application, to the fullest extent provided by law, shall indemnify and save harmless the City of Saratoga Springs, its Agents and Employees (hereinafter referred to as "City"), from and against all claims, damages, losses and expense (including, but not limited to, attorneys' fees), arising out of or resulting from the performance of the work covered by this building permit application, sustained by any person or persons, provided that any such claim, damage, loss or expense is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of property caused by the tortious act or negligent act or omission of Applicant, its contractor or its employees or anyone for whom the Contractor is legally liable or Subcontractors. INITIAL Required Approvals/Dates: City Engineer/Date: Approval/Reject Dept of Public Safety/Date: Approval/Reject Dept of Public Works/Date: Approval/Reject Risk &Safety Mgmt/Date: Approval/ Reject Permit Issued/Date: Rejected/Date: Rejecting Dept: Reasons for Rejection: Notification to Applicant Date: 15 CHAPTER 81 BLASTING 81-1 Permit required; blasting defined A. No person, firm, corporation or legal entity shall engage in the activity of blasting anywhere • in the City of Saratoga Springs without first obtaining a blasting permit from the Building Inspector as provided in this Chapter. B. No person, firm,corporation or legal entity shall purchase,own,possess,use, transport,deal in,manufacture,or sell explosives or any substance used to provide explosion or force for the purpose of blasting anywhere in the City of Saratoga Springs without first obtaining a license from the United States Bureau of Alcohol, Tobacco and Firearms and the State of New York,Department of Labor. A copy of such license in effect shall be submitted to the Building Inspector along with any application for a blasting permit as provided in this Chapter. C. For purposes of this Chapter, the term "blasting" shall mean any act of exploding or detonating a substance for any lawful purpose of construction,demolition,renovation or conservation. NYS Department of Environmental Conservation permitted mining operations are excluded from this definition. 81-2 Insurance; fees A, A person or corporation applying for such permit is required to have a valid New York State explosive license issued by the State Department of Labor or other appropriate state department and shall provide a Certificate of Insurance: 1. Naming the City as an additional Insured on Commercial General Liability including completed products and operations and personal injury liability insurance in the amount of One Million Dollars($1,000,000)per occurrence and Two Million Dollars Aggregate ($2,000,000) AND Excess Liability Insurance in the amount of Four Million Dollars ($4,000,000) per occurrence aggregate. 2. Evidence of Statutory Workers Compensation and Employers Liability Insurance or a waiver of same as permitted by law. B. Execute a Hold Harmless Agreement, in a form satisfactory to the City, by which the applicant shall indemnify and save harmless the City of Saratoga Springs, its Agents and Employees (hereinafter referred to as"City"), from and against all claims, damages, losses and expense(including, but not limited to, attorneys' fees), arising out of or resulting from the performance of the work or purchase of the services,sustained by any person or persons,provided that any such claim,damage,loss or expense is attributable to bodily injury,sickness,disease, or death, or to injury to or destruction of property caused by the tortious act or negligent act or omission of Person or Contractor, its employer, agents or subcontractors. Chapter 81:Blasting Adopted by City Council 081605 1 08/29105 16 81-3 Incorporation of State Provisions The provisions of Article 16 of the Labor Law of the State of New York,as well as the Industrial Code Rules contained in Title 12, Part 39 of the New York Codes, Rules and Regulations, are recognized as applicable to the possession,handling, storage,and transportation of explosives within the jurisdiction of the City of Saratoga Springs and shall be complied with by all persons engaging in the activity of blasting. 81-4 Application for permit The application for a blasting permit shall be on a form approved by the Building Inspector and contain the original and four(4)copies of all such information as is required by the Building Inspector, including the following: (1) The name of the owner of the property upon which the detonation of explosives is intended to occur. (2) The business address of the person, firm or corporation proposing to detonate explosives on the subject property. (3) Evidence of the fact that the person, firm or corporation intending to detonate explosives is duly licensed pursuant to Section 458 of the Labor Law in the State of New York and the United States Bureau of Alcohol,Tobacco and Firearms. (4) The precise location of the intended detonation of explosives, as well as the size charges intended to be detonated and the proposed schedule for detonation of explosives. (5) Evidence that the person intending to detonate explosives has sufficient financial security or insurance coverage to provide payment for damages to any person suffering damages by virtue of the detonation of the explosives. (6) Evidence that the person intending to detonate has obtained permission to do so from alt utilities within the blasting area including gas, electric, communications,cable and water and sewer. Evidence shall be submitted in written form and attached to the application for blasting. (7) A description of all structures, including residential dwellings,located within 250 feet of the blast site and a list of the names and the addresses of the owner or owners of any parcel of property immediately adjoining or abutting the parcel of property from which the blasting is to take place, as shown on the most recent tax rolls of the City of Saratoga Springs. 81-5 Referral to City departments Upon receipt of an application for a blasting permit,the Building Inspector shall forward copies of the submitted application to the following city offices for review: Chapter 81;Blasting Adopted by City Council 081605 2 08/29105 17 Ill (a) the Office of the City Engineer; (b) the Department of Public Safety; (c) Risk and Safety Management; (d) the Department of Public Works. 8l-6 Notice to public The person, firm, corporation or legal entity conducting or causing any blasting operation within the City of Saratoga Springs shall cause notice of such blasting to be mailed to all property owners within 250 feet of the blasting site. Such mailing shall be by certified mail not less than ten (10) calendar days prior to the blasting activity. Said notice shall include a description of the blasting activity, a description of all signals to be used during the blasting operation and an address and telephone number where property owners may request further information. 81-7 Issuance of permit Upon determining that all requirements have been met and the required fee paid, the Building Inspector shall have the authority to issue a permit for blasting activity as provided herein. 81-8 Fees A fee of One Hundred Dollars($100.00)shall be paid for each permit issued under this Chapter. A permit shall be valid for one(1) year from the date of issuance, unless specified as being valid for some other time period. 81.9 Additional restrictions Upon receipt of a permit,each Permitee shall provide to the Building Inspector a written statement that copies of all pre-blast surveys done in connection with the permit placed on file and retained at a specified location for a period of not less than three(3)years after the blasting activity is completed. 81-10 Penalties Any person, firm, corporation or legal entity engaging in blasting activities in violation of this Chapter shall be subject to the penalties set forth in Chapter 1, General Provisions, Article III of the Code. 81-11 Enforcement It shall be the duty of the Code Administrator to enforce the provisions of this chapter. In addition to and not in limitation to any power otherwise granted by law, the Code Administrator is hereby authorized to issue appearance tickets in violation of this chapter. 11:1281word10RD,REs\Qlasting Ord Chapter 81.doc Chapter 81:Blasting Adopted by City Council 081605 3 08129/05 18