Loading...
HomeMy WebLinkAbout20210320 Dyer Switch lot Line ADJ Application HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** fFOR OFFICE USE1 'O`:1 CITY OF SARATOGA SPRINGS %),Ip "P„, PLANNING PLANNING BOARD (Application#) azs A dr l- CITY HALL-474 BROADWAY t SARATOGA SPRINGS, NEW YORK 12866-2296 . TEL: 518-587-3550 X2533 (Date received) C0f'POF,Aj 4.A,' '''' www.saratoga-springs.org APPLICATION FOR: (Project Title) LOT LINE ADJUSTMENT Staff Review Submission Requirements: Please submit (check boxes): O Two (2) hard copies AND one (1) digital copy of the completed application. If approved, the City will require the submission of two (2) mylars (one for City records and one for the applicant to file with Saratoga County Real Property Services)and two (2) paper copies of the approved final plat. ■❑ Application Fee: Make checks payable to the "Commissioner of Finance". REFER TO THE CURRENT FEE WORKSHEET INCLUDED IN THIS DOCUMENT. Part I: General Information Applicant* Surveyor/Enqineer Name: Leta J.Rock-Wells Name: ABD Engineers,LLP-Mark C.Blackstone,P.L.S Address: 82 Dyer Switch Road,Saratoga Springs,NY 12866 Address: 411 Union Street,Schenectady,NY 12305 Phone: 518-441-1574 Phone: 518-377-0315 E-mail: wellsdent@yahoo.com E-mail: Surveying@ABD.com Property#1 &#2: Property#3: Tax Parcel#: 180.10-1-9&13 Tax Parcel#: 18.10-1-14 Address: 82&84 Dyer Switch Road Address: 14 American Way Owners Name: Leta J.Rock-Wells Owners Name: Paolo Marone and Andrea Marone Phone: 518441-1574 Phone: 203-583-9549 Identify primary contact person: EI Applicant ❑Owner ❑✓ Agent *An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. 0 Yes ONo Will any additional lots be created? ❑✓ Yes No Will the newly configured lots meet all minimum zoning requirements? ✓❑Yes No Will the proposed lot line adjustment comply with the Zoning Ordinance and Subdivision Regulations? ❑Yes E No Will the proposed lot line adjustment impede (existing or future)access or utility service to the lots? Part Il: Revised Final Plat and Documents Checklist The revised Final Plat must provide the following in accordance with the following checklist. • Sheet size: not to exceed 24"x 36" • Horizontal scale: not to exceed 1"=100' • Title Block: Include existing subdivision name,identifying title,the words"City of Saratoga Springs, Saratoga County, New York",submission date,names and addresses of applicants and/or property owners, engineers,planners, and surveyors. 0 Signature Block should reed: "Approved under authority of the Chairman of the Planning Board of the City of Saratoga Springs per the Subdivision Regulations,Article V." Chairperson Date Signed p Site location map 0 Location/type of property corners • Zoning requirements,area and bulk schedule,setbacks 0 Tax map numbers Cl Names of all adjacent property owners ❑ Location of all existing/proposed utilities:water,sanitary sewer,storm water ❑ Location of all existing/proposed water and sewer services ❑ Any existing/proposed easements ❑ Any existing/proposed covenants a Existing boundaries/area I: Proposed boundaries/area Cj Seal and signature by licensed land surveyor Part HI:Property Owner{s}Signature I,the undersigned,have thoroughly read and understand the.Application for Lot Line Adjustment and the list of items to be shown on the Plats and Documents for Final Review and I consent to all the requirements as set forth in this application. To the best of my knowledge the information provided in this application and on the attached proposed plat and accompanying documentation is true and accurate. Property#1 &#2: Property#3: Printed Nam _r .,. �. Printed Name: ?AD I tA2o N Si• ure: 1 ) Signature:Qv., 19--------- Date: _ - z 1 Date: 3 -21 - 2.1 To be completed by City of Saratoga Springs ❑Approved 0 Not approved by Chair Reasons: Note: If the requested lot line adjustment is not approved by the Planning Board Chair as a minor amendment,the applicant may seek approval by appearing before the full Planning Board. Signature-Planning Board Chair Date 2021 LAND USE BOARD FEE WORKSHEET OPED Fees Type 2021 Fee Application to Zoning Board of Appeals[1][2] TOTAL #VARIANCE Use Variance $1100+$50/app Area Variance-Residential $275/var+$50/app+$125 eachadd'I variance Area Variance-Multi-Family,Comm,Mixed-Use $660/var+$50/app+$200 eachadd'I variance Interpretations $550+$50/app Post-Work Application Fee Add 50%App fee+$50/app Variance extensions 50%ofApp fee+$50/app Application to Design Review Commission[1] TOTAL #STRUCTURE Demolition I $385 Residential Structures Principal $55 Accessory $55 Extension $35 Modification $55 Multi-Family,Comm,Mixed-Use Structures Sketch $165 Principal $550 Extension $200 Modification $330 Multi-Family,Comm,Mixed-Use Accessory,Signs,Awnings Principal $140 Extension $75 Modification $140 Post-Work Application Fee Add 50%App fee Application to Planning Board[1] TOTAL #STRUCTURE Special Use Permit[2] $990+$50/app Special UsePermit-extension $330 Special UsePermit-modification[2] $450+$50/app Site Plan Review-incl.PUD: Sketch Plan $330 Residential $330+$200/unit Residential-extension $200 Residential-modification $400 Non-residential $660+$130/1000 sf Non-Residential-extension $300 Non-Residential-modification $650 Subdivision-incl.PUD: TOTAL #LOTS Sketch Plan I $330 Preliminary Approval[2] Residential:1-5 lots $660+$50/app Residential:6-10 lots $990+$50/app Residential:11-20 lots $1320+$50/app Residential:21+lots $1650+50/app Residential-extension $330 Final Approval[2] Residential $1320+$175/lot+$50/app Non-Residential $2000/lot+$50/app Final Approval Modification[2] Residential $330+$50/app Non-Residential $550+$50/app Final Approval Extension Residential $135 Non-Residential $330 Other: TOTAL #LOT/ACRE Post-Work Application Fee Add 50%App fee Lot Line Adjustment $350 Letter of Credit-modification or extension $440 Letter of Credit-collection up to 1%ofLoC Recreation Fee $2000/lotorunit Land Disturbance $660+$55/acre SEQRA EIS Review(Draft&Final) TBD Legal Noticing if PB requires Public Hearing $50/app [1] Fees are based on per structure,except where noted. $0.00 TOTAL DUE [2] Legal ad required;includes City processing and publishing For Administrative Use Total Paid at Intake Revised Fee Balance Due / / Balance Paid Staff approval