HomeMy WebLinkAbout20200893 Dublin Underground Accessory Structure Correspondance Zi m bra amanda.tucker@saratoga-springs.org
RE: 85 Beekman St - ZBA
From : Jonathan Haynes <jhaynes@phinneydesign .com > Wed, Jan 06, 2021 10 : 05 AM
Subject : RE : 85 Beekman St - ZBA
To : Amanda Tucker <amanda .tucker@saratoga-springs.org >
CAUTION : This email originated outside of the City network. Please contact IT
Support if you need assistance determining if it's a threat before opening
attachments or clicking any links.
Amanda,
The total principal building coverage is 707sf, this is documented in the note on X1.2, and represents 19.7% of
the lot area as labeled on X1.1 in the zoning summary at the bottom of the page. Please let me know if there
are any other questions I can address on the project, and any information on the meeting date, time, and
location (or zoom).
Thank you,
Jonathan Haynes
Senior Project Designer I Construction Management
phinney design group
architecture I interior design I construction management
142 Grand Avenue, Saratoga Springs, NY 12866
291 River Street, Troy, NY 12180
t: 518.587.7120 x 26 I phinneydesign.com
From: Amanda Tucker [mailto:amanda.tucker@saratoga-springs.org]
Sent: Wednesday, January 06, 2021 9:56 AM
To: Jonathan Haynes <jhaynes@phinneydesign.com>
Subject: 85 Beekman St - ZBA
Hi Jonathan,
At the ZBA workshop on yonday, the Board requested the total principal building coverage to be
provided.
Thank you,
Amanda
Amanda Tucker, RA
Senior Planner