Loading...
HomeMy WebLinkAbout20200893 Dublin Underground Accessory Structure Correspondance Zi m bra amanda.tucker@saratoga-springs.org RE: 85 Beekman St - ZBA From : Jonathan Haynes <jhaynes@phinneydesign .com > Wed, Jan 06, 2021 10 : 05 AM Subject : RE : 85 Beekman St - ZBA To : Amanda Tucker <amanda .tucker@saratoga-springs.org > CAUTION : This email originated outside of the City network. Please contact IT Support if you need assistance determining if it's a threat before opening attachments or clicking any links. Amanda, The total principal building coverage is 707sf, this is documented in the note on X1.2, and represents 19.7% of the lot area as labeled on X1.1 in the zoning summary at the bottom of the page. Please let me know if there are any other questions I can address on the project, and any information on the meeting date, time, and location (or zoom). Thank you, Jonathan Haynes Senior Project Designer I Construction Management phinney design group architecture I interior design I construction management 142 Grand Avenue, Saratoga Springs, NY 12866 291 River Street, Troy, NY 12180 t: 518.587.7120 x 26 I phinneydesign.com From: Amanda Tucker [mailto:amanda.tucker@saratoga-springs.org] Sent: Wednesday, January 06, 2021 9:56 AM To: Jonathan Haynes <jhaynes@phinneydesign.com> Subject: 85 Beekman St - ZBA Hi Jonathan, At the ZBA workshop on yonday, the Board requested the total principal building coverage to be provided. Thank you, Amanda Amanda Tucker, RA Senior Planner