Loading...
HomeMy WebLinkAbout20200785 DeGregoria Residence House Plans 40 CONCRETE SLAB ON 6 MIL. 8"CMU POLY V.B.ON 40 WALLS COMPACTED FOR NEWr - I\/F6\ CRUSHED STONE "GORDON" o DOOR - 4'0" 5'4' REPLACE f OR 4'-8�� / 1 FOUNDATION RESIDENTIAL t COMMERCIAL \ - - ARCHITECTURE --TT T, REPLACE RIM JOIST 4'-0" "o v /LVL FOR HEADER \ f(OR 4'-8")f v d, (NO CMU ABOVE OPENING) m BRICK 3/0x6/8 INSULATED DOOR o I I SEP a I I MICHAEL P. PERRI 'A U L J ARCHITECT i-] FP/CHIMNEY i?--] a ABOVE 8 Jumel Place W Saratoga Sp"ngs,NY 12866 1430 It POINT LOAD 518.526.9265 votov..m�cnaelperriarcnnect.com 3-I/2"x II-7/8" 3-1/2'x9-I/4"LVL LVL BEAM ABOVE BEAM ABOVE --- (Z7T7 A� 1 �—777.'SPAN -—E RENOVATIONS TO: { \ 1 38 PINE ROAD No SS oQ MI_ _ Sara-toga Springs,New York Na CRAWL IGARAGE 1 .�,e.a®e.ff,o� �o .0—. MM SPACE MM NO STEM WALLS; ramie i-ZI u,u �"�°°"-- �t ` UP .7'-I'CLG.HT. SLAB ON GRADE REVISIONS m v 5"CMU WALLS v o MATCHING EXISTING DRAWN BY:TP * S 5 DATE.1/16/2020 REPLACE / SCALE.AS NOTED FOUNDATION SHEET NUMBER BRICK ® FOUNDATION PLAN `AO E A 00 BOVII I/4" I'-0" 1 — FOUNDATION PLAN 40-0" 6'-9" "CORDON" DOOR BELOW x t III II II r CASEMENT DH I\/F6\ 4'-S' \ 3/4 x 2/9 R.O. 2/6x3/0 R.O. / / -BRICK (2x)I6"x29'GLASS - N . (2x)I/5x2/7 VENT q HALF STEPS N 'o BATH "= DNo > o oQ 13"x22" °÷6 PROVIDES/8"TYPE'X' m' RESIDENTIAL I PORCH I 4� GLASS GYP.BOARD ON GARAGE COMMERCIAL z = 8 o SIDE OF WALL BETWEEN ARCHITECTURE 6-0" I�, HOUSE AND GARAGE N r i FP I. I� I CASEMENT 2 1 m 2/0 x 3/4 B+ a 20"x36"GLASS 6a I W 22"x35"VENT MICHAEL P. PERRI 3-1/2"x14"LVL a ARCHITECT • BEAM ABOVE 3-1/2"x14' LVL BEAM ABOVE i1m N �5r 5 5 ANT 1 (9'-9 SPAN) J N N* J W I t,-, 8Jumel Place a ] \ Saratoga Wings,NY 12866 518.526.9265 E m F \ 1 rn / DOUBLE 2210 FLOOR JOISTS w..w.micnaelpernarcnnec+.cam x FF OF N w AT I6"O.C.ABOVE / ~ RENOVATIONS dcl. �� - - / 2'-8' 8 TO: ga LL 1 IGARAGEI m 38 PINE ROAD mr N Q UP2 cL N 10-1/2"TREADS -, -' Sara-toga Springs,New York PICTURE w/I"NOSING 6/6x4/4 R.O. N 8"RISERS ,1 6/0x3/5 GLASS +6 EXISTING(4)2x10 BEAN ABOVE-NEEDS _ p^Q®g^ o i,o . __. A 9-1/2' LVL SISTERED TO EACH SIDE _� PE �r 1 (15'-0"SPAN-960 PLF) F,,,=„n,=EE,,,u g=^- REVISIONS S PORCH I BAY 63"x57"GLASS (40 16'x28"GLASS (2x)19"x30 VENT 6"O.H. 9'-4"M.O. v DRAWN BY.TP N. ABOVE-NSL NI® * DATE.I+16/2020 BRICK VENEER SCALE:AS NOTED / /29'-6' 17'-3" / SHEET NUMBER +/- +/- NOTES: I.ROOF FRAMING ARE TRUSSES I FIRST FLOOR PLAN Al 0 1 SPACED AT 24"O.G. AIOI I/4" . 11-0" 2.ALL WINDOWS TO BE NEW FIT TO SANE OPENING. FIRST FLOOR PLAN NATURAL LIGHT, VENTILATION t EMERGENCY EGRESS RECS. I\/F6\ REMARKS HABITABLE AREA OF REQ. ACTUAL REQ. ACTUAL SQ.FT. ROOM ROOM LIGHT/8% LIGHT VENT/4%OF VENT OPENING IN 50. FT. OF ROOM SQUARE ROOM AREA SQUARE FOR EGRESS RESIDENTIAL AREA FOOTAGE FOOTAGE COMMERCIAL FIRST FLOOR (2)18 SF DOOR EIS ARCHITECTURE (OPEN PLAN) 955 76.4 83 38.2 62.0 OPENINGS ® FILL JOIST END SPACES w/ �� 5'OF ROXUL(R-5/INCH) �I 1/2"ANCHOR BOLTS AT 48" �0� O.C,i 12"FROM CORNERS MICHAEL P. PERRI ilftt.__y ARCHITECT 44. 1 I%ICq41410g--:' 8 Jamel Place WitFINISH GRADE Saratoga Springs,NY 12866 518.526.9265 latik- III III III wrrvv.michaelperriarcicitecf.com 41; 11111E1 I El I El I ftill111E111E111 RENOVATIONS TO: ��'1 38 PINE ROAD 8'CMU w/"DUR-O-WALL" R-I9 FSK'BLANKETS" ��O LATERAL REINFORCING �I EVERY OTHER COURSE __ WATERPROOFING Saratoga Springs,New York ill (BELOW GRADE) 11,1471H: DRILL 44 BARS w/ it ��EFI u�u �,n,"��.__ EXISTING 4 EPDXY-IN IAI RE°1S1°"s EXISTING CONC.SLAB; PATCH AS REQUIRED a rqi CANTED WATERPROOFING Y TP InRETAIN EXISTING FOOTING on,EWNnsrrzozo IF IN GOOD CONDITION or 8'x I6"w/(2)CONT.it4 BARS SCALE OS NOTED SHEET NUMBER I DETAIL AT FOUNDATION WALL A201 A201 3/4" . P-0" DETAILS&SCHEDULES RENOVATIONS TO: 38 PI\E ROAD, SARATOGA SPRI\CSS, \EA YORK hl%6\ GENERAL NOTES FRAMING NOTES DRAWING LIST: RESIDENTIAL I. ALL WORK SHALL COMPLY WITH NYS BUILDING CODE AND ALL I.ALL INTERIOR WALLS TO BE 2x4's AT 16"O.C. TS -TITLE SHEET AND NOTES COMMERCIAL OTHER APPLICABLE CODES AND ORDINANCES OF THE LOCALITY 2.ALL NEW EXTERIOR WALLS TO BE 2x4'5 AT 16"O.C. ARCHITECTURE AND SHALL MEET THE ARCHITECT'S STANDARDS. 3.ALL HEADERS UNLESS OTHERWISE NOTED ARE(2)2xS's, AI00- FOUNDATION PLAN 2. FOLLOW MANUF'S INSTRUCTIONS FOR ALL MATERIALS INSTALLED. 4.FRAME ALL DOORS AS PER MANUFACTURER SPECS. 3. INFORM THE ARCHITECT IMMEDIATELY OF ANY CONDITIONS THAT A101 - FIRST FLOOR PLAN MAY DETRIMENTALLY EFFECT THE WORK. 4. ALL WORK SHALL COMPLY W/INDUSTRY STANDARDS INCLUDING ENERGY CODE COMPLIANCE A201 - DETAILS 6 SCHEDULES BUT NOT LIMITED TO NWMA, ACI, AICS,ANSI AND NEC. THIS PROJECT AS SHOWN CONFORMS TO THE MICHAEL P. PERRI 5. PROVIDE PROPER BEARING FOR ALL STRUCTURAL MEMBERS; REQUIREMENTS OF THE IECC 2015 FOR CLIMATE ZONE 5. REINFORCE PROPERLY;PROVIDE PROPER METAL FASTENERS AND ARCHITECT CONNECTORS AS NECESSARY INCLUDING SHEAR CONNECTORS AND BASEMENT R-19 CONTINUOUS HANGERS.WHERE EXISTING SUBSTRATE OR MATERIALS ARE DAMAGED, REPLACE AND REFASTEN TO ENSURE PROPER QUALITY WALLS MIN. R-3 PER INCH IN OPEN WALL OF JOB. CAVITIES REQUIRED 8Jomel Place Saratoga Springs,NY 12866 6, ALL LUMBER SHALL BE SPF 41 OR#2, 518.526.9265 7. ALL CONCRETE SHALL BE MIN.3500 PSI. ROOF/CEILING R-49 8. CONTRACTOR SHALL FIELD CHECK ALL DIMENSIONS. w.wv.mienaeioerriarenneet.eom 9. CONTRACTOR SHALL NOT VARY FROM PLANS WITHOUT EXPLICIT NEW WINDOWS U.3 or BETTER CONSENT FROMARCHITECT. 10. DO NOT SCALELF FROM DRAWINGS. 75%OF NEW LIGHT FIXTURES MUST BE LAMPED WITH HIGH RENOVATIONS II. ALL ELECTRICAL WORK SHALL COMPLY WITH NYS, NEC, EFFICIENCY BULBS. TO: NYBFU, REQS.CURRENT AT THE TIME OF CONSTRUCTION. 38 PINE ROAD 12. UPGRADE SMOKE DETECTION TO CURRENT CODE INTERCONNECTED, STEPS STAIR AND RAILING NOTES HARDWIRED W/BATTERY BACK-UP.ONE SMOKE DETECTOR x (SD)IN EACH BEDROOM AND IN COMMON AREA ON EACH FLOOR I.CLOSED RISER DESIGN INCLUDING BASEMENT. PROVIDE CARBON MONOXIDE DETECTOR 2.8-I/4" RISERS MAX. ON EACH LEVEL.BATTERY OPERATED DETECTORS SHALL BE (CALCULATE AS PER FINISH GRADE) Saratoga Springs,New York PERMITTED IN LOCATIONS THAT CANNOT BE READILY HARDWIRED 3.9-I/4"TREADS:36"WIDE(MIN.) AND INTERCONNECTED TO SYSTEM. DETECTORS OUTSIDE BR 4.HANDRAILS w/ -I/4'TO 2" DIA.GRIP REQUIREMENT 1C OP MUST BE WITHIN 15'. AT 36'HEIGHT MEASURED FROM TREAD NOSINGS. 13. PROVIDE ALL DEMO.,EBLOCKING AND RELOCATING. 14. PROVIDE ALL REMOVALS AND RELOCATION OF ITEMS TO 5. 1-1/2"MIN.SPACE BETWEEN HANDRAIL AND POSTS ""'"�®ej""`=""""®`_"`"'�'n' REMAIN AS REQUIRED. or WALLS. E""_ a =r-- 15. 2000 PSF MIN.BEARING CAPACITY OF BASE FOR ALL 6.WHERE APPLICABLE RAIL BALUSTERS SPACED w/3-7/8" FOOTINGS ASSUMED. OPENINGS BETWEEN. REVISIONS 16. PROVIDE FASTENERS BOLTS, ETC.COMPATIBLE w/MATERIALS 7.GUARDS AT 36"ABOVE FINISH FLOOR, WHERE REQUIRED. 4X4 POST RETURN TO WALL IN CONTACT. 8.THE STAIR DESIGN SHOWN 15 SCHEMATIC, V.I.F.AND OR 2X4 WALL OR NEWEL POSTS 17. RELOCATE ALL VENTS, HOSE BIBS, ETC.THAT WILL INTERFERE ADJUST AS REQUIRED;CONSULT WITH ARCHITECT ®� ®y u;/WORK. �m� ���� 1 1/2" DIA.RAIL I8.PROVIDE ALL TEMPORARY SUPPORTS REQUIRED DURING DEMOLITION AND REMOVALS -�-� �m BRACKET CONSTRUCTION. n DRAWN BY:.E I. PROVIDE AS NECESSARY AT EXISTING IN ORDER TO _ DESIGN CRITERIA ACCEPT THE NEW WORK. STAIR NOSING STAIR NOSING DA.e insroo BELOW BELOW SCALE.AS NOTED G L WIND SEISMIC FROST FLL 50 115 B 4'-0" 40 SHEET NUMaER TYPICAL fb STAIR RAILING DETAIL TS 3/4.-Ir-0' TITLE SHEET AND NOTES