HomeMy WebLinkAbout20200591 Dines Residence Correspondance 9/18/2020 Zimbra
OffC-rn
SEPI 8 2020
Good morning Amanda and Jennifer,thanks for taking the time to follow up with us an view our application
Here are a few answers to your questions/comments: Y
• Minimum lot size relief for Lot 1 (single family residence) is 250 SF
• Average lot width for Lot 1 is 44 feet. Minimum average lot width relief is 6 feet.
• • Noted that the min.front yard setback for existing structures not required
• Noted that the west side setback for existing structures is not required
• Noted on the 10' required setback per zoning ordinance. We can remove the patio curb leading to the
stair and reconfigure the landing for the patio/deck stair. Note that the existing patio/deck is part of the
existing structure.
• For clarification, are you referring to a sidewalk encroachment at Lot 1? If so, we can accommodate this
request and pull back the retaining wall and accompanying steps back to the property line.
• The owner is aware of the maneuverability into the space and is comfortable with it.
Brett and myself will be present for the zoom ZBA meeting.Thank you and please let me know if there are
additional info I can follow up on
Best,
Artur
Artur Dabrowski, RA
Balzer & Tuck Architecture
www.balzertuck.com
From: Amanda Tucker<amanda.tucker@saratoga-springs.org>
Sent: Thursday, September 17, 2020 11:44 AM
To: Artur Dabrowski <adabrowski@balzertuck.com>
CC:Jennifer merriman <Jennifer.merriman@saratoga-springs.org>
Subject: Re: 37-39 Ash Street ZBA Variance Application
Good morning Artur,
I have been reviewing this application with consideration from both Susan Barden and Patrick Cogan,
Zoning Officer. I know that there was quite a bit of correspondence on this while I was out on leave
earlier this spring.
A few questions/comments:
• Will need minimum lot size relief for Lot 1
• Will need minimum average lot width relief for Lot 1 - please provide
• Min. front yard setback for existing structures not required.
• West side setback for existing structures not required, east side and total side.
• Relief required for patio setback/patio ramp, 10' required per zoning ordinance - provide actual
setback
• The sidewalk encroachment will need to be eliminated
• Consider asking for relief for parking, there is a concern with maneuverability into and out of these
spaces.
In the meantime, I have put this application as a procedural item on the 9/28 ZBA agenda. The Board wil
likely begin the coordination of SEQRA review and defer Lead agency to the Planning Board. We won't