HomeMy WebLinkAbout2018036_385 Broadway_Site Plan Resubmission (2018-08-17)_8/24/2018 3:19:17 PM (3)
385 Broadway
Mixed-Use Development
TRAFFIC IMPACT STUDY
JULY 2018
Prepared for:
385 Broadway, LLC
553 Crescent Ave
Saratoga Springs, NY 12866
Prepared by:
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 300
Albany, NY 12205
GPI Project # 2018088.00
385 Broadway Mixed-Use Development
Traffic Impact Study i
July 2018
TABLE OF CONTENTS
Page
I. INTRODUCTION 1
II. PROJECT DESCRIPTION 1
III. EXISTING CONDITIONS 1
A STUDY AREA DESCRIPTION 1
B. EXISTING TRAFFIC VOLUMES 4
C. BACKGROUND TRAFFIC GROWTH 4
IV. PROJECTED TRAFFIC CONDITIONS 6
A. SITE GENERATED TRAFFIC 6
B. TRIP DISTRIBUTION 7
C. BUILD CONDITION TRAFFIC VOLUMES 7
V. OPERATING CONDITIONS 10
A. CAPACITY ANALYSIS DESCRIPTION 10
B. RESULTS OF ANALYSIS 11
VI. FINDINGS AND RECOMMENDATIONS 13
APPENDICES
A – Traffic Count Data
B – Capacity Analysis Worksheets
385 Broadway Mixed-Use Development
Traffic Impact Study ii
July 2018
LIST OF FIGURES
Page
FIGURE 1 – Site Location Map 2
FIGURE 2 – Study Area 3
FIGURE 3 – 2018 Existing Peak Hour Traffic Volumes 5
FIGURE 4 – Directional Distribution of New Site Trips & Trip Assignment 8
FIGURE 5 – Build Condition Peak Hour Traffic Volumes 9
FIGURE 6 – Optional Improvements Sketch 12
LIST OF TABLES
Page
TABLE 1 – Trip Generation Summary 6
TABLE 2 – Level of Service Criteria 10
TABLE 3 – Level of Service Summary 11
385 Broadway Mixed-Use Development
Traffic Impact Study 1
July 2018
I. INTRODUCTION
Greenman-Pedersen, Inc. (GPI) has been retained to assess the traffic impacts of a proposed
mixed-use retail/residential development located at 385 Broadway in Saratoga Springs, New
York.
The following report details the analysis performed to assess the traffic impacts of the proposed
development on the adjacent roadway network within the study area. It includes a summary of
the assumptions and procedures used in the analysis, the findings of the analysis, and it presents
any necessary measures to mitigate impacts.
II. PROJECT DESCRIPTION
The proposed development will expand the existing one-story building currently located at 385
Broadway to provide a multi-story mixed use building with retail/commercial space on the first
floor and residential units on the upper levels. Pedestrian access will be provided at several
locations including along Broadway. Parking will be provided and will be accessed through an
easement through the existing parking lot reserved for “Fingerpaint” employees and connects to
Division Street opposite Woodlawn Ave. A Project Location Map showing the site’s location in
relation to the area roadways is depicted in Figure 1 on the next page.
The proposed project, when completed, is expected to include 72 apartments (27 of these units
designated as “micro apartments), approximately 8,500 square feet (sf) of retail space (2,400 sf
being new retail space) and 60 parking spaces.
III. EXISTING CONDITIONS
A. STUDY AREA DESCRIPTION
A review of the adjacent roadway network and traffic data indicated that the intersection of
Division Street and Woodlawn Avenue/parking lot access was the only likely location to
possibly be significantly impacted by project traffic. An aerial photo of this intersection
depicting the lane geometry and surrounding area is shown as Figure 2 – Study Area.
1JUNE 2018
SARATOGA SPRINGS, NY 12866
MIXED-USE DEVELOPMENT
385 BROADWAY
PROPOSED
S
ITE
AREA
STUDY
WASHINGTON ST
N
CONSULTING ENGINEERS
GPI
Albany, NY 12205
Suite 300 FIGURE NO.DATE:
NO SCALE
SCALE:JOB NO.
Greenman-Pedersen
80 Wolf Road
TRAFFIC IMPACT STUDY
2018088.00
SITE LOCATION MAP
385 Broadway Mixed-Use Development
Traffic Impact Study 3
July 2018
Figure 2 – Study Area
A description of the roadways and intersections within the study area is provided below.
Intersection of Division Street and Woodlawn Ave. / Site Access – This 4-legged intersection
is two-way stop controlled with stop signs located on the Woodlawn Ave. and site entrance
(parking lot access) approaches. There are pedestrian crosswalks across the west Division Street
leg and the north Woodlawn Ave. leg. The sidewalk extends across the driveway to the
Fingerprint parking lot. The Division Street crosswalk additionally has pedestrian warning signs
facing both eastbound and westbound at the crossing. All approaches at this intersection include
a single lane from which all movements (left, through & right) are taken. The intersection is
located approximately 200 feet east of the signalized intersection at Railroad Place and 300 feet
west of the signalized intersection at Broadway.
Division Street – A two-lane urban street with parallel parking along both sides of the roadway.
The posted speed limit is 30 mph, which is the Citywide speed limit. There are sidewalks on both
sides of the street to accommodate pedestrians.
Woodlawn Avenue – This roadway is 2-lane urban street that runs perpendicular to Division
Street. It has a parking lane adjacent to the northbound travel lane and provides access to a lar ge
municipal parking garage on the northeast corner of the Division Street and Woodlawn Ave.
Intersection. There are sidewalks on both sides of the street to accommodate pedestrians and the
posted speed limit is 30 mph.
STUDY AREA
INTERSECTION
Parking for
Fingerpaint
Employees
385 Broadway Mixed-Use Development
Traffic Impact Study 4
July 2018
B. EXISTING TRAFFIC VOLUMES
Existing traffic operating conditions were determined through field reconnaissance and traffic
counts performed by GPI at the intersection of Division Street and Woodlawn Ave / Site Access
as previously mentioned.
Vehicular turn movement data as well as pedestrian activity was collected by GPI during the
hours of 7:00 – 9:00 AM and 4:00 – 6:00 PM on Thursday April 31, 2018. Based on the count
data, it was determined that the weekday morning peak hour for roadway traffic is 8:00 to 9:00
AM and the afternoon peak hour is 4:30 to 5:30 PM. The traffic count data sheets are included
in Appendix A of this report. Additionally, GPI reviewed NYSDOT seasonal adjustment factors
to determine how the count data compared to average annual conditions. The adjustment factor
for April, when the counts were performed, is 1.016, which indicates April traffic is typically
1.6% higher than average annual conditions. Because April traffic is similar and slightly higher
than average annual condition, no seasonal adjustment was made to the traffic count data to
conservatively estimate the average annual peak hour traffic volumes.
The 2018 existing peak hour traffic volumes used in the analysis are depicted on Figure 3 on the
next page.
It should be noted when reviewing the diagrams for the existing traffic volumes that pedestrian
crossing volumes are not only listed for the three marked and legal intersection crossings, but for
the fourth leg (no crosswalk) and for a diagonal crossing movement as well. With a large office
building on the southwest corner of the intersection and a heavily used parking garage located on
the northeast corner of the intersection, many pedestrians appear to take the most direct path
between them when possible, which results in a significant number of pedestrians making this
diagonal movement in the existing condition.
C. BACKGROUND TRAFFIC GROWTH
Since the Estimated Time of Completion (ETC) for this project is projected to be within
approximately one year and the development is located within a fully built up downtown area, it
is unlikely that any significant growth will occur before construction is completed. As such, no
background growth was applied to the existing traffic volumes and it is assumed that the existing
volumes will also be the volumes in place for the future No-Build condition (volumes during the
ETC timeframe if the development was not constructed).
422(PEDESTRIANS)
* NO CROSSWALK LOCATED IN THIS AREA
3JUNE 2018
SARATOGA SPRINGS, NY 12866
MIXED-USE DEVELOPMENT
385 BROADWAY 23617WOODLAWN AVE
(PEDESTRIANS)
* NO CROSSWALK LOCATED IN THIS AREA
23
88
37
(26)
(74)(79)WOODLAWN AVE
DIVISION ST. (1)*(11)*
(50)
(24)*
NOTE:DIVISION ST. PARKING
TO PROJECT
PM PEAK HOUR VOLUMES
AM PEAK HOUR VOLUMES
N
N
CONSULTING ENGINEERS
GPI
Albany, NY 12205
Suite 300 FIGURE NO.DATE:
NO SCALE
SCALE:JOB NO.
PEAK HOUR TRAFFIC VOLUMES
2018 EXISTING CONDITION
Greenman-Pedersen
80 Wolf Road
TRAFFIC IMPACT STUDY
2018088.0013667347032
122
55
8
164
29
8
88
27
(82)(8)*(106)
NOTE:
PARKING
TO PROJECT
385 Broadway Mixed-Use Development
Traffic Impact Study 6
July 2018
IV. PROJECTED TRAFFIC CONDITIONS
A. SITE GENERATED TRAFFIC
Once completed the project will consist of a total of 72 rental units and 8,533 sf of first floor
commercial space. The project also includes the addition of 60 parking spaces to support the
needs of the residents. These spaces will be accessed through the existing driveway easement
that connects to Division Street opposite Woodlawn Ave.
The current use of the site provides 6,136 sf of commercial space. Although a 2,397 sf increase
retail space is proposed, this is not expected to correlate to a direct increase in traffic, as no
parking is proposed to support this increase in retail use and being sited in an urban area (with a
walk score of 98) this increase in space should not directly correlate to an increase in traffic, as it
is expected that patrons will already be within the downtown area and any trips for the new
commercial space will be walking pass-by trips along Broadway that would be downtown
shopping regardless of whether this development was in place or not. However, the residential
component will have direct access to 60 dedicated parking spaces and will generate additional
traffic for the development. As such, it is appropriate to provide estimates of the additional
traffic that would be generated by the new 72 rental units proposed.
The project sponsor has provided the program
information shown to the right concerning the proposed
apartments.
Micro apartments are new trend in rental products that
are generally studio apartments of approximately 500 sf.
that typically appeal to young single persons.
Trip Generation forecasts are typically estimated using the Trip Generation Manual published by
the Institute of Transportation Engineers (ITE). For this project, the ITE Land Use Code 231
“Mid-Rise Residential with first floor commercial” was primarily used. However, since ITE
does not provide a micro apartment category, a study of micro apartments from Kirkland
Washington was used to develop traffic generation estimated for the 26 units that fit into that
category. The resulting trip generation estimated for this project are presented in Table 1 below.
TABLE 1
TRIP GENERATION SUMMARY
Apartment Type
AM Peak Hour PM Peak Hour
In Out Total In Out Total
46 Standard 4 10 14 12 5 17
(Trip Rate) * 0.30 0.36
26 Micro 1 3 4 1 2 3
(Trip Rate) * 0.14 0.13
Total New Trips 5 13 18 13 7 20
* Trip rate for standard apartments are from ITE, trip rate for micro apartments are from Kirkland, WA study
The walk score for the site location and referenced trip generation information from the Kirkland
study are provided in Appendix A.
Apartment Type
Number
of Units
1 Bedroom 1 Bath 34
2 Bedroom 2 Bath 1
2 Bedroom 2.5 Bath 11
Micro Apartments 26
Total 72
385 Broadway Mixed-Use Development
Traffic Impact Study 7
July 2018
B. TRIP DISTRIBUTION
Based on existing traffic patterns and potential commuter routes, it is assumed that the new site
trips will be distributed to the roadway network based on the following distribution:
• 25% to/from the North via Woodlawn Ave.
• 50% to/from the East via Division St.
• 25% to/from the West via Division St.
The traffic generated to and from the proposed site was split relatively evenly between the three
possible directions with most of traffic coming to/from the east due to the location of Broadway,
a significant north-south thoroughfare.
The trip distribution is depicted in more detail on Figure 4.
Applying this distribution to the projected trip generation for the site results in the AM and PM
peak hour trip assignments shown which is also shown on Figure 4.
C. BUILD CONDITION TRAFFIC VOLUMES
The build condition peak hour traffic volumes used for analysis were developed by combining
the No-Build condition traffic volumes with the trips generated by the proposed development.
The resulting Build Condition Peak Hour Traffic Volumes are illustrated on Figure 5.
It should be noted when reviewing the Build condition volumes that the illegal pedestrian
movements across Division Street were removed, and the pedestrian traffic making those
movements were shifted to the legal crosswalks. This was done to provide the most conservative
estimate of pedestrian delay for the analysis (as higher pedestrian volumes at a single crosswalk
would yield the highest delay for that movement). It is possible that a new crosswalk facility
could be constructed across the eastern leg of the intersection, which would split pedestrian
traffic between two Division Street crossings. If this occurs, operations at the two crossings
would be statistically better than that reported for a single crossing with more pedestrian traffic.
25%4JUNE 2018
SARATOGA SPRINGS, NY 12866
MIXED-USE DEVELOPMENT
385 BROADWAY 25%50%+7 (+3)+3 (+2) +3 (+2)PM: 13 IN / 17 OUT
AM: 5 IN / 13 OUT
AM (PM) NEW SITE TRIPS
WOODLAWN AVE
OUTBOUND TRIPS
INBOUND TRIPS
50%DIVISION ST. PARKING
TO PROJECT
TRIP DISTRUBUTION
TRIP ASSIGNMENT
N
N
CONSULTING ENGINEERS
GPI
Albany, NY 12205
Suite 300 FIGURE NO.DATE:
NO SCALE
SCALE:JOB NO.
Greenman-Pedersen
80 Wolf Road
TRAFFIC IMPACT STUDY
2018088.00
TRIP ASSIGNMENT
TRIP DISTRIBUTION &
25%
25%
NOTE:
WOODLAWN AVE
+3 (+7)
NOTE:DIVISION ST. PARKING
TO PROJECT
+1 (+3)
+1 (+3)
1155PARKING
TO PROJECT
5JUNE 2018
SARATOGA SPRINGS, NY 12866
MIXED-USE DEVELOPMENT
385 BROADWAY
(PEDESTRIANS)26819(114)WOODLAWN AVE
(PEDESTRIANS)
PM PEAK HOUR VOLUMES
AM PEAK HOUR VOLUMES
26
88
37
(27)
(86)(91)(58)
(138)
WOODLAWN AVE
DIVISION ST. PARKING
TO PROJECT DIVISION ST. N
N
CONSULTING ENGINEERS
GPI
Albany, NY 12205
Suite 300 FIGURE NO.DATE:
NO SCALE
SCALE:JOB NO.
Greenman-Pedersen
80 Wolf Road
TRAFFIC IMPACT STUDY
2018088.00
PEAK HOUR TRAFFIC VOLUMES
BUILD CONDITION13767377033
122
55
11
164
29
NOTE:
15
88
27
NOTE:
385 Broadway Mixed-Use Development
Traffic Impact Study 10
July 2018
V. OPERATING CONDITIONS
A. CAPACITY ANALYSIS DESCRIPTION
The operating conditions of transportation facilities are evaluated based on the relationship of
existing or projected traffic volumes to the theoretical capacity of the highway facility. Various
factors affect capacity including traffic volume, travel speed, roadway geometry, grade, number
and width of travel lanes and intersection control. The current standards for evaluating capacity
and operating conditions are contained in the Highway Capacity Manual (HCM 2010), published
by the Transportation Research Board. The procedures describe operating conditions in terms of
Level of Service (LOS). In general, "A" represents the best operating condition with unrestricted
flow and little or no delay per vehicle, and "F" represents the worst, with congested conditions,
long delays and poor traffic operations. LOS C or better is generally desirable, but LOS D for
signalized locations and LOS E for unsignalized are generally acceptable during peak periods as
long as the volume to capacity ratio (v/c) is below 1.0.
Table 2 below presents the LOS criteria for both unsignalized intersections and for pedestrian
crossing movements.
TABLE 2
LEVEL OF SERVICE CRITERIA
LOS Unsignalized Intersection
Delay Per Vehicle (sec.)
Pedestrian LOS
Control Delay
(sec./pedestrian)
A < 10.0 < 5.0
B > 10.0 and < 15.0 > 5.0 and < 10.0
C >15.0 and <25.0 >10.0 and <20.0
D > 25.0 and < 35.0 > 20.0 and < 30.0
E > 35.0 and < 50.0 > 30.0 and < 45.0
F > 50.0 > 45.0
It should be noted that the LOS criteria for an unsignalized intersection is reported for the side
street approaches and mainline left turn movement only, as the uncontrolled through and right
turn movements along the mainline are assumed to have a theoretical delay of zero in the HCM
methodology. For the pedestrian level of service, LOS is reported for the uncontrolled crossings
only and assumes random pedestrian arrivals and an even directional and lane distribution. As
vehicles are required to stop for pedestrians when a stop sign is present, pedestrian crossings are
assumed to have a zero delay on stop-sign controlled approaches.
385 Broadway Mixed-Use Development
Traffic Impact Study 11
July 2018
B. RESULTS OF ANALYSIS
To determine the impact of the proposed development on the operations of the adjacent
transportation system, traffic operations were analyzed for the AM and PM peak hours under
both existing and Build conditions. The traffic operations within the study area for these
conditions are summarized in Table 3 and computation worksheets for each of the analyses are
provided in Appendix B.
TABLE 3
PEAK HOUR LEVEL OF SERVICE SUMMARY
Intersection
Approach
(Movement)
Existing Condition Build Condition
AM
Peak
Hour
PM Peak
Hour
AM Peak
Hour
PM Peak
Hour
Division Street and
Woodlawn Ave /
Site Access
Eastbound Left A (8.2) A (8.2) A (8.2) A (8.3)
Westbound Left A (7.8) A (7.9) A (7.7) A (7.8)
Northbound B
(13.3) C (16.2) B (13.3) C (16.5)
Southbound C
(15.5) C (21.9) C (15.7) C (22.4)
Pedestrians
(West Leg xwalk) A (4.1) B (5.9) A (4.1) B (5.9)
Note: X (XX.X) = Level of Service (delay in seconds per vehicle or pedestrian)
A summary of operations at the studied intersection is as follows:
Division Street and Woodlawn Ave / Site Entrance:
Under existing conditions, this two way stop-controlled intersection operates with the side street
approaches (Woodlawn Ave & Parking Access) both operating at LOS C or better in each of the
peak hours, and with left turns off Division Street operating at LOS A. This continues under the
Build condition (with the proposed development in place). The added traffic from the proposed
development does not cause a change in level of service. As such, no roadway or traffic control
improvements are necessary at this location to maintain acceptable vehicular traffic operations
with the new development.
For pedestrians, the HCM 2010 methodology shows the Division Street crossing at the west leg
of the intersection to operate at LOS A in the morning and LOS B in the evening peak hour for
both the existing and Build conditions. Again, no change in level of service for pedestrians is
expected. It should be noted in the Build condition analysis that all pedestrians crossing Division
Street were assumed to cross only at the west leg crosswalk, even though existing traffic counts
show several illegal crossings both diagonally and across the east leg that has no crosswalk. This
was done to determine the worst-case pedestrian level of service if all people followed the rules
of the road. However, comparing the pedestrian level of service of the existing condition
385 Broadway Mixed-Use Development
Traffic Impact Study 12
July 2018
analysis, which included the illegal movements, and the build analysis, which forced and
assumed legal movements, the expected pedestrian delay remains the same.
Based on a strict interpretation of the HCM pedestrian analysis results, a second Division Street
pedestrian crossing is not required at this location to maintain acceptable pedestrian levels of
service. However, the significant number of illegal crossings does indicate that pedestrian
improvements should be considered to better direct pedestrians and help focus them to safer
crossing locations. Though not required for acceptable operations, a second Division Street
Crosswalk on the east leg of the intersection should be considered as an optional improvement.
By adding this crosswalk, any pedestrians crossing the east leg of the intersection would have a
more highlighted and safer crossing. In addition, this new crossing that goes directly to the
corner where the parking garage is located may help reduce the diagonal crossing pedestrians,
which are the most problematic at this intersection. Figure 6 below shows a concept sketch of the
optional improvement suggested. This improvement could be made with or without the bulbout
option depending on City desires and drainage requirements.
Figure 6 – Optional Improvements Sketch
385 Broadway Mixed-Use Development
Traffic Impact Study 13
July 2018
VI. FINDINGS AND RECOMMENDATIONS
This study includes an evaluation of the potential traffic impacts caused by the addition of a
mixed-use commercial/residential development at 385 Broadway in the City of Saratoga Springs,
New York. The development is anticipated to consist of 72 rental units, and a first floor
commercial space totaling 8,533 sf. (only 2397 sf that would be new). Findings and
recommendations derived from the analysis include the following:
➢ It is estimated that the proposed development will generate 18 new AM peak hour trips (5
entering & 13 exiting) and 20 new PM peak hour trips (13 entering & 7 exiting), based on
information from ITE’s Trip Generation Manual, 10th Edition and other resources.
➢ Level of service analyses were performed at the intersection of Division Street and
Woodlawn Ave / Site Access. These analyses showed that the traffic added due to the
new development produces no change in level of service under build conditions and an
acceptable level of service is maintained in both the AM and PM peak hour with the
development in place.
➢ Field observations noted that there were pedestrians crossing the study area intersection
where there was no defined crosswalk. Adding a second crosswalk on Division Street,
across the east leg on the intersection would help alleviate these illegal pedestrian
crossing maneuvers. This improvement could be made with or without bulbouts to
shorten the crossing distance.
Overall, the analysis indicates that the proposed multi-use development could be added to the
area with parking lot access to Division Street with minimal traffic impacts. The existing
roadway and adjacent intersection can accommodate the proposed development traffic with
no change in geometrics or traffic control being necessary.
385 Broadway Mixed-Use Development
Traffic Impact Study 14
July 2018
APPENDIX A
TRAFFIC COUNT DATA
File Name : Division Street at Woodlawn Ave - AM Peak 0700-0900
Site Code : 2018088
Start Date : 5/31/2018
Page No : 1
Groups Printed- Cars - Trucks
Woodlawn Ave
From North
Division Street
From East
Parking Lot
From South
Division Street
From West
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:00 AM 4 0 4 6 14 2 14 5 0 21 1 0 0 3 4 4 22 3 4 33 72
07:15 AM 2 0 6 8 16 1 14 5 0 20 0 0 0 3 3 4 35 2 8 49 88
07:30 AM 5 1 5 13 24 2 11 8 0 21 3 0 3 5 11 5 26 1 11 43 99
07:45 AM 6 0 4 11 21 2 23 12 2 39 1 0 2 6 9 10 41 1 10 62 131
Total 17 1 19 38 75 7 62 30 2 101 5 0 5 17 27 23 124 7 33 187 390
08:00 AM 4 0 2 15 21 3 20 9 0 32 0 0 1 4 5 12 30 3 16 61 119
08:15 AM 2 1 0 21 24 7 14 12 0 33 1 1 0 3 5 8 29 8 15 60 122
08:30 AM 3 2 2 17 24 6 18 11 1 36 1 1 2 11 15 18 25 6 23 72 147
08:45 AM 4 3 2 21 30 7 36 5 0 48 0 0 1 8 9 17 38 15 25 95 182
Total 13 6 6 74 99 23 88 37 1 149 2 2 4 26 34 55 122 32 79 288 570
Grand Total 30 7 25 112 174 30 150 67 3 250 7 2 9 43 61 78 246 39 112 475 960
Apprch %17.2 4 14.4 64.4 12 60 26.8 1.2 11.5 3.3 14.8 70.5 16.4 51.8 8.2 23.6
Total %3.1 0.7 2.6 11.7 18.1 3.1 15.6 7 0.3 26 0.7 0.2 0.9 4.5 6.4 8.1 25.6 4.1 11.7 49.5
Cars 29 7 24 110 170 30 146 66 3 245 7 2 8 42 59 77 233 39 111 460 934
% Cars 96.7 100 96 98.2 97.7 100 97.3 98.5 100 98 100 100 88.9 97.7 96.7 98.7 94.7 100 99.1 96.8 97.3
Trucks 1 0 1 2 4 0 4 1 0 5 0 0 1 1 2 1 13 0 1 15 26
% Trucks 3.3 0 4 1.8 2.3 0 2.7 1.5 0 2 0 0 11.1 2.3 3.3 1.3 5.3 0 0.9 3.2 2.7
Woodlawn Ave
From North
Division Street
From East
Parking Lot
From South
Division Street
From West
Start Time Left Thru Right Peds App. Total Thru Right Peds App. Total Thru Right Peds App. Total Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 4 0 2 15 21 3 20 9 0 32 0 0 1 4 5 12 30 3 16 61 119
08:15 AM 2 1 0 21 24 7 14 12 0 33 1 1 0 3 5 8 29 8 15 60 122
08:30 AM 3 2 2 17 24 6 18 11 1 36 1 1 2 11 15 18 25 6 23 72 147
08:45 AM 4 3 2 21 30 7 36 5 0 48 0 0 1 8 9 17 38 15 25 95 182
Total Volume 13 6 6 74 99 23 88 37 1 149 2 2 4 26 34 55 122 32 79 288 570
% App. Total 13.1 6.1 6.1 74.7 15.4 59.1 24.8 0.7 5.9 5.9 11.8 76.5 19.1 42.4 11.1 27.4
PHF .813 .500 .750 .881 .825 .821 .611 .771 .250 .776 .500 .500 .500 .591 .567 .764 .803 .533 .790 .758 .783
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 300
Albany, NY 12205
518.453.9431
Left Left Left
File Name : Division Street at Woodlawn Ave - PM Peak 1600-1800
Site Code : 201088
Start Date : 5/31/2018
Page No : 1
Groups Printed- Cars - Trucks
Woodlawn Ave
From North
Division Street
From East
Parking Lot
From South
Division Street
From West
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
04:00 PM 15 1 22 30 68 0 27 5 3 35 4 0 5 4 13 10 37 6 24 77 193
04:15 PM 9 3 10 18 40 3 12 7 3 25 4 1 4 9 18 10 37 5 11 63 146
04:30 PM 22 1 18 23 64 2 24 9 1 36 4 1 6 7 18 4 37 1 15 57 175
04:45 PM 14 1 10 20 45 2 20 7 4 33 2 2 4 7 15 8 51 4 21 84 177
Total 60 6 60 91 217 7 83 28 11 129 14 4 19 27 64 32 162 16 71 281 691
05:00 PM 23 1 24 36 84 2 26 4 2 34 6 2 8 18 34 9 52 2 26 89 241
05:15 PM 14 1 18 27 60 2 18 7 1 28 5 1 5 18 29 8 24 1 20 53 170
05:30 PM 10 0 8 26 44 2 26 7 2 37 3 0 3 18 24 5 26 1 17 49 154
05:45 PM 14 0 22 18 54 9 17 5 0 31 5 2 4 32 43 7 28 5 13 53 181
Total 61 2 72 107 242 15 87 23 5 130 19 5 20 86 130 29 130 9 76 244 746
Grand Total 121 8 132 198 459 22 170 51 16 259 33 9 39 113 194 61 292 25 147 525 1437
Apprch %26.4 1.7 28.8 43.1 8.5 65.6 19.7 6.2 17 4.6 20.1 58.2 11.6 55.6 4.8 28
Total %8.4 0.6 9.2 13.8 31.9 1.5 11.8 3.5 1.1 18 2.3 0.6 2.7 7.9 13.5 4.2 20.3 1.7 10.2 36.5
Cars 121 8 132 194 455 22 170 51 16 259 33 9 39 106 187 61 291 25 147 524 1425
% Cars 100 100 100 98 99.1 100 100 100 100 100 100 100 100 93.8 96.4 100 99.7 100 100 99.8 99.2
Trucks 0 0 0 4 4 0 0 0 0 0 0 0 0 7 7 0 1 0 0 1 12
% Trucks 0 0 0 2 0.9 0 0 0 0 0 0 0 0 6.2 3.6 0 0.3 0 0 0.2 0.8
Woodlawn Ave
From North
Division Street
From East
Parking Lot
From South
Division Street
From West
Start Time Left Thru Right Peds App. Total Thru Right Peds App. Total Thru Right Peds App. Total Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 22 1 18 23 64 2 24 9 1 36 4 1 6 7 18 4 37 1 15 57 175
04:45 PM 14 1 10 20 45 2 20 7 4 33 2 2 4 7 15 8 51 4 21 84 177
05:00 PM 23 1 24 36 84 2 26 4 2 34 6 2 8 18 34 9 52 2 26 89 241
05:15 PM 14 1 18 27 60 2 18 7 1 28 5 1 5 18 29 8 24 1 20 53 170
Total Volume 73 4 70 106 253 8 88 27 8 131 17 6 23 50 96 29 164 8 82 283 763
% App. Total 28.9 1.6 27.7 41.9 6.1 67.2 20.6 6.1 17.7 6.2 24 52.1 10.2 58 2.8 29
PHF .793 1.00 .729 .736 .753 1.00 .846 .750 .500 .910 .708 .750 .719 .694 .706 .806 .788 .500 .788 .795 .791
Greenman-Pedersen, Inc.
80 Wolf Road, Suite 300
Albany, NY 12205
518.453.9431
Left Left Left
Page 1 of 2
Excerpt below is from the Traffic Impact Study conducted for the Plaza Residential Mixed-Use
Development, 330 4th Street, Kirkland, WA, prepared by Transportation Solutions, Inc., February 2017
Trip Generation
Micro-Apartment Land Use; Arête Trip Generation
Trip generation for the proposed micro-apartment use was forecast using existing vehicle trip
generation information collected at the neighboring Arête site. Kirkland staff approved the scope of
the data collection and methodology.
Arête, located adjacent to the Project, includes 228 micro-apartments (also known as residential
suites), 62 apartment units and 8,500 square feet of commercial space. A post-occupancy resident
and visitor vehicle trip generation study was documented in August 2016 for Arête as a basis to
compute the Arête’s traffic impact fees and a follow-up analysis was completed in January 2017 to
forecast trip generation for the Project’s micro-apartments.
Vehicle trips in and out of Arête were collected by Traffic Count Consultants, Inc. from Tuesday to
Thursday (August 2-August 4, 2016) between 4 and 6 PM, from Tuesday to Thursday (January 24-
January 26, 2017) between 7 and 9 AM, and on Wednesday, January 25, 2017 between 4 and 6 PM.
In August 2016 vehicle trips were collected at Arête’s lower-garage off 4th Ave. For the January 2017
counts, vehicle trips were collected at Arête’s lower-garage and upper-garage off Central Way. The
site’s upper-garage, off Central Way, was not open during the August 2016 data collection.
Arête’s tenants are required to sign an affidavit to register their vehicle(s) and are required to park on
site. Vehicles are issued either a “blue” sticker, for resident tenants, or a “green” sticker, for
commercial employees, to place on their vehicle(s). Tenant parking for both residents and commercial
employees is in the lower-garage. The upper-garage is for commercial visitors. The Applicant manages
their onsite parking by: providing tenants ORCA cards, outsourcing with Diamond Parking to identify
parking violations in the neighborhood, and issuing citations for tenant parking violations.
Visitor trips (vehicles with no sticker) vary from day to day. Visitor trips are included with the
total resident trip generation data summarized in Table 1. Visitors trips were not tracked to
determine whether they were a resident-visitor or commercial-visitor.
Table 1: Trip Generation Study; Summary of Data
Collection
Count Date 8/2/2016 8/3/2016 8/4/2016 1/24/2017 1/25/2017 1/26/2017
AM Peak Trips - - - 40 39 36
Occupancy2 - - - 95.5% 95.5% 95.5%
AM Average3 - 37
PM Peak Trips 33 38 29 - 36 -
Occupancy2 92.4% 92.4% 92.4% - 95.5% -
PM Average3 33 36
1. Resident trips plus Visitor trips
2. Resident unit (apartments and micro-apartments) occupancy at the time of the study, from Arête Management
3. 3-day average AM and PM peak hour trips
Page 2 of 2
Table 2 summarizes methodology used to forecast trip rate for the micro-apartment land use.
Micro- apartments generate: 0.14 AM peak hour trips per unit and 0.13 PM peak hour trips per unit.
Table 2: Residential Suite Land Use Trip Rate
Total
Units
2016
Occupied
Units1
2016
Trip
Count2,3
Trip Adjust.
for Unit
Occupancy4
2017
Occupied
Units1
2017
Trip
Count2,3
Trip Adjust.
for Unit
Occupancy4
Total 290 272 37 40
Apartments 62 52 7 8
Resident Suite 228 220 30 31
Resident Suite AM Trip Rate5 0.14
Total 290 268 33 36 272 36 38
Apartments 62 55 7 8 52 7 8
Resident Suite 228 213 26 28 220 29 30
Resident Suite PM Trip Rate5 0.12 0.13
1. Resident unit occupancies provided by Arête Management
2. Peak hour vehicle trip data from Table 2. AM data was not collected in the 2016.
3. Trips assigned to the apartment and micro-apartment uses based on the ratio of occupied units.
4. Trips adjusted for full occupancy of the site
5. (Micro-Apartment adjusted trips) ÷ (228 total residential units)
The daily rate for micro-apartments is based on the average ratios of (ITE) daily low-rise apartment
trip rate to (ITE) AM Low-Rise Apartment trip rate multiplied by the AM micro-apartment trip rate
and (ITE) daily low-rise apartment trip rate to (ITE) PM Low-Rise Apartment trip rate multiplied by
the PM micro- apartment trip rate and. The daily micro-apartment trip rate is forecast as 1.74 daily
trips per unit (= ((6.59 ÷ 0.46 x 0.14) + (6.59 ÷ 0.58 x 0.13)) ÷ 2).
385 Broadway Mixed-Use Development
Traffic Impact Study 15
July 2018
APPENDIX B
CAPACITY ANALYSIS WORKSHEETS
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Exising AM Peak
385 Broadway Traffic Study Synchro 9 Report
GPI Page 1
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 55 122 32 23 88 37 2 2 4 13 6 6
Future Vol, veh/h 55 122 32 23 88 37 2 2 4 13 6 6
Conflicting Peds, #/hr 74 0 37 26 0 85 90 0 1 12 0 79
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 1 511321111314
Mvmt Flow 70 154 41 29 111 47 3 3 5 16 8 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 243 0 0 232 0 0 642 652 224 608 649 310
Stage 1 ------351351-278278-
Stage 2 ------291301-330371-
Critical Hdwy 4.11 - - 4.11 - - 7.11 6.51 6.31 7.13 6.51 6.24
Critical Hdwy Stg 1 ------6.11 5.51 - 6.13 5.51 -
Critical Hdwy Stg 2 ------6.11 5.51 - 6.13 5.51 -
Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.009 3.399 3.527 4.009 3.336
Pot Cap-1 Maneuver 1329 - - 1342 - - 388 388 794 406 390 725
Stage 1 ------668634-726682-
Stage 2 ------719667-681621-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1206 - - 1325 - - 308 317 759 342 319 609
Mov Cap-2 Maneuver ------308317-342319-
Stage 1 ------604574-628616-
Stage 2 ------621603-622562-
Approach EB WB NB SB
HCM Control Delay, s 2.1 1.2 13.3 15.5
HCM LOS B C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 443 1206 - - 1325 - - 375
HCM Lane V/C Ratio 0.023 0.058 - - 0.022 - - 0.084
HCM Control Delay (s) 13.3 8.2 0 - 7.8 0 - 15.5
HCM Lane LOS B A A - A A - C
HCM 95th %tile Q(veh) 0.1 0.2 - - 0.1 - - 0.3
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Exising AM Peak
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
Approach
Approach Direction EB
Median Present? No
Approach Delay(s) 4.1
Level of Service A
Crosswalk
Length (ft) 38
Lanes Crossed 2
Veh Vol Crossed 210
Ped Vol Crossed 90
Yield Rate(%) 25
Ped Platooning No
Critical Headway (s) 13.86
Prob of Delayed X-ing 0.55
Prob of Blocked Lane 0.33
Delay for adq Gap 13.48
Avg Ped Delay (s) 4.14
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 4.1
Level of Service A
Crosswalk
Length (ft) 38
Lanes Crossed 2
Veh Vol Crossed 210
Ped Vol Crossed 1
Yield Rate(%) 10
Ped Platooning No
Critical Headway (s) 13.86
Prob of Delayed X-ing 0.55
Prob of Blocked Lane 0.33
Delay for adq Gap 13.48
Avg Ped Delay (s) 4.14
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Existing PM Peak
385 Broadway Traffic Study Synchro 9 Report
GPI Page 1
Intersection
Int Delay, s/veh 8.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 29 164 8 8 88 27 17 6 23 73 4 70
Future Vol, veh/h 29 164 8 8 88 27 17 6 23 73 4 70
Conflicting Peds, #/hr 106 0 74 50 0 130 106 0 8 32 0 82
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 1 11111111111
Mvmt Flow 36 205 10 10 110 34 21 8 29 91 5 88
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 274 0 0 289 0 0 656 651 316 610 639 363
Stage 1 ------357357-277277-
Stage 2 ------299294-333362-
Critical Hdwy 4.11 - - 4.11 - - 7.11 6.51 6.21 7.11 6.51 6.21
Critical Hdwy Stg 1 ------6.11 5.51 - 6.11 5.51 -
Critical Hdwy Stg 2 ------6.11 5.51 - 6.11 5.51 -
Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.009 3.309 3.509 4.009 3.309
Pot Cap-1 Maneuver 1295 - - 1279 - - 380 389 727 408 395 684
Stage 1 ------663630-732683-
Stage 2 ------712671-683627-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1153 - - 1237 - - 253 308 658 317 313 540
Mov Cap-2 Maneuver ------253308-317313-
Stage 1 ------598568-626600-
Stage 2 ------522589-601565-
Approach EB WB NB SB
HCM Control Delay, s 1.2 0.5 16.2 21.9
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 378 1153 - - 1237 - - 394
HCM Lane V/C Ratio 0.152 0.031 - - 0.008 - - 0.466
HCM Control Delay (s) 16.2 8.2 0 - 7.9 0 - 21.9
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.5 0.1 - - 0 - - 2.4
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street 2018 Existing PM Peak
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
Approach
Approach Direction EB
Median Present? No
Approach Delay(s) 5.9
Level of Service B
Crosswalk
Length (ft) 38
Lanes Crossed 2
Veh Vol Crossed 252
Ped Vol Crossed 106
Yield Rate(%) 25
Ped Platooning No
Critical Headway (s) 13.86
Prob of Delayed X-ing 0.62
Prob of Blocked Lane 0.38
Delay for adq Gap 15.37
Avg Ped Delay (s) 5.92
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 5.9
Level of Service B
Crosswalk
Length (ft) 38
Lanes Crossed 2
Veh Vol Crossed 252
Ped Vol Crossed 8
Yield Rate(%) 10
Ped Platooning No
Critical Headway (s) 13.86
Prob of Delayed X-ing 0.62
Prob of Blocked Lane 0.38
Delay for adq Gap 15.37
Avg Ped Delay (s) 5.92
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition AM Peak
385 Broadway Traffic Study Synchro 9 Report
GPI Page 1
Intersection
Int Delay, s/veh 3.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 55 122 33 26 88 37 5 5 11 13 7 6
Future Vol, veh/h 55 122 33 26 88 37 5 5 11 13 7 6
Conflicting Peds, #/hr 86 0 27 27 0 86 91 000091
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 79 79 79 79 79 79 79 79 79 79 79 79
Heavy Vehicles, % 1 511321111314
Mvmt Flow 70 154 42 33 111 47 6 6 14 16 9 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 244 0 0 223 0 0 642 652 202 612 649 312
Stage 1 ------342342-287287-
Stage 2 ------300310-325362-
Critical Hdwy 4.11 - - 4.11 - - 7.11 6.51 6.31 7.13 6.51 6.24
Critical Hdwy Stg 1 ------6.11 5.51 - 6.13 5.51 -
Critical Hdwy Stg 2 ------6.11 5.51 - 6.13 5.51 -
Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.009 3.399 3.527 4.009 3.336
Pot Cap-1 Maneuver 1328 - - 1352 - - 388 388 816 404 390 724
Stage 1 ------675640-718676-
Stage 2 ------711661-685627-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1203 - - 1352 - - 309 318 797 336 320 607
Mov Cap-2 Maneuver ------309318-336320-
Stage 1 ------616584-620608-
Stage 2 ------610595-622572-
Approach EB WB NB SB
HCM Control Delay, s 2.1 1.3 13.3 15.7
HCM LOS B C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 459 1203 - - 1352 - - 369
HCM Lane V/C Ratio 0.058 0.058 - - 0.024 - - 0.089
HCM Control Delay (s) 13.3 8.2 0 - 7.7 0 - 15.7
HCM Lane LOS B A A - A A - C
HCM 95th %tile Q(veh) 0.2 0.2 - - 0.1 - - 0.3
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition AM Peak
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
Approach
Approach Direction EB
Median Present? No
Approach Delay(s) 4.1
Level of Service A
Crosswalk
Length (ft) 38
Lanes Crossed 2
Veh Vol Crossed 210
Ped Vol Crossed 91
Yield Rate(%) 25
Ped Platooning No
Critical Headway (s) 13.86
Prob of Delayed X-ing 0.55
Prob of Blocked Lane 0.33
Delay for adq Gap 13.48
Avg Ped Delay (s) 4.14
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 0.0
Level of Service A
Crosswalk
Length (ft) 0
Lanes Crossed 2
Veh Vol Crossed 210
Ped Vol Crossed 0
Yield Rate(%) 10
Ped Platooning No
Critical Headway (s) 0.00
Prob of Delayed X-ing 0.00
Prob of Blocked Lane 0.00
Delay for adq Gap 0.00
Avg Ped Delay (s) 0.00
HCM 2010 TWSC
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition PM Peak Hour
385 Broadway Traffic Study Synchro 9 Report
GPI Page 1
Intersection
Int Delay, s/veh 8.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 29 164 11 15 88 27 19 8 26 73 7 70
Future Vol, veh/h 29 164 11 15 88 27 19 8 26 73 7 70
Conflicting Peds, #/hr 138 0 58 58 0 138 114 0000114
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length ------------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 80 80 80 80 80 80 80 80 80 80 80 80
Heavy Vehicles, % 1 11111111111
Mvmt Flow 36 205 14 19 110 34 24 10 33 91 9 88
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 282 0 0 277 0 0 669 661 270 608 651 379
Stage 1 ------342342-302302-
Stage 2 ------327319-306349-
Critical Hdwy 4.11 - - 4.11 - - 7.11 6.51 6.21 7.11 6.51 6.21
Critical Hdwy Stg 1 ------6.11 5.51 - 6.11 5.51 -
Critical Hdwy Stg 2 ------6.11 5.51 - 6.11 5.51 -
Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.009 3.309 3.509 4.009 3.309
Pot Cap-1 Maneuver 1286 - - 1292 - - 373 384 771 409 389 670
Stage 1 ------675640-709666-
Stage 2 ------688655-706635-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1135 - - 1292 - - 244 304 732 322 308 520
Mov Cap-2 Maneuver ------244304-322308-
Stage 1 ------618586-601576-
Stage 2 ------489567-639581-
Approach EB WB NB SB
HCM Control Delay, s 1.2 0.9 16.5 22.4
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1
Capacity (veh/h) 379 1135 - - 1292 - - 391
HCM Lane V/C Ratio 0.175 0.032 - - 0.015 - - 0.48
HCM Control Delay (s) 16.5 8.3 0 - 7.8 0 - 22.4
HCM Lane LOS C A A - A A - C
HCM 95th %tile Q(veh) 0.6 0.1 - - 0 - - 2.5
HCM 2010 TWSC-Pedestrians
3: Site Access / Parking Lot/Woodlawn Ave & Division Street Build Condition PM Peak Hour
385 Broadway Traffic Study Synchro 9 Report
GPI Page 2
Approach
Approach Direction EB
Median Present? No
Approach Delay(s) 5.9
Level of Service B
Crosswalk
Length (ft) 38
Lanes Crossed 2
Veh Vol Crossed 252
Ped Vol Crossed 114
Yield Rate(%) 25
Ped Platooning No
Critical Headway (s) 13.86
Prob of Delayed X-ing 0.62
Prob of Blocked Lane 0.38
Delay for adq Gap 15.37
Avg Ped Delay (s) 5.92
Approach
Approach Direction WB
Median Present? No
Approach Delay(s) 0.0
Level of Service A
Crosswalk
Length (ft) 0
Lanes Crossed 2
Veh Vol Crossed 252
Ped Vol Crossed 0
Yield Rate(%) 10
Ped Platooning No
Critical Headway (s) 0.00
Prob of Delayed X-ing 0.00
Prob of Blocked Lane 0.00
Delay for adq Gap 0.00
Avg Ped Delay (s) 0.00