Loading...
HomeMy WebLinkAbout20200574 Excelsior Park SUP Chazen comments 6-11-20 THE NORTH COUNTRY OFFICE Chan civiEnneers20 — Planners Glens Falls, NY 12801 COMPANIES' Environmental&Safety Professionals P: 518.812.0513 or 888.539.9073 Landscape Architects Proud to be Employee Owned Transportation Planners&Engineers www.chazencompanies.com June 11, 2020 Bradley Birge Administrator of Planning & Economic Development City of Saratoga Springs 474 Broadway Saratoga Springs, NY 12866 Re: City Designated Planning Services for Excelsior Park SEQR Review 264 Excelsior Avenue, City of Saratoga Springs,Saratoga County, New York Chazen Project#31904.01 City Project#18.056 Dear Mr. Birge: The Chazen Companies (Chazen) have completed our review of the following materials received: • Response to Comments, prepared by The LA Group, dated May 18, 2020. Following are our observations/comments as they relate to the Traffic section (Chazen's comments 13 through 19, dated February 26, 2019): 1. Comments 14, 15, and 17 have been adequately addressed. 2. The response to Comment 18 references a revised Transportation Study but the response does not identify what the Transportation Study evaluates nor does it present findings to address the entire comment. 3. The remaining responses to Comments 13, 16,and 19 do not adequately address the comments but identify the need to set-up a meeting with City staff to determine the applicability of the original mitigation requirements and what adjustments may be required. To address the potential impacts of the current application, the original traffic impact study should be updated and should include the following: a. Adjustments to the base and background conditions.The original study was completed in 2002 and the project was to be fully completed by 2012. The current application is to complete the project by 2028, more than 25 years since the study completion. Base conditions should be updated to reflect current (2020) conditions and future background conditions should be updated to reflect current growth projections and nearby planned developments. b. Descriptions of the proposed uses and sizes and identification of non-conformance, if any,to the Special Use Permit allowances. c. Trip generation estimates of the current application with comparison to the original study and an update of the overall project's "trip generation" account. New York: Hudson Valley• Capital District• North Country• Westchester Tennessee: Nashville• Chattanooga Oregon: Portland Chazen Engineering, Land Surveying& Landscape Architecture Co. DPC(NY) • Chazen Engineering Consultants, LLC(TN/OR) City Designated Planning Services for Excelsior Park SEQR Review June 11,2020 Page 2 of 2 d. Capacity analyses of the full build-out condition and any interim build phases.Analyses to be conducted for the study's original intersections and to expand the study area if warranted by the updated trip generation estimates following City and industry guidelines. e. Identification/confirmation of mitigation measures required and implementation schedule. We are available to meet with the City and the applicant to further discuss the traffic study update needs. Please let us know if you have any questions. Sincerely, Norabelle Greenberger'- Planner reenbergerPlanner cc: Chris Round, AICP Z:\projects\31900-31999\31904-XX_Saratoga Springs\31904.01-Excelsior Park SEQRA Mods PB#17.074\Correspondence\2nd submittal\SENT\31904-01_SEQR Review summary 2_20200611.docx