HomeMy WebLinkAbout20200574 Excelsior Park SUP EAF Full Environmentnl Assessment Form
Pnrt 1 -Project nn�l Setting
Instructions for Completing Part 1
Part 1 is to be completed by the applicant or project sponsor. Responses become part of the application for approval or funding,
are subject to public review, and may be subject to further verification.
Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to
any item,please answer as thoroughly as possible based on current information;indicate whether missing information does not exist,
or is not reasonably available to the sponsor;and,when possible,generally describe work or studies which would be necessary to
update or fully develop that information.
Applicants/sponsors must complete all items in Sections A&B. In Sections C,D&E,most items contain an initial question that
must be answered either"Yes"or"No". If the answer to the initial question is "Yes", complete the sub-questions that follow. If the
answer to the initial question is "No",proceed to the next question. Section F allows the proj ect sponsor to identify and attach any
additional information. Section G requires the name and signature of the proj ect sponsor to verify that the information contained in
Part lis accurate and complete.
A.Project and Sponsor Information.
Name of Action or Project:
Excelsior Park
Proj ect Location(describe, and attach a general location map):
Excelsior Avenue&Ormandy Lane,Saratoga Springs
Brief Description of Proposed Action(include purpose or need):
The proposed action involves securing a Special Use Permit for 34.72 acres of land on Excelsior Avenue and Ormandy Lane.The project includes a mix of
residential and commercial uses.
Name of Applicant/Sponsor: Telephone:51s.5s�.4��3
Excelsior Park,LLC E-Mall: .
�witt@wittconstruciton.com
Addl'ess:563 N Broadway
City/PO:Sarato a S rin s State: Zip Code:
9 P 9 New York 12866
Proj ect Contact(if not same as sponsor;give name and title/role): Telephone:51 s.5s�.4��3
John Witt, President E-Mall:•
�witt@wittconstruciton.com
Address:
563 N Broadway
City/PO: State: Zip Code:
Saratoga Springs New York 12866
Property Owner (if not same as sponsor): Telephone:
Same E-Mail:
Address:
City/PO: State: Zip Code:
Page 1 of 13
B.Government Approvals
B.Government Approvals,Funding,or Sponsorship. ("Funding"includes grants,loans,taY relief, and any other forms of financial
assistance.)
Government Entity If Yes: Identify Agency and Approval(s) Application Date
Required (Actual or projected)
a. City Council,Town Board, ❑Yes�No
or Village Board of Trustees
b. Clty,TOwn Or V1113ge �Yes❑NO City of Saratoga Springs Planning Board October 5,2017
Planning Board or Commission
c. City Council, Town or ❑Yes�No
Village Zoning Board of Appeals
d. Other local agencies ❑Yes�No
e.COunty 3genCles �Yes❑NO Saratoga County Planning,Advisory Opinion
£Regional agencies ❑Yes�No
g. State agencies ❑Yes�No
h.Federal agencies ❑Yes�No
i. Coastal Resources.
i. Is the project site witl�in a Coastal Area,or the waterfront area of a Designated Inland Waterway? ❑Yes mNo
ii. Is the proj ect site located in a community with an approved Local Waterfront Revitalization Program? ❑YesmNo
iii. Is the project site witliin a Coastal Erosion Hazard Area? ❑YesmNo
C.Planning and Zoning
C1.Planning and zoning actions.
Will administrative or legislative adoption,or amendment of a plan,local law,ordinance,rule or regulation be the ❑Yes mNo
only approval(s)which must be granted to enable the proposed action to proceed?
• If Yes, complete sections C,F and G.
• If No,proceed to question C2 and complete all remaining sections and questions in Part 1
C.2.Adopted land use plans.
a.Do any municipally-adopted (city,town,village or county) comprehensive land use plan(s)include the site �Yes❑No
where the proposed action would be located?
If Yes, does the comprehensive plan include specific recommendations for the site where the proposed action �Yes❑No
would be located?
b.Is the site of the proposed action witl�in any local or regional special planning district(for example: Greenway mYes❑No
Brownfield Opporiunity Area(BOA); designated State or Federal heritage area;watershed management plan;
or other?)
If Yes,identify the plan(s):
NYS Heritage Areas: Mohawk Valley Heritage Corridor,Saratoga
c. Is the proposed action located wholly or parkially witl�in an area listed in an adopted municipal open space plan, mYes❑No
or an adopted municipal farmland protection plan?
If Yes,identify the plan(s):
Comprehensive Plan Country Overlay
Page 2 of 13
C.3. Zoning
a. Is the site of the proposed action located in a municipality with an adopted zoning law or ordinance. m Yes❑No
If Yes,what is the zoning classification(s)including any applicable overlay district?
T-5,Transect-5;T-4,Transect-4.
Comprehensive Plan Country Overlay
b. Is the use permitted or allowed by a special or conditional use permit? m Yes❑No
c.Is a zoning change requested as part of the proposed action? ❑Yes�No
If Yes,
i. What is the proposed new zoning for the site?
C.4.Exisfing community services.
a.In what school district is the project site located? saratoga springs
b.What police or other public protection forces serve the project site?
City of Saratoga Springs Police
c.Which fire protection and emergency medical services serve the project site?
City of Saratoga Springs Fire Department
d.What parks serve the proj ect site?
Sprinq Run Trail boarders the site.A connection to the trail exists from Ormandy Lane.
D.Project Details
D1.Proposed and Potential Development
a.What is the general nature of the proposed action(e.g.,residential,industrial, commercial,recreational;if miYed,include all
components)? Residential, Commercial
b. a. Total acreage of the site of the proposed action? 34.�2 acres
b. Total acreage to be physically disturbed? s.� acres
c.Total acreage(project site and any contiguous properties)owned
or controlled by the applicant or proj ect sponsor? 3s.23 acres
c.Is the proposed action an expansion of an existing proj ect or use? ❑Yes�No
i. If Yes,what is the approximate percentage of the proposed expansion and identify the units (e.g., acres,miles,housing units,
square feet)? % Units:
d.Is the proposed action a subdivision,or does it include a subdivision? ❑Yes�No
If Yes,
i. Purpose or type of subdivision? (e.g.,residential,industrial,commercial;if mixed, specify types)
Commercial, Residential Subdivision
ii. Is a cluster/conservation layoutproposed? ❑Yes�No
iii. Number of lots proposed?
i>>. Minimum and maYimum proposed lot sizes? Minimum MaYimum
e.Will proposed action be constructed in multiple phases? �Yes❑No
i. If No, anticipated period of construction: months
ii. If Yes:
• Total number of phases anticipated 9
• Anticipated commencement date of phase 1 (including demolition) 6 month �o�$ year
• Anticipated completion date of final phase �� month 2o2syear
• Generally describe connections or relationships among phases,including any contingencies where progress of one phase may
determine timing or duration of future phases:
Each phase is distinct in proposed uses and density.The timinq of each phase will be dependant on market conditions.
Page 3 of 13
£Does the project include new residential uses? �Yes❑No
If Yes, show numbers of units proposed.
One Familv Two Familv Three Familv Multible Familv four or more
Initial Phas e o 0 0 3�
At completion
of all phases 46 32 o s5
g.Does the proposed action include new non-residential construction(including expansions)? �Yes❑No
If Yes,
i. Total number of structures 4
ii. Dimensions(in feet)of largest proposed structure: 50' height 250 width; and �so length
iii. Approximate extent of building space to be heated or cooled: �4s,2oo square feet
h.Does the proposed action include construction or other activities that will result in the impoundment of any ❑Yes�No
liquids, such as creation of a water supply,reservoir,pond,lake,waste lagoon or other storage?
If Yes,
i. Purpose of the impoundment
ii. If a water impoundment,the principal source of the water: ❑ Ground water❑Surface water streams ❑Other specify:
iii. If other than water,identify the type of impounded/contained liquids and their source.
i>>. Approximate size of the proposed impoundment. Volume: million gallons; surface area: acres
>>. Dimensions of the proposed dam or impounding structure: height length
>>i. Construction method/materials for the proposed dam or impounding structure(e.g., earth fill,rock,wood, concrete):
D.2. Project Operations
a.Does the proposed action include any excavation,mining,or dredging,during construction,operations,orboth? ❑Yes�No
(Not including general site preparation,grading or installation of utilities or foundations where all excavated
materials will remain onsite)
If Yes:
i.What is the purpose of the excavation or dredging?
ii. How much material(including rock, earth, sediments, etc.)is proposed to be removed from the site?
• Volume(specify tons or cubic yards):
• Over what duration of time?
iii. Describe nature and characteristics of materials to be excavated or dredged, and plans to use,manage or dispose of them.
i>>. Will there be onsite dewatering or processing of excavated materials? ❑Yes❑No
If yes,describe.
>>. What is the total area to be dredged or excavated? acres
>>i. What is the maYimum area to be worked at any one time? acres
>>ii. What would be the maYimum depth of excavation or dredging? feet
>>iii. Will the excavation require blasting? �Yes�No
ix. S11iin1iarize site reclamation goals and plan:
b.Would the proposed action cause or result in alteration of,increase or decrease in size of,or encroachment �Yes�No
into any existing wetland,waterbody, shoreline,beach or adjacent area?
If Yes:
i. Identify the wetland or waterbody which would be affected(by name,water index number,wetland map number or geographic
deSCnptlOn):The proposed action would result in an encroachment into the adjacent area for NYSDEC S-16 and this encroachment was previously
permitted by NYS DEC.
Page 4 of 13
ii. Describe how the proposed action would affect that waterbody or wetland, e.g. excavation, fill,placement of structures,or
alteration of channels,banks and shorelines. Indicate extent of activities,alterations and additions in square feet or acres:
Some fill and placement of structures would occur within the wetland adjacent area.
iii. Will proposed action cause or result in disturbance to bottom sediments? ❑Yes�No
If Yes, describe:
i>>. Will proposed action cause or result in the destruction or removal of aquatic vegetation? ❑Yes�No
If Yes:
• acres of aquaric vegetation proposed to be removed:
• expected acreage of aquatic vegetation remaining after proj ect completion:
• purpose of proposed removal(e.g.beach clearing,invasive species control,boat access):
• proposed method of plant removal:
• if chemical/herbicide treatment will be used, specify product(s):
>>. Describe any proposed reclamation/mitigation following disturbance:
c.Will the proposed action use,or create a new demand for water? mYes❑No
If Yes:
i. Total anticipated water usage/demand per day: + soA2o gallons/day
ii. Will the proposed action obtain water from an existing public water supply? mYes❑No
If Yes:
• Name of district or service area: saratoga springs
• Does the existing public water supply have capacity to serve the proposal? m Yes❑No
• Is the proj ect site in the existing district? m Yes❑No
• Is expansion of the district needed? ❑Yes�No
• Do existing lines serve the proj ect site? m Yes❑No
iii. Will line extension within an existing district be necessary to supply the project? mYes❑No
If Yes:
• Describe extensions or capacity expansions proposed to serve this project
A line will need to be extended further east along Ormandy Lane
• Source(s)of supply for the district �ouqhberrv�ake
i>>. Is a new water supply district or service area proposed to be formed to serve the proj ect site? ❑ Yes�No
If,Yes:
• Applicant/sponsor for new district
• Date application submitted or anticipated:
• Proposed source(s)of supply for new district
>>. If a public water supply will not be used,describe plans to provide water supply for the proj ect
>>i.If water supply will be from wells (public or private),maYimum pumping capacity: gallons/minute.
d.Will the proposed action generate liquid wastes? m Yes❑No
If Yes:
i. Total anticipated liquid waste generation per day: ± so,o2o gallons/day
ii. Nature of liquid wastes to be generated(e.g., sanitary wastewater,industrial;if combination, describe all components and
approximate volumes or proportions of each):
Sanitary waste from commercial and residential uses.
iii. Will the proposed action use any existing public wastewater treatment facilities? �Yes❑No
If Yes:
• N3me Of w3stew3ter tre3ttnent p13nt to be used: Saratoga County Waste Water Treatment Plant in Mechanicville, NY
• N3me Of d1StnCt: Saratoga County Sewer District#1
• Does the existing wastewater treatment plant have capacity to serve the proj ect? �Yes❑No
• Is the project site in the existing district? �Yes❑No
• Is expansion of the district needed? ❑Yes mNo
Page 5 of 13
• Do existing sewer lines serve the proj ect site? �Yes❑No
• Will line extension within an existing district be necessary to serve the proj ect? �Yes❑No
If Yes:
• Describe extensions or capacity expansions proposed to serve this project
Sanitary Mains will be laid west alonq Whistler Court, East alonq Ormandy Lane,and North from Ormandy Lane into Townhouse developments.A
force main will be required at the end of Whistler Court to back of commercial building on Excelsior Ave. Individual services provided to each townhouse.
i>>. Will a new wastewater(sewage)treatment district be formed to serve the proj ect site? ❑Yes�No
If Yes:
• Applicant/sponsor for new district
• Date application submitted or anticipated:
• What is the receiving water for the wastewater discharge?
>>. If public facilities will not be used, describe plans to provide wastewater treatment for the proj ect,including specifying proposed
receiving water(name and classification if surface discharge,or describe subsurface disposal plans):
>>i. Describe any plans or designs to capture,recycle or reuse liquid waste:
Not Aonlicahle
e.Will the proposed action disturb more than one acre and create stormwater runoff, either from new point �Yes❑No
sources (i.e. ditches,pipes,swales, curbs,gutters or other concentrated flows of stormwater)or non-point
source(i.e. sheet flow) during construction or post construction?
If Yes:
i. How much impervious surface will the proj ect create in relation to total size of project parcel?
Square feet or 6.�o acres(impervious surface)
Square feet or 3s.23 acres (parcel size)
ii. DeSCnbe types Of new pOlnt SOUI'Ces.Commercial,recreation, multi-family and townhouse buildings,sidewalks, roads&parking lots
iii. Where will the stormwater runoff be directed(i.e.on-site stormwater management facility/structures, adj acent properties,
groundwater,on-site surface water or off-site surface waters)?
On-site stormwater manaqement facilities via underqround stormwater chambers
• If to surface waters,identify receiving water bodies or wetlands:
• Will stormwaterrunoff flow to adjacentproperties? ❑Yes�No
i>>. Does proposed plan minimize impervious surfaces,use pervious materials or collect and re-use stormwater? �Yes❑No
£ Does the proposed action include,or will it use on-site,one or more sources of air emissions,including fuel ❑Yes�No
combustion,waste incineration,or other processes or operations?
If Yes,identify:
i.Mobile sources during project operations(e.g.,heavy equipment, fleet or delivery vehicles)
ii. Stationary sources during construction(e.g.,power generation, structural heating,batch plant, crushers)
iii. Stationary sources during operations(e.g.,process emissions,large boilers, electric generation)
g.Will any air emission sources named in D2.f(above),require a NY State Air Registration,Air Facility Permit, ❑Yes�No
or Federal Clean Air Act Title IV or Title V Permit?
If Yes:
i. Is the proj ect site located in an Air quality non-attainment area? (Area routinely or periodically fails to meet ❑Yes❑No
ambient air quality standards for all or some parts of the year)
ii. In addition to emissions as calculated in the application,the proj ect will generate:
• Tons/year(short tons)of Carbon Dioxide(COz)
. Tons/year(short tons)of Nitrous Oxide(Nz0)
. Tons/year(short tons)of Perfluorocarbons(PFCs)
• Tons/year(short tons)of Sulfur Hexafluoride(SF6)
• Tons/year(short tons)of Carbon Dioxide equivalent of Hydroflourocarbons(HFCs)
• Tons/year(short tons)of Hazardous Air Pollutants (HAPs)
Page 6 of 13
h.Will the proposed action generate or emit methane(including but not limited to, sewage treatment plants, ❑Yes�No
landfills,composting facilities)?
If Yes:
i. Estimate methane generation in tons/year(metric):
ii.Describe any methane capture, control or elimination measures included in proj ect design(e.g., combustion to generate heat or
electricity,flaring):
i.Will the proposed action result in the release of air pollutants from open-air operations or processes, such as ❑Yes�No
quarry or landfill operations?
If Yes: Describe operations and nature of emissions(e.g., diesel exhaust,rock particulates/dust):
j.Will the proposed action result in a substantial increase in traffic above present levels or generate substantial �Yes�No
new demand for transportation facilities or services?
If Yes:
i. When is the peak traffic expected(Check all that apply): ❑Morning �Evening ❑Weekend
�Randomly between hours of 4 pm to s pm
ii. For commercial activities only,projected number of semi-trailer truck trips/day: Not App�icab�e
iii. Parking spaces: Existing 403(prev.pro�) Proposed 522 Net increase/decrease +522
i>>. Does the proposed action include any shared use parking? �Yes�No
>>. If the proposed action includes any modification of existing roads, creation of new roads or change in existing access, describe:
Ormandy Lane will be extended.The western end or Whistler Court will be extended and turn south to intersect with Ormandy Lane.The western
end of Gibson Court will extend and turn north to intersect Excelsior Avenue.
>>i. Are public/private transportation service(s)or facilities available witl�in'/z mile of the proposed site? �Yes�No
vii Will the proposed action include access to public transportation or accommodations for use of hybrid, electric ❑Yes�No
or other alternative fueled vehicles?
>>iii.Will the proposed action include plans for pedestrian or bicycle accommodations for connections to existing �Yes❑No
pedestrian or bicycle routes?
k.Will the proposed action(for commercial or industrial projects only)generate new or additional demand �Yes❑No
for energy?
If Yes:
i. Estimate annual electricity demand during operation of the proposed action:
560,000 Kw
ii. Anticipated sources/suppliers of electricity for the project(e.g.,on-site combustion,on-site renewable,via grid/local utility,or
other):
Via Grid
iii. Will the proposed action require a new,or an upgrade to,an existing substation? �Yes�No
1.Hours of operation. Answer all items which apply.
i. During Construction: ii. During Operations:
• Monday -Friday: �am-�pm . Monday -Friday: 24 Hours
• SatuTday: 8am-7pm • SatuTday: 24 Hours
• Sunday: 8am-7pm • Sunday: 24 Hours
• Holidays: - • Holidays: 24 Hours
Page 7 of 13
m.Will the proposed action produce noise that will exceed existing ambient noise levels during construction, ❑Yes�No
operation,or both?
If yes:
i. Provide details including sources,time of day and duration:
ii. Will proposed action remove existing natural barriers that could act as a noise barrier or screen? ❑Yes�No
Describe:
n.. Will the proposed action have outdoor lighting? �Yes❑No
If yes:
i. Describe source(s),location(s),height of fiYture(s), direction/aim, and proximity to nearest occupied structures:
Pedestrian level street liqhts alonq sidewalks. Free standinq liqht fixtures will be provided in proposed parkinq lots.
ii. Will proposed action remove existing natural barriers that could act as a light barrier or screen? ❑Yes�No
Describe:
o. Does the proposed action have the potential to produce odors for more than one hour per day? ❑Yes�No
If Yes,describe possible sources,potential frequency and duration of odor emissions, and proximity to nearest
occupied structures:
p.Will the proposed action include any bulk storage of petroleum(combined capacity of over 1,100 gallons) ❑Yes�No
or chemical products 185 gallons in above ground storage or any amount in underground storage?
If Yes:
i. Product(s)to be stored
ii. Volume(s) per unit time (e.g.,month,year)
iii. Generally describe proposed storage facilities:
q.Will the proposed action(commercial,industrial and recreational proj ects only)use pesticides (i.e.,herbicides, �Yes ❑No
insecticides) during construction or operation?
If Yes:
i. Describe proposed treatment(s):
Typical pesticides and herbicides will be used on landscape and lawn areas.
ii. Will the ro osed action use Inte ated Pest Mana ement Practices? ❑ Yes ❑No
r.Will the proposed action(commercial or industrial proj ects only)involve or require the management or disposal � Yes ❑No
of solid waste(excluding hazardous materials)?
If Yes:
i. Describe any solid waste(s)to be generated during construction or operation of the facility:
• Construction: varies tons per (unit of time)
• Operation: 2o tons per month (unit of time)
ii. Describe any proposals for on-site minimization,recycling or reuse of materials to avoid disposal as solid waste:
• COnStrilCtlOn: Unkown
• Opel'3tlOn: Recydable materials such as paper,cardboard,glass and plastic will be removed from the waste stream.
iii. Proposed disposal methods/facilities for solid waste generated on-site:
• COnStrilCtlOn: Construction waste will be removed by a licensed hauler and transported to a facility permitted to accept construction debris.
• Opel'3tlOn: Solid waste will be removed by a licensed hauler.
Page 8 of 13
s.Does the proposed action include construction or modification of a solid waste management facility? ❑ Yes� No
If Yes:
i. Type of management or handling of waste proposed for the site(e.g.,recycling or transfer station, composting,landfill,or
other disposal activities):
ii. Anticipated rate of disposaUprocessing:
• Tons/month,if transfer or other non-combustion/thermal treatment,or
• Tons/hour,if combustion or thermal treatment
iii. If landfill,anticipated site life: years
t.Will proposed action at the site involve the commercial generation,treatment, storage,or disposal of hazardous ❑Yes�No
waste?
If Yes:
i. Name(s)of all hazardous wastes or constituents to be generated,handled or managed at facility:
ii. Generally describe processes or activities involving hazardous wastes or constituents:
iii. Specify amount to be handled or generated tons/month
i>>. Describe any proposals for on-site minimization,recycling or reuse of hazardous constituents:
>>. Will any hazardous wastes be disposed at an existing offsite hazardous waste facility? ❑Yes❑No
If Yes:provide name and location of facility:
If No: describe proposed management of any hazardous wastes which will not be sent to a hazardous waste facility:
E.Site and Setting of Proposed Action
E.1.Land uses on and surrounding the project site
a.Existing land uses.
i. Check all uses that occur on, adjoining and near the project site.
❑ Urban � Industrial � Commercial � Residential(suburban) ❑ Rural(non-farm)
� Forest ❑ Agriculture ❑ Aquatic ❑ Other(specify):
ii. If mix of uses,generally describe:
A mix of uses currently occupy adlacent properties includinq a hotel, condos,apartments,townhouses,a warehouse and woodlands.
b.Land uses and coverlypes on the proj ect site.
Land use or Current Acreage After Change
Covertype Acreage Project Completion (Acres+/-)
• Roads,buildings, and other paved or impervious
surfaces 1.81 7.71 +5.90
• Forested 17.52 11.68 -5.84
• Meadows,grasslands or brushlands (non-
agricultural,including abandoned agricultural) 3.76 0.45 -3.31
• Agricultural o 0 0
(includes active orchards,field,greenhouse etc.)
• Surface water features
(lakes,ponds, streams,rivers, etc.) �.�� �.25 +o.os
• Wetlands (freshwater or tidal) ��.2s ��.2s o
• Non-vegetated(bare rock, earth or fill) 0.35 0.�o 0.25
• Other
DeSCnbe:Landscaped areas induding planting and lawn 1.03 4.44 +3.41
Page 9 of 13
c.Is the proj ect site presently used by members of the community for public recreation? �Yes❑No
i. If Yes: exp131n: a walkinq and bikinq path extends from the intersection of Ormandy and Excelsior down to Sprinq Run Trail.
d.Are there any facilities serving children,the elderly,people with disabilities(e.g., schools,hospitals,licensed ❑Yes�No
day care centers,or group homes)within 1500 feet of the proj ect site?
If Yes,
i. Identify Facilities:
e.Does the project site contain an existing dam? ❑Yes�No
If Yes:
i. Dimensions of the dam and impoundment
• Dam height feet
• Dam length: feet
• Surface area: acres
• Volume impounded: gallons OR acre-feet
ii. Dam's existing hazard classification:
iii. Provide date and sllmrnarize results of last inspection:
£Has the proj ect site ever been used as a municipal, commercial or industrial solid waste management facility, ❑Yes�No
or does the project site adjoin property which is now,or was at one time,used as a solid waste management facility?
If Yes:
i. Has the facility been formally closed? ❑Yes❑ No
• If yes, cite sources/documentation:
ii. Describe the location of the proj ect site relative to the boundaries of the solid waste management facility:
iii. Describe any development constraints due to the prior solid waste activities:
g.Have hazardous wastes been generated,treated and/or disposed of at the site,or does the project site adjoin ❑Yes�No
property which is now or was at one time used to commercially treat, store and/or dispose of hazardous waste?
If Yes:
i. Describe waste(s)handled and waste management activities,including approximate time when activities occurred:
h. Potential contamination history. Has there been a reported spill at the proposed project site,or have any �Yes❑ No
remedial actions been conducted at or adjacent to the proposed site?
If Yes:
i. Is any portion of the site listed on the NYSDEC Spills Incidents database or Environmental Site �Yes❑No
Remediation database? Check all that apply:
❑ Yes—Spills Incidents database Provide DEC ID number(s):
� Yes—Environmental Site Remediation database Provide DEC ID number(s): 54so�5
❑ Neither database
ii. If site has been subject of RCRA corrective activities, describe control measures:
Coal Tar from Niaqara Mohawk site. Remedial action alonq Sprinq Run and associated wetlands completed in 2004.
iii. Is the project within 2000 feet of any site in the NYSDEC Environmental Site Remediation database? �Yes❑No
If yes,provide DEC ID number(s):54soos
i>>. If yes to(i), (ii)or(iii) above, describe current status of site(s):
Citv Landfill.Weibel Ave.the site has been capped and potential impacts have been reduced.
Page 10 of 13
>>. Is the proj ect site subj ect to an institutional control limiting property uses? ❑YesmNo
• If yes,DEC site ID number:
• Describe the type of institutional control(e.g., deed restriction or easement):
• Describe any use limitations:
• Describe any engineering controls:
• Will the project affect the institutional or engineering controls in place? ❑Yes❑No
• Explain:
E.2. Natural Resources On or Near Project Site
a.What is the average depth to bedrock on the project site? >6.5 feet
b.Are there bedrock outcroppings on the project site? ❑Yes�No
If Yes,what proportion of the site is comprised of bedrock outcroppings? N�A� %
c.Predominant soil type(s)present on proj ect site: F�uvaqvents frequent�y flooded 32 %
Windsor loamy sand(15-25%slope) 30 %
Windsor loamy sand(3-8%slope) 38 %
d.What is the average depth to the water table on the proj ect site? Average: s.5 feet
e.Drainage status of project site soils:� Well Drained: ss%of site
❑ Moderately Well Drained: %of site
� Poorly Drained 32%of site
£Approximate proporkion of proposed action site with slopes: � 0-10%: �5 %of site
� 10-15%: 5 %of site
� 15%or greater: �o %of site
g.Are there any unique geologic features on the project site? ❑Yes�No
If Yes,describe:
h. Surface water features.
i. Does any portion of the proj ect site contain wetlands or other waterbodies (including streams,rivers, �Yes❑No
ponds or lakes)?
ii. Do any wetlands or other waterbodies adjoin the project site? �Yes❑No
If Yes to either i or ii, continue. If No, skip to E2.i.
iii. Are any of the wetlands or waterbodies within or adjoining the project site regulated by any federal, mYes❑No
state or local agency?
i>>. For each identified regulated wetland and waterbody on the project site,provide the following information:
• Streams: Name 941-130(Spring Run) Classification C
� Lakes or Ponds: Name Classification
• Wetlands: Name Fww s-�s Approximate Size �4.6 ac
• Wetland No. (if regulated by DEC) s-�s
>>. Are any of the above water bodies listed in the most recent compilation of NYS water quality-impaired mYes❑[�Io
waterbodies?
If yes,name of impaired water body/bodies and basis for listing as impaired:
Spring Run,tributary to Lake Lonely/Phosphorus and Pathogens
i.Is the project site in a designated Floodway? �Yes❑No
j.Is the project site in the 100 year Floodplain? �Yes❑No
k.Is the project site in the 500 year Floodplain? �Yes❑No
L Is the project site located over,or immediately adjoining,a primary,principal or sole source aquifer? �Yes❑No
If Yes:
i. N3me Of 3qulfer: Principal Aquifer
Page 11 of 13
m. Identify the predominant wildlife species that occupy or use the proj ect site:
Deer
Birds
Rodents
n.Does the project site contain a designated significant natural community? ❑Yes�No
If Yes:
i. Describe the habitat/community (composition, function, and basis for designation):
ii. Source(s)of description or evaluation:
iii. Extent of community/habitat
• Currently: acres
• Following completion of proj ect as proposed: acres
• Gain or loss(indicate+or-): acres
o.Does proj ect site contain any species of plant or animal that is listed by the federal government or NYS as ❑Yes�No
endangered or threatened,or does it contain any areas identified as habitat for an endangered or threatened species?
p. Does the project site contain any species of plant or animal that is listed by NYS as rare,or as a species of ❑YesmNo
special concern?
q.Is the project site or adjoining area currently used for hunting,trapping,fishing or shell fishing? ❑Yes�No
If yes,give a brief description of how the proposed action may affect that use:
E.3. Designated Public Resources On or Near Project Site
a.Is the project site,or any porkion of it,located in a designated agricultural district cerkified pursuant to ❑Yes�No
Agriculture and Markets Law,Article 25-AA, Section 303 and 304?
If Yes, provide county plus district name/number:
b.Are agricultural lands consisting of highly productive soils present? ❑Yes�No
i. If Yes: acreage(s)onproject site?
ii. Source(s)of soil rating(s):
c. Does the proj ect site contain all or part of,or is it substantially contiguous to, a registered National ❑Yes�No
Natural Landmark?
If Yes:
i. Nature of the natural landmark: ❑Biological Community ❑ Geological Feature
ii. Provide brief description of landmark,including values behind designation and approximate size/extent
d.Is the project site located in or does it adjoin a state listed Critical Environmental Area? ❑Yes�No
If Yes:
i. CEA name:
ii. Basis for designation:
iii. Designating agency and date:
Page 12 of 13
�. Does tfie project site cc�ntain,or i� it tiulastantially cantiguuus to,a busldiit�,archaeological site,or clistrici ❑Ye�Na
��t7ich is li�ted oi7,or has been i�omia�at�t� by tl�e NYS Board of Historic Pres�rvation tar inclusion on,the
State or Natios�al Register of Hist��'ic PIace;?
If Yeti:
i. Nature of historie/arcl�aea[c�gical i-esaurce: ❑Archaeological Site ❑Hi,toric Buitding or Disti�ct
ii. Name:
-------- - —
iii. $rief description of attributes oti t��hich listin� is ba�ed:
f. Is the�7roject site,or any pc�iYrc�n of it, located in or ad_jacea�t to an aeea designaSed a,sensitive for �JYesONo
archaenlo��ical sices[�n the NY State Historic Preservatian dffce(SHPO)archaec�lu�ical site inventory?
g.Have additiailal ar�l7a�ofogical crs-histor-ic site(s)or resnurces bcen icientified on the projeet site'? ❑Yes�No
If Y�s:
r. Describe possible resaurce('��):
ri: Basis for identification;
h. Is the praject site w�ithii� tives miaes uf any officially desi��iated and publiciy acczssible federal, state,or local ❑1'zs�No
scenic or aesthetic resource'?
If Yes:
r. Identify resouree:
ir. N�tiii-e of,or basis for,designation (e.g.,estabiished Iligliway overlaok,state or local park,state I�istoric trail or scenic by��ay,
etc.):
.__ _ _.
iii. Distance betweei� project and resource: rni]es,
i. Is the project site �ocated���ithin a de�i��nated river coi-ridor ur�der the 1�'ild. Scenic and Recreatiosial Rivers 0 Ye��No
Program 6 NYCRR 6b6?
14�Yes:
r. Identify tl7e name of the river a��d iis de�i�natian:
ii, ls the activity coitsistent witfi developr��ent restractioils contained in 6NYCRR Part 6fi6'r �1�'es[�No
F. Additional Infarmatian
Attach any additional infonnatio�i ���hicli n7ay be needed to elarify yuur�rojeet.
If you ha��e identified any adverse impacts�vhich could be associated 4vith youi-proWosal,please describe lhose impact�;piti��ily
measures wltieh you prapose to avoid or minitnize thein.
G. �'erification
I certify tliat the inforn�ation provided ss ts'ue to the best of my knowledge.
AppliCant/Sponsor Na[ne John Witt,ExcA ior Park, LLC Dai� �A ��� /�/ �
�� �.,'\
�� ����
Signature Title President
` � �'
PRINT FORM Pati�e l3 ot' 13
�
�