Loading...
HomeMy WebLinkAbout20200383 Faden Mixed Use Application LANSING ENGINEERING, Pc Letter of Transmittal 2452 State Route 9,Suite 301 Malta,NY 1 2020 Telephone:(51 8)899-5243 Date: 6/23/2020 Pro #-749.05 Facsimile:(51 8]899-5245 Proj. Faden—West Ave. Site Plan To: Ms. Jennifer Merriman City of Saratoga Springs Planning Board 474 Broadway Saratoga Springs,NY 12866 We are sending you E Attached ❑Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ® Plans/Originals ❑Applications ® Copy of Letter ❑ Change Order ❑ Samples ®Report COPIES DATE NO. DESCRIPTION 3 6/23/2020 Site Plan Application 3 6/23/2020 Site Plan Review Checklist 3 6/23/2020 EAF 3 6/23/2020 DPW Agreement 3 6/23/2020 Water/ Sewer Report 3 6/23/2020 Streets Checklist 3 6/23/2020 Cost Estimate 3 6/23/2020 Traffic Study 3 6/23/2020 SWPPP 3 6/23/2020 Full Size Plan Set 3 6/23/2020 Elevation Plan 1 6/23/2020 CD THESE ARE TRANSMITTED as checked below: ®For approval ❑Approved as submitted ❑ Resubmit 1 copies for approval ❑ Other: ®For your use ❑Approved as noted ❑ Submit_copies for distribution DAs requested ❑ Returned for corrections ❑ Return corrected prints ®For review and comment ❑ For bids due ❑Borrowed prints returned AP SIGNED: + J Courtney L. Connors, Ad istrative Assistant for Copy filed to prior submissions Sean M. Farrell, CPESC, Senior Engineer cc: If enclosures are not as noted, kindly note us immediately P:\PROJECTS\74905-Faden-West Ave Site Plan\DESIGN APPLICATIONS CORRESPONDENCE\DRAFTS\74905-2020_06_17-City of Saratoga Springs Trans docx JFOR OFFICE USE1 CITY OF SARATOGA SPRINGS (Application#) PLANNING BOARD .A - (Date received) ` City Hall-474 Broadway z „r, vSaratoga Springs, New York 12866-2296 • ' Tel:518-587-3550 fax:518-580-9480 http://www.saratoga-springs.org Rev.12/2015 SITE PLAN REVIEW SUBMITTAL CHECKLIST Project Name: Faden -West Ave Site Plan Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga Springs' Zoning Ordinance Appendix B. The Planning Board reserves the right to request additional information, as necessary, to support an application. The Board also reserves the right to reject the application if these minimum requirements are not met. Please complete the checklist below and provide with your submission. REQUIRED ITEMS: *3 hard copies and I digital copy of ALL materials are required. CHECK EACH ITEM ** HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED** I. Completed Site Plan Application (3 hard copies -*I w/original signature-and I digital) and Fee 2. SEQR Environmental Assessment Form-short or long form as required by action. 3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not more than I"=50 feet). One digital version of all submittal items (pdf) shall be provided. 4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242. 5. Copy of signed DPW water connection agreement for all projects involving new water connections to the City system 6. Engineering Report for Water and Sanitary 7. Complete Streets Checklist 8. Project Cost Estimate-Quantities of work items and estimate of costs REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE: I. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with all corners set and marked on plan. A copy of the original property survey must also be included. 2. North arrow and map scale 3. Parcel tax map number 4. Site location map 5. Site vicinity map (all features within 300 feet of property) 6. Identification of zoning district with corresponding area requirements City of Saratoga Springs Site Plan Checklist I Z7. Building setback lines, either listed or shown on plans. Z 8. Title block with project name; name and address of applicant; and name and address of property owner (if different) Z 9. Topography data tied to NGVD 1929 datum Z10. Name of all adjacent property owners ZI 1. Parcel street address (existing and any proposed postal addresses) Yes No N/A 12. Identification of all existing or proposed easements, covenants or legal rights-of-way on this property Z ❑ III ❑ III 13. References to all prior variances or special use permits ZIII El 14. Existing and proposed contours and spot grades (at 2 foot intervals) IIIIII Z 15. Identification of all spoil or borrow areas Z ❑ ❑ 16. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains, rock outcroppings, etc. IIIIII Z 17. Location of proposed storage Z ❑ ❑ 18. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition of existing sidewalks) n ❑ ❑ 19. Location, design specifications and construction material for all proposed site improvements (drains, culverts, retaining walls, berms, fences, etc.) Z ❑ 1-1 20. Location and distance to fire hydrant ZIII El 21. Location, size, and material of all existing and proposed utility services ZEl 22. Parking lot layout plan and identification of all loading areas (number all spaces) ZEl 23. Parking demand calculations ZEl 24. Identification of parking spaces and access points for physically impaired persons ZEl 25. Location and screening plan for dumpster or recycling bins Z ❑ ❑ 26. Location, design,type of construction and materials, proposed use and exterior dimensions of all buildings (existing and proposed) on site IIIIII Z 27. Identification of storage of any potentially hazardous materials Z ❑ ❑ 28. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing plant material to be retained or removed. Z ❑ ❑ 29. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting fixtures ZEl 30. Erosion and sediment control plan–including designated concrete truck washout area Checklist prepared by: Lansing Engineering 6/19/20 Date: — City of Saratoga Springs Site Plan Checklist 2 City of Saratoga Springs Complete Streets Checklist Saratoga Springs Complete Street Policy Vision (May 2012) The City of Saratoga Springs Complete Streets Policy will encourage the development of a complete streets network throughout the City to create a more balanced transportation system. The Policy shall be consistent with and assist in achieving the goals and recommendations set forth in the City's Comprehensive Plan and other policy documents. The Policy shall ensure new and updated public and private projects are planned, designed, maintained and operated to enable safer, comfortable and convenient travel to the greatest extent possible for users of all abilities including pedestrians, bicyclists, motorists and transit riders. This checklist is intended to assist the City in achieving its vision for complete streets. Project Name: Faden -West Ave Site Plan Date: 6/19/20 Project Location / Limits: Corner of West Ave &Station Lane, Saratoga Springs, NY 12866 Project Description: Two proposed 4-story mixed use building, and associated parking lot. Instructions: For each box checked, please provide a brief description for how the item is addressed, not addressed, or not applicable and include supporting documentation. Street Classification (identify street or streets within the project area) Principal arterial ❑ Minor arterial ❑ Mixed use collector ❑ Mixed use local ❑■ Residential collector ❑ Residential local ❑ Special use street ❑ EXISTING CONDITIONS Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description Existing Bicycle &Pedestrian Operations Do bicycle and pedestrian accommodations exist? (see page 2 for ❑✓ ❑ ❑ A sidewalk exists along the front property line of examples) West Ave and across Station Lane. Existing Transit Operations Do transit facilities exist within the study area, including bus and ❑✓ ❑ ❑ Train station is located at end of Station Lane.Bus train stops/stations? stops are located along West Ave&Station Lane. Is the project area on a transit route? (CDTA Service Routes) ❑ ❑ El CDTA Route is located on both west Ave and Station Lane. Are there bicycle racks, shelters, or parking for transit riders ❑✓ ❑ ❑ Bike racks and shelters do not exist within the available? area. Existing Access and Mobility Do connective opportunities exist with schools, hospitals, senior ❑ ❑✓ ❑✓ care or community centers or persons with disabilities within Facilities are not located within project area? the project area. Are there gaps inhibiting continuous access between schools, ❑ ❑ ❑✓ hospitals, senior care, or community centers or persons with Facilities are not located within disabilities within project area?" the project area. Project Area Context Are there prominent landmarks, recreation, shopping, employment ❑ 0 ❑✓ center, cultural centers or other key destinations that offer Recreation, shopping centers are opportunities to connect this site? located along West Ave. Please list and/or describe planning or policy documents addressing bicyclist, pedestrian, transit, or truck/freight use for the project area. Examples can include: City of Saratoga Springs Comprehensive Plan, City of Saratoga Springs Open Space Plan, Capital District Transportation Committee Bicycle/ Pedestrian Priority Network, City Standard Details, etc. City of Saratoga Springs Comprehensive Plan, City of Saratoga Springs Open Space Plan, Capital District Transportation Committee Bicycle/Pedestrian Priority Network. City of Saratoga Springs Complete Streets Checklist 1 PROPOSED DESIGN Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description Complete Streets Design Bicyclist accommodations? LI ❑ ❑✓ Bicycle racks are proposed. Pedestrian accommodations? ❑ ❑ p Sidewalks are proposed along the front and interior of the project. Access and Mobility accommodations? ❑ ❑ E Ramps proposed for all accessible isles. Transit accommodations? ❑ ❑ ✓❑ Bus stops will remain at current locations. Truck/freight accommodations? ❑ ❑ E Truck access to dumpster is proposed. Streetscape elements? ❑ ❑ ❑ Street trees and light poles proposed along streetscape. Bike Facilities: Off-roadway bike ✓❑Yes ❑✓ No DNA accommodations Pedestrian Facilities: Dedicated bike lane ❑Yes ✓❑No DNA Sidewalks on both sides of 0Yes No DNA Shared-use lane ❑Yes ❑✓ No DNA the street Shoulder ❑Yes No DNA Striped crosswalks 0 Yes No DNA Acceptable actuated traffic ❑Yes❑No DNA Geometric modifications ❑✓ Yes❑No DNA signal bike detection, including to reduce crossing turn lanes distances such as curb Do signals allow adequate ❑Yes No❑✓ NA extensions (e.g. bulb-outs) minimum green time for Acceptable provision for D Yes❑No DNA bicyclist to safely cross pedestrian traffic signal intersection? features (e.g. ped. buttons) Signage and pavement ❑Yes ❑No DNA Pedestrian signage for MYes ❑No DNA markings specific to proposed crossing &wayfinding bike facilities Safety islands/medians on ❑ Yes ❑No❑✓ NA roadways with two or more Bicycle safe inlet grates ❑Yes ❑No nNA traffic lanes in each direction Bicycle parking, eg. bike racks, M Yes ❑No DNA Enhanced supplemental ❑Yes No❑✓ NA bike lockers Transit Facilities: pedestrian treatments at uncontrolled marked Transit shelters ['Yes❑✓ No DNA crBus turnouts El Yes ❑✓ No DNA Connectivity:oncs Standing pads ❑✓ Yes No DNA Are there proposed E Yes Flo DNA Has CDTA been contacted? ❑Yes❑✓ No DNA connections to other bike Access and Mobility Facilities: paths, pedestrian facilities, or Adequate sidewalk or paved ❑✓ Yes ENO DNA transit facilities? path Are there proposed M Yes No DNA Acceptable D Yes ❑No CNA connections to any key consideration/provision for destinations listed on page 1? accessible pedestrian traffic Are there proposed M Yes ❑No DNA signal features connections to Curb ramps, including E Yes No DNA neighborhoods? detectable warning Streetscape Elements: surface Are streetscape elements ❑✓ Yes ❑No LINA Acceptable slope and ❑✓ Yes No DNA proposed such as cross-slope for driveway ramps, landscaping, street trees, sidewalks, crossings) planters, buffer strips, etc? Have conflicts been reduced ❑✓ Yes❑ No❑ NA Pedestrian-level lighting ❑✓ Yes No DNA among pedestrian, bicyclists, and motor vehicles (access Public seating or benches ❑✓ Yes No DNA management)? Design Standards and Guidelines Design meets guidelines such as described below for ❑Yes ❑No ❑NA Proposed design along with existing features meets bicycle/pedestrian/bus/transit facilities? guidelines described below. *American Association of State Highway and Transportation Officials(AASHTO)-A Policy on Geometric Design of Highway and Streets, Guide for the Development of Bicycle Facilities and AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities;Public Right-of-Way Accessibility Guide(PROWAG); Manual on Uniform Traffic Control Devices(MUTCD);Americans with Disabilities Act Accessibility Guidelines(ADAAG); National Association of City Transportation Officials(NACTO)- Urban Bikeway Design Guide. New York State Department of Transportation— Highwav Design Manual City of Saratoga Springs Complete Streets Checklist 2 [FOR OFFICE USE' CITY OF SARATOGA SPRINGS (Application#) PLANNING BOARD (Date received) City Hall-474 Broadway ... • t} Saratoga Springs, New York 12866-2296 Tel:518-587-3550 fax:518-580-9480 http://www.saratoga-springs.org APPLICATION FOR: (Rev: 12/2015) SITE PLAN REVIEW (INCLUDING PUD) ***Application Check List-All submissions must include completed application check list and all required items. Project Name:Faden-West Ave Site Plan Corner of West Ave&Station Lane, Saratoga Springs, NY 12866 Property Address/Location: 165-2-76.2 T-5 Transect Zone 5 Neighborhood Center Tax Parcel #: Zoning District: (for example: 165.52-4-377 Mixed Use- Retail, Multi-Family Condominiums Proposed Use: Date special use permit granted (if any): TBD Date zoning variance granted (if any): N/A Is property located within (check all that apply)?: _Historic District ✓krchitectural Review District BOO' of a State Park, city boundary, or county/state highway APPLICANT(S)" OwNER(S) (/1 not applicant) ATTORNEY/AGENT Faden Enterprises Inc, Russel Faden Faden Enterprises Inc, Lansing Engineering Name 29 Liz Ann Drive 29 Liz Ann Drive 2452 State Route 9 Address Saratoga Springs, NY 12866 Saratoga Springs, NY 12866 Malta, NY 12020 518-796-3716 518-796-3716 518-899-5243 Phone russellfaden@yahoo.com russellfaden@yahoo.com ysl@lansingengineering.com Email Identify primary contact person:Applicantwner /Agent *An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question. City of Saratoga Springs-Site Plan Review Application 1 0/U/2020 Ui:1t1 VI Hann fiZ(4 i;.triln;MaSUOUla rage: Application fee; A check for the total amount below payable to:'•corrzrYrissi:!jfgr of Finance"MUST accompany this application. 0 Sketch Plan- $250 $ _ El Final Sim Flan Approval 56 un1# $8,650 Residential- $250 plus$150/unit $ 5,425 sf=$i,042 Non-Residential- $500 plus$100/1,000 SQ. FT, flmodrfitation Residential- $250 $ Non-Residential- $500 $..._-.. $9,692 Total $ Submission Deadline—Check City's website(www.sarataga-sprirts,o )for application deadlines and meeting dates. Does any City officer,employee or farity,merrti_ `.t thereof have a financial interest(as defined by General Municipal Law Section 809)in this application? YES_ _NO i '_. if YES,a statement disclosing the name,residence,Nature and extent ofthis interest must befiled with fts application. I,the undersigned owner,leasee or purchaser under contract for the property,hereby request Site Plan Review by the •ii&I _l.. .n _J-_r, ^ten -7'1 �Cr_6.T� Planning aro for Tfl>=icACisCm u pt&.9J LX CL1Uvtl: s d�A LIJ £L Las,ic9uui-w,iusaa i-iFF'-n n ,.�,..r„..,.. r.-.r,,,....�.iu, Ordinance of the City of Saratoga Springs. f urtherraore,I hereby eathorixe members of the flaming Board and designated City staff to enter the property associated with this application for purposes of conducting any necessary site inspections relating to this application. Applicant Ssgnature: . TX- ._. bate: 6/11/217 If applicant Is not current owner,owner must also sign. 6/11120 Owner Signature: ... Date: Ow of Sararoga Springre Sita Plan Rauigw APphc'or 2