HomeMy WebLinkAbout20200383 Faden Mixed Use Application LANSING ENGINEERING, Pc Letter of Transmittal
2452 State Route 9,Suite 301
Malta,NY 1 2020
Telephone:(51 8)899-5243 Date: 6/23/2020 Pro #-749.05
Facsimile:(51 8]899-5245 Proj.
Faden—West Ave. Site Plan
To: Ms. Jennifer Merriman
City of Saratoga Springs
Planning Board
474 Broadway
Saratoga Springs,NY 12866
We are sending you E Attached ❑Under separate cover via the following items:
❑ Shop Drawings ❑ Prints ® Plans/Originals ❑Applications
® Copy of Letter ❑ Change Order ❑ Samples ®Report
COPIES DATE NO. DESCRIPTION
3 6/23/2020 Site Plan Application
3 6/23/2020 Site Plan Review Checklist
3 6/23/2020 EAF
3 6/23/2020 DPW Agreement
3 6/23/2020 Water/ Sewer Report
3 6/23/2020 Streets Checklist
3 6/23/2020 Cost Estimate
3 6/23/2020 Traffic Study
3 6/23/2020 SWPPP
3 6/23/2020 Full Size Plan Set
3 6/23/2020 Elevation Plan
1 6/23/2020 CD
THESE ARE TRANSMITTED as checked below:
®For approval ❑Approved as submitted ❑ Resubmit 1 copies for approval ❑ Other:
®For your use ❑Approved as noted ❑ Submit_copies for distribution
DAs requested ❑ Returned for corrections ❑ Return corrected prints
®For review and comment ❑ For bids due ❑Borrowed prints returned
AP
SIGNED: + J
Courtney L. Connors, Ad istrative Assistant for
Copy filed to prior submissions
Sean M. Farrell, CPESC, Senior Engineer
cc: If enclosures are not as noted, kindly note us immediately
P:\PROJECTS\74905-Faden-West Ave Site Plan\DESIGN APPLICATIONS CORRESPONDENCE\DRAFTS\74905-2020_06_17-City of Saratoga Springs Trans docx
JFOR OFFICE USE1
CITY OF SARATOGA SPRINGS
(Application#)
PLANNING BOARD
.A - (Date received)
` City Hall-474 Broadway
z „r, vSaratoga Springs, New York 12866-2296
• ' Tel:518-587-3550 fax:518-580-9480
http://www.saratoga-springs.org
Rev.12/2015
SITE PLAN REVIEW SUBMITTAL CHECKLIST
Project Name: Faden -West Ave Site Plan
Listed below are the minimum submittal requirements for site plan review as set forth in The City of Saratoga
Springs' Zoning Ordinance Appendix B. The Planning Board reserves the right to request additional
information, as necessary, to support an application. The Board also reserves the right to reject the application
if these minimum requirements are not met. Please complete the checklist below and provide with your
submission.
REQUIRED ITEMS: *3 hard copies and I digital copy of ALL materials are required.
CHECK EACH ITEM ** HANDWRITTEN APPLICATIONS WILL NOT BE ACCEPTED**
I. Completed Site Plan Application (3 hard copies -*I w/original signature-and I digital) and Fee
2. SEQR Environmental Assessment Form-short or long form as required by action.
3. Set of plans including: (3) large scale plans (sheets must be 24" x 36", drawn to a scale of not
more than I"=50 feet). One digital version of all submittal items (pdf) shall be provided.
4. Basic or Full Storm Water Pollution Prevention Plan as required per City Code Chapter 242.
5. Copy of signed DPW water connection agreement for all projects involving new water connections
to the City system
6. Engineering Report for Water and Sanitary
7. Complete Streets Checklist
8. Project Cost Estimate-Quantities of work items and estimate of costs
REQUIRED ITEMS ON SITE PLAN, AS APPLICABLE:
I. Property line survey prepared by a licensed land surveyor. Site plan must reference such survey with
all corners set and marked on plan. A copy of the original property survey must also be included.
2. North arrow and map scale
3. Parcel tax map number
4. Site location map
5. Site vicinity map (all features within 300 feet of property)
6. Identification of zoning district with corresponding area requirements
City of Saratoga Springs Site Plan Checklist I
Z7. Building setback lines, either listed or shown on plans.
Z 8. Title block with project name; name and address of applicant; and name and address of property
owner (if different)
Z 9. Topography data tied to NGVD 1929 datum
Z10. Name of all adjacent property owners
ZI 1. Parcel street address (existing and any proposed postal addresses)
Yes No N/A 12. Identification of all existing or proposed easements, covenants or legal rights-of-way on this property
Z ❑
III ❑ III 13. References to all prior variances or special use permits
ZIII El 14. Existing and proposed contours and spot grades (at 2 foot intervals)
IIIIII Z 15. Identification of all spoil or borrow areas
Z ❑ ❑ 16. Identification of all watercourses, designated State wetlands, buffers, Federal wetlands, floodplains,
rock outcroppings, etc.
IIIIII Z 17. Location of proposed storage
Z ❑ ❑ 18. Identification of all existing or proposed sidewalks or pedestrian paths (show type, size and condition
of existing sidewalks)
n ❑ ❑ 19. Location, design specifications and construction material for all proposed site improvements (drains,
culverts, retaining walls, berms, fences, etc.)
Z ❑ 1-1 20. Location and distance to fire hydrant
ZIII El 21. Location, size, and material of all existing and proposed utility services
ZEl 22. Parking lot layout plan and identification of all loading areas (number all spaces)
ZEl 23. Parking demand calculations
ZEl 24. Identification of parking spaces and access points for physically impaired persons
ZEl 25. Location and screening plan for dumpster or recycling bins
Z ❑ ❑ 26. Location, design,type of construction and materials, proposed use and exterior dimensions of all
buildings (existing and proposed) on site
IIIIII Z 27. Identification of storage of any potentially hazardous materials
Z ❑ ❑ 28. Planting plan identifying quantity, species and size of all proposed new plant materials. Label existing
plant material to be retained or removed.
Z ❑ ❑ 29. Lighting plan showing type, location and intensity of all existing and proposed exterior lighting
fixtures
ZEl 30. Erosion and sediment control plan–including designated concrete truck washout area
Checklist prepared by: Lansing Engineering 6/19/20
Date: —
City of Saratoga Springs Site Plan Checklist 2
City of Saratoga Springs Complete Streets Checklist
Saratoga Springs Complete Street Policy Vision (May 2012)
The City of Saratoga Springs Complete Streets Policy will encourage the development of a complete streets
network throughout the City to create a more balanced transportation system. The Policy shall be consistent
with and assist in achieving the goals and recommendations set forth in the City's Comprehensive Plan and
other policy documents. The Policy shall ensure new and updated public and private projects are planned,
designed, maintained and operated to enable safer, comfortable and convenient travel to the greatest extent
possible for users of all abilities including pedestrians, bicyclists, motorists and transit riders.
This checklist is intended to assist the City in achieving its vision for complete streets.
Project Name: Faden -West Ave Site Plan Date: 6/19/20
Project Location / Limits: Corner of West Ave &Station Lane, Saratoga Springs, NY 12866
Project Description: Two proposed 4-story mixed use building, and associated parking lot.
Instructions: For each box checked, please provide a brief description for how the item is addressed,
not addressed, or not applicable and include supporting documentation.
Street Classification (identify street or streets within the project area)
Principal arterial ❑ Minor arterial ❑ Mixed use collector ❑ Mixed use local ❑■
Residential collector ❑ Residential local ❑ Special use street ❑
EXISTING CONDITIONS
Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description
Existing Bicycle &Pedestrian Operations
Do bicycle and pedestrian accommodations exist? (see page 2 for ❑✓ ❑ ❑ A sidewalk exists along the front property line of
examples) West Ave and across Station Lane.
Existing Transit Operations
Do transit facilities exist within the study area, including bus and ❑✓ ❑ ❑ Train station is located at end of Station Lane.Bus
train stops/stations? stops are located along West Ave&Station Lane.
Is the project area on a transit route? (CDTA Service Routes) ❑ ❑ El CDTA Route is located on both west Ave and Station Lane.
Are there bicycle racks, shelters, or parking for transit riders ❑✓ ❑ ❑ Bike racks and shelters do not exist within the
available? area.
Existing Access and Mobility
Do connective opportunities exist with schools, hospitals, senior ❑ ❑✓ ❑✓
care or community centers or persons with disabilities within Facilities are not located within
project area? the project area.
Are there gaps inhibiting continuous access between schools, ❑ ❑ ❑✓
hospitals, senior care, or community centers or persons with Facilities are not located within
disabilities within project area?" the project area.
Project Area Context
Are there prominent landmarks, recreation, shopping, employment ❑ 0 ❑✓
center, cultural centers or other key destinations that offer Recreation, shopping centers are
opportunities to connect this site? located along West Ave.
Please list and/or describe planning or policy documents addressing bicyclist, pedestrian, transit, or truck/freight use for
the project area. Examples can include: City of Saratoga Springs Comprehensive Plan, City of Saratoga Springs Open
Space Plan, Capital District Transportation Committee Bicycle/ Pedestrian Priority Network, City Standard Details, etc.
City of Saratoga Springs Comprehensive Plan, City of Saratoga Springs Open Space Plan, Capital
District Transportation Committee Bicycle/Pedestrian Priority Network.
City of Saratoga Springs Complete Streets Checklist 1
PROPOSED DESIGN
Item to Be Addressed/ Checklist Consideration YES NO N/A Required Description
Complete Streets Design
Bicyclist accommodations? LI ❑ ❑✓ Bicycle racks are proposed.
Pedestrian accommodations? ❑ ❑ p Sidewalks are proposed along the front and interior of the project.
Access and Mobility accommodations? ❑ ❑ E Ramps proposed for all accessible isles.
Transit accommodations? ❑ ❑ ✓❑ Bus stops will remain at current locations.
Truck/freight accommodations? ❑ ❑ E Truck access to dumpster is proposed.
Streetscape elements? ❑ ❑ ❑ Street trees and light poles proposed along streetscape.
Bike Facilities:
Off-roadway bike ✓❑Yes ❑✓ No DNA
accommodations Pedestrian Facilities:
Dedicated bike lane ❑Yes ✓❑No DNA Sidewalks on both sides of 0Yes No DNA
Shared-use lane ❑Yes ❑✓ No DNA the street
Shoulder ❑Yes No DNA Striped crosswalks 0 Yes No DNA
Acceptable actuated traffic ❑Yes❑No DNA
Geometric modifications ❑✓ Yes❑No DNA
signal bike detection, including to reduce crossing
turn lanes distances such as curb
Do signals allow adequate ❑Yes No❑✓ NA extensions (e.g. bulb-outs)
minimum green time for Acceptable provision for D Yes❑No DNA
bicyclist to safely cross pedestrian traffic signal
intersection? features (e.g. ped. buttons)
Signage and pavement ❑Yes ❑No DNA Pedestrian signage for MYes ❑No DNA
markings specific to proposed crossing &wayfinding
bike facilities Safety islands/medians on ❑ Yes ❑No❑✓ NA
roadways with two or more
Bicycle safe inlet grates ❑Yes ❑No nNA traffic lanes in each direction
Bicycle parking, eg. bike racks, M Yes ❑No DNA Enhanced supplemental ❑Yes No❑✓ NA
bike lockers
Transit Facilities: pedestrian treatments at
uncontrolled marked
Transit shelters ['Yes❑✓ No DNA
crBus turnouts El Yes ❑✓ No DNA Connectivity:oncs
Standing pads ❑✓ Yes No DNA
Are there proposed E Yes Flo DNA
Has CDTA been contacted? ❑Yes❑✓ No DNA
connections to other bike
Access and Mobility Facilities: paths, pedestrian facilities, or
Adequate sidewalk or paved ❑✓ Yes ENO DNA transit facilities?
path Are there proposed M Yes No DNA
Acceptable D Yes ❑No CNA connections to any key
consideration/provision for destinations listed on page 1?
accessible pedestrian traffic Are there proposed M Yes ❑No DNA
signal features connections to
Curb ramps, including E Yes No DNA neighborhoods?
detectable warning Streetscape Elements:
surface Are streetscape elements ❑✓ Yes ❑No LINA
Acceptable slope and ❑✓ Yes No DNA proposed such as
cross-slope for driveway ramps, landscaping, street trees,
sidewalks, crossings) planters, buffer strips, etc?
Have conflicts been reduced ❑✓ Yes❑ No❑ NA Pedestrian-level lighting ❑✓ Yes No DNA
among pedestrian, bicyclists,
and motor vehicles (access Public seating or benches ❑✓ Yes No DNA
management)?
Design Standards and Guidelines
Design meets guidelines such as described below for ❑Yes ❑No ❑NA Proposed design along with existing features meets
bicycle/pedestrian/bus/transit facilities? guidelines described below.
*American Association of State Highway and Transportation Officials(AASHTO)-A Policy on Geometric Design of Highway and Streets, Guide for
the Development of Bicycle Facilities and AASHTO Guide for the Planning, Design, and Operation of Pedestrian Facilities;Public Right-of-Way
Accessibility Guide(PROWAG); Manual on Uniform Traffic Control Devices(MUTCD);Americans with Disabilities Act Accessibility Guidelines(ADAAG);
National Association of City Transportation Officials(NACTO)- Urban Bikeway Design Guide. New York State Department of Transportation—
Highwav Design Manual
City of Saratoga Springs Complete Streets Checklist 2
[FOR OFFICE USE'
CITY OF SARATOGA SPRINGS (Application#)
PLANNING BOARD
(Date received)
City Hall-474 Broadway
...
•
t} Saratoga Springs, New York 12866-2296
Tel:518-587-3550 fax:518-580-9480
http://www.saratoga-springs.org
APPLICATION FOR: (Rev: 12/2015)
SITE PLAN REVIEW
(INCLUDING PUD)
***Application Check List-All submissions must include completed application check list and all required
items.
Project Name:Faden-West Ave Site Plan
Corner of West Ave&Station Lane, Saratoga Springs, NY 12866
Property Address/Location:
165-2-76.2 T-5 Transect Zone 5 Neighborhood Center
Tax Parcel #: Zoning District:
(for example: 165.52-4-377
Mixed Use- Retail, Multi-Family Condominiums
Proposed Use:
Date special use permit granted (if any): TBD Date zoning variance granted (if any): N/A
Is property located within (check all that apply)?: _Historic District ✓krchitectural Review District
BOO' of a State Park, city boundary, or county/state highway
APPLICANT(S)" OwNER(S) (/1 not applicant) ATTORNEY/AGENT
Faden Enterprises Inc, Russel Faden Faden Enterprises Inc, Lansing Engineering
Name
29 Liz Ann Drive 29 Liz Ann Drive 2452 State Route 9
Address
Saratoga Springs, NY 12866 Saratoga Springs, NY 12866 Malta, NY 12020
518-796-3716 518-796-3716 518-899-5243
Phone
russellfaden@yahoo.com russellfaden@yahoo.com ysl@lansingengineering.com
Email
Identify primary contact person:Applicantwner /Agent
*An applicant must be the property owner, lessee, or one with an option to lease or purchase the property in question.
City of Saratoga Springs-Site Plan Review Application 1
0/U/2020 Ui:1t1 VI Hann fiZ(4 i;.triln;MaSUOUla rage:
Application fee; A check for the total amount below payable to:'•corrzrYrissi:!jfgr of Finance"MUST accompany this
application.
0 Sketch Plan- $250 $ _
El Final Sim Flan Approval 56 un1# $8,650
Residential- $250 plus$150/unit
$
5,425 sf=$i,042
Non-Residential- $500 plus$100/1,000 SQ. FT,
flmodrfitation
Residential- $250 $
Non-Residential- $500 $..._-..
$9,692
Total $
Submission Deadline—Check City's website(www.sarataga-sprirts,o )for application deadlines and meeting dates.
Does any City officer,employee or farity,merrti_ `.t thereof have a financial interest(as defined by General Municipal Law
Section 809)in this application? YES_ _NO i '_. if YES,a statement disclosing the name,residence,Nature and
extent ofthis interest must befiled with fts application.
I,the undersigned owner,leasee or purchaser under contract for the property,hereby request Site Plan Review by the
•ii&I _l.. .n _J-_r, ^ten -7'1 �Cr_6.T�
Planning
aro for Tfl>=icACisCm u pt&.9J LX CL1Uvtl: s d�A LIJ £L Las,ic9uui-w,iusaa i-iFF'-n n ,.�,..r„..,.. r.-.r,,,....�.iu,
Ordinance of the City of Saratoga Springs.
f urtherraore,I hereby eathorixe members of the flaming Board and designated City staff to enter the property
associated with this application for purposes of conducting any necessary site inspections relating to this application.
Applicant Ssgnature: . TX- ._. bate:
6/11/217
If applicant Is not current owner,owner must also sign.
6/11120
Owner Signature: ... Date:
Ow of Sararoga Springre Sita Plan Rauigw APphc'or 2