Loading...
HomeMy WebLinkAbout20200078 Caruso 2-family Dwelling – Final Details NOD (2) C springs.org-www.saratoga 9480-580-3550 x.2515 fax: 518-587-Tel: 518 Saratoga Springs, New York 12866 474 Broadway -City Hall  OMMISSION C EVIEW R ESIGN D PRINGS S ARATOGA S ITY OF Tamie Ehinger, Chair Leslie DiCarlo Chris Bennett Leslie Mechem Rob DuBoff Ellen Sheehan Steven Rowland, Alternate Kenneth Ritzenberg, Alternate N OTICE OF D ECISION In the matter of the application #20200078 Caruso 2-family Dwelling – Final Details 173 Lake Ave Saratoga Springs, New York 12866 involving Architectural Review of the construction of a new 2-family dwelling within the Urban Residential-3 district, tax parcel #166.45-3-46 within the City of Saratoga Springs. In accordance with 6 NYCRR Part 617, the Design Review Commission classified this action as a SEQRA Unlisted Action. The DRC reviewed the submitted SEAF Part I and evaluated any potentially adverse environmental impact as part of this action. Based upon the information provided and the analysis conducted, including any supporting documentation, the DRC determined that the proposed action would not result in any significant adverse environmental impacts and has issued a SEQRA negative declaration. And, in accordance with the objectives, standards and guidelines contained in the City Zoning Ordinance Article 240-7.5 Architectural Review, the Design Review Commission issues the following decision on June 17, 2020:  Approve as shown on the revised plans with the following conditions: Trim to be fiber cement product with smooth face. Note: this approval shall expire 18 months from the issuance date unless any necessary building permit has been issued and actual work begun. Record of vote: motion to approve made by ESheehan, seconded by LMechem: passed 5-0 In favor: TEhinger, LDiCarlo, LMechem, RDuBoff, ESheehan Absent: CBennett As a result of this decision, the applicant:  may proceed with the proposed project as approved Please contact the Building Department to verify permit requirements. June 18, 2020 Chair Received by Accounts cc: Building Department; File; Accounts Dept.; Applicant/Agent Page 1 of 1