Loading...
HomeMy WebLinkAbout18.027 Lake Local Admin Action Decision kry0G.4, r CITY OF SARATOGA SPRINGS MARK TORPEY, Chair JAM IN TOTINO, Vice Chair irot PLANNING BOARD TODD FABOZZI RUTH HORTON Y CityHall -474 BroadwaySARA BOIVIN ,,' LEXIE BONITATIBUS Saratoga Springs, New York 12866 KERRY MAYO R �, Tel 518-587-3550 fax 518-580-9480 SHAWNA ENKS,Alternate '°RATE) www.saratoga-springs.org J NOTICE OF ADMINISTRATIVE ACTION In the matter of the request for site plan modification relating to application PB APP. #18.027 LAKE LOCAL 550 UNION AVE. SARATOGA SPRINGS, NY 12866 to permit the modification of the original approval granted September 20, 2018 in the following manner: Approve site plan modification plan set dated Nov. 21, 2019 and revisions as described in accompanying narrative submitted Dec. 16, 2019. With the following exceptions and conditions: • The off-season boat storage location identified on the layout plan is not permitted. • Applicant will provide a$4,000 landscape allowance to supplement landscaping as shown on the revised plan and as per memo dated January 17, 2020 from LA Group. Final locations, size, species to be determined by the Chair. • Relocation of a portion of the shared vehicular access for adjoining residential neighbor use only per revised drawing submitted via email April 17, 2020 from LA Group. • Additional "do not enter/residential driveway" signs are to be located at the entrance of the driveway from Union Ave. and at the south end of the parking lot leading to the lake. • The removable bollards will be replaced with a 12-ft.wide gate with reflective signage on both sides - "do not block—emergency traffic only" or similar sign. The area in front of the gate shall be kept clear of snow in the winter and such language shall be included in the revised shared access agreement. • Revised shared access easement agreement shall include provision for both seasonal and long-term maintenance of the driveway, and temporary opening of the gate upon special circumstances—such as large deliveries, moving vehicles, etc. Final language shall be reviewed by the City Attorney and filed at the Saratoga County Clerk's Office prior to acceptance of as-built drawings. • Acceptable crosswalk design, placement, signage at the commercial entrance across Union Ave.to be approved by DOT("crosswalk sketch plan 4/10/2020" conceptually approved by DOT) submitted via email April 24, 2020 from LA Group. Pedestrian access from the crosswalk to the building shall be included in the design and approved by the Chair. • Applicant shall monitor and maintain the long-term performance of its stormwater management system to ensure that neighboring parcels are not adversely impacted. • The conditions of the original approval remain in effect unless revised per this modification. The Chairperson of the Planning Board finds that, in accordance with 7.2.1 I.G City's Zoning Ordinance, the requested action is not substantive in nature and is not contrary to the intent of the original decision. Therefore, the request for administrative action, as described above, is approved. Page I of 2 'tqlralf?‹ May 15, 2020 Date Chair cc: Building Dept., DPW, DPS,Accounts Dept. Applicant/Agent File